Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Management Science Letters » Building information modelling (BIM) and knowledge management in implementation for con-struction projects

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (804)
  • IJDS (992)
  • DSL (722)
  • ESM (434)
  • CCL (544)
  • JPM (323)
  • AC (567)
  • JFS (101)
  • MSL (2653)
  • USCM (1104)
  • HE (49)
  • SCI (50)

MSL Volumes

    • ▼ Volume 16 (16)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
    • ▼ Volume 15 (24)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (9)
    • ▼ Volume 14 (22)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 13 (27)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (5)
      • Issue 4 (7)
    • ▼ Volume 12 (33)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (13)
    • ▼ Volume 11 (251)
      • Issue 1 (36)
      • Issue 2 (39)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (29)
      • Issue 6 (27)
      • Issue 7 (20)
      • Issue 8 (12)
      • Issue 9 (8)
    • ▼ Volume 10 (448)
      • Issue 1 (24)
      • Issue 2 (25)
      • Issue 3 (24)
      • Issue 4 (25)
      • Issue 5 (26)
      • Issue 6 (26)
      • Issue 7 (25)
      • Issue 8 (27)
      • Issue 9 (27)
      • Issue 10 (30)
      • Issue 11 (33)
      • Issue 12 (30)
      • Issue 13 (30)
      • Issue 14 (30)
      • Issue 15 (30)
      • Issue 16 (36)
    • ▼ Volume 9 (208)
      • Issue 1 (16)
      • Issue 2 (14)
      • Issue 3 (11)
      • Issue 4 (12)
      • Issue 5 (12)
      • Issue 6 (16)
      • Issue 7 (16)
      • Issue 8 (16)
      • Issue 9 (16)
      • Issue 10 (16)
      • Issue 11 (19)
      • Issue 12 (20)
      • Issue 13 (24)
    • ▼ Volume 8 (119)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (22)
      • Issue 6 (20)
      • Issue 7 (6)
      • Issue 8 (6)
      • Issue 9 (8)
      • Issue 10 (10)
      • Issue 11 (11)
      • Issue 12 (16)
    • ▼ Volume 7 (54)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (5)
      • Issue 6 (5)
      • Issue 7 (4)
      • Issue 8 (4)
      • Issue 9 (4)
      • Issue 10 (4)
      • Issue 11 (4)
      • Issue 12 (4)
    • ▼ Volume 6 (74)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (7)
      • Issue 5 (6)
      • Issue 6 (6)
      • Issue 7 (8)
      • Issue 8 (6)
      • Issue 9 (5)
      • Issue 10 (5)
      • Issue 11 (5)
      • Issue 12 (5)
    • ▼ Volume 5 (129)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (10)
      • Issue 4 (12)
      • Issue 5 (14)
      • Issue 6 (14)
      • Issue 7 (8)
      • Issue 8 (8)
      • Issue 9 (11)
      • Issue 10 (8)
      • Issue 11 (9)
      • Issue 12 (10)
    • ▼ Volume 4 (387)
      • Issue 1 (34)
      • Issue 2 (30)
      • Issue 3 (34)
      • Issue 4 (42)
      • Issue 5 (33)
      • Issue 6 (43)
      • Issue 7 (42)
      • Issue 8 (40)
      • Issue 9 (39)
      • Issue 10 (20)
      • Issue 11 (18)
      • Issue 12 (12)
    • ▼ Volume 3 (426)
      • Issue 1 (40)
      • Issue 2 (47)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (27)
      • Issue 6 (50)
      • Issue 7 (51)
      • Issue 8 (30)
      • Issue 9 (24)
      • Issue 10 (25)
      • Issue 11 (25)
      • Issue 12 (27)
    • ▼ Volume 2 (365)
      • Issue 1 (51)
      • Issue 2 (32)
      • Issue 3 (40)
      • Issue 4 (44)
      • Issue 5 (42)
      • Issue 6 (52)
      • Issue 7 (53)
      • Issue 8 (51)
    • ▼ Volume 1 (70)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (25)

🔑 Keywords

Supply chain management(168)
Jordan(167)
Vietnam(154)
Customer satisfaction(124)
Performance(116)
Supply chain(113)
Artificial intelligence(99)
Competitive advantage(98)
Service quality(98)
Tehran Stock Exchange(94)
SMEs(92)
Sustainability(91)
optimization(88)
TOPSIS(85)
Trust(84)
Financial performance(84)
Job satisfaction(81)
Knowledge Management(80)
Genetic Algorithm(80)
Social media(79)


» Show all keywords

✍️ Authors

Naser Azad(83)
Zeplin Jiwa Husada Tarigan(67)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(38)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Hassan Ghodrati(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(29)
Shankar Chakraborty(29)
Prasadja Ricardianto(28)
Sulieman Ibraheem Shelash Al-Hawary(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (8)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Management Science Letters
ISSN 1923-9343 (Online) - ISSN 1923-9335 (Print)
Quarterly Publication
Volume 13 Issue 4 pp. 277-286, 2023

Building information modelling (BIM) and knowledge management in implementation for con-struction projects Pages 277-286 Right click to download the paper Download PDF

Authors: Mohamed Saeed, Harith Yas

📋 Author Affiliations:
Mohamed Saeed1, Harith Yas2
1 Manager of Pavement and Materials Quality, Roads and Transport Authority, Dubai, United Arab Emirates
2 Azman Hashim International Business School, Universiti Technologi Malaysia, Johor 81310, Malaysia
doi 10.5267/j.msl.2023.10.099
Crossref Source: CrossRef

🔑 Keywords: Life Cycle Cost Assessment, Wast Management, Dubai, Concrete

Abstract: The widespread use of knowledge management in a wide range of applications aids in professionally and wisely streamlining the procedure to produce improved outcomes and deliverables. Knowledge management is essential in the construction sector due to the considerable investment, extended deadlines and the need for higher performance efficiency and quality. The usage of BIM in construction projects has simplified the procedures required in building construction. The fundamental motivation behind the creation of BIM was the need to apply knowledge management approaches to make projects more sustainable and compliant with green building requirements. There are various limitations and risks associated with using BIM in construction projects, such as issues with file sharing and data security. This research examines numerous BIM benefits and drawbacks from a variety of angles, providing information and various measures for building the program. BIM adoption in construction projects includes a wide range of benefits as well as drawbacks. The relationship between the variety of information and outcomes was explored using different findings from numerous scientific studies that looked at the use of BIM in the construction sector. Due to the wide range of data that is available in the BIM sector, numerous areas were also found in this study. A thorough analysis was undertaken to present a variety of author viewpoints from various articles. This report's strengths and weaknesses have been noted. It has been demonstrated that BIM has additional benefits, including meeting client expectations, reducing design errors, and achieving project sustainability. However, there are also drawbacks to BIM, including user skill gaps, ambiguous standards and protocols, and transfer data problems. A few studies have addressed some of the research gaps and limitations in some of the domains. Additionally, these regions were thoroughly addressed from many authors' points of view.

How to cite this paper
APA: Saeed, M & Yas, H. (2023). Building information modelling (BIM) and knowledge management in implementation for con-struction projects. Management Science Letters, 13(4), 277-286.
Chicago/Turabian: Saeed, M & Yas, H. 2023. "Building information modelling (BIM) and knowledge management in implementation for con-struction projects." Management Science Letters 13, no. 4 (2023): 277-286.
AMA: Saeed, M & Yas, H. Building information modelling (BIM) and knowledge management in implementation for con-struction projects. Management Science Letters. 2023;13(4):277-286.

References
Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2017). BIM in off-site manufacturing for buildings. Journal of building engineering, 14, 89-102.
Alaghbari, W. E., Kadir, M. R. A., & Salim, A. (2007). The significant factors causing delay of building construction pro-jects in Malaysia. Engineering, construction and architectural management, 14(2), 192-206.
Alvarez-Anton, L., Koob, M., Diaz, J., & Minnert, J. (2016). Optimization of a hybrid tower for onshore wind turbines by Building Information Modeling and prefabrication techniques. Visualization in engineering, 4(1), 1-9.
Antón, L. Á., & Díaz, J. (2014). Integration of life cycle assessment in a BIM environment. Procedia Engineering, 85, 26-32.
Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and management in engineering, 11(3), 241-252.
Azhar, S., Khalfan, M., & Maqsood, T. (2012). Building information modeling (BIM): now and beyond. Australasian Journal of Construction Economics and Building, The, 12(4), 15-28.
Azhar, S., Nadeem, A., Mok, J. Y., & Leung, B. H. (2008, August). Building Information Modeling (BIM): A new para-digm for visual interactive modeling and simulation for construction projects. In Proc., First International Conference on Construction in Developing Countries (Vol. 1, pp. 435-46).
Babič, N. Č., Podbreznik, P., & Rebolj, D. (2010). Integrating resource production and construction using BIM. Automa-tion in construction, 19(5), 539-543.
Bradley, A., Li, H., Lark, R., & Dunn, S. (2016). BIM for infrastructure: An overall review and constructor perspective. Automation in construction, 71, 139-152.
Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). Interna-tional journal of project management, 31(7), 971-980.
Deese, G. C., Ahmed, S., & Russell, L. A. (2017, June). Barriers of Implementing an Integrated Project Delivery Method Versus the Traditional Delivery Method. In Joint CIB W099 & TG59 International Safety, Health, and People in Con-struction Conference (p. 538).
Farmer, M. (2016). The Farmer Review of the UK Construction Labour Model. Modernise or Die. Time to Decide the In-dustry's Future. London: Construction Leadership Council (CLC).
Ghaffarianhoseini, A., Tookey, J., Ghaffarianhoseini, A., Naismith, N., Azhar, S., Efimova, O., & Raahemifar, K. (2017). Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges. Renewable and sustainable energy reviews, 75, 1046-1053.
Gholami, E., Kiviniemi, A., & Sharples, S. (2015). Implementing Building Information Modelling (BIM) in energy-efficient domestic retrofit: quality checking of BIM model. In Proceedings of the 32nd CIB W78 conference.
Goulding, J. S., Pour-rahimian, F., Arif, M., & Sharp, M. D. (2012). Offsite construction: strategic priorities for shaping the future research agenda. Journal of Architectoni. ca, 1(1), 62-73.
Gulghane, A. A., & Khandve, P. V. (2015). Management for construction materials and control of construction waste in construction industry: a review. International Journal of Engineering Research and Applications, 5(4), 59-64.
Habibi, S. (2017). The promise of BIM for improving building performance. Energy and Buildings, 153, 525-548.
Hardin, B. (2009). BIM and Construction Management: proven Tools, Methods, and Workflows‖ Wiley Publishing Inc. In-dianapolis, Indiana.
Hietanen, J., & Lehtinen, S. (2006). The useful minimum (p. 4). Working paper. Tampere University of Technology. Vir-tual Building Laboratory.
Hiyama, K., Kato, S., Kubota, M., & Zhang, J. (2014). A new method for reusing building information models of past pro-jects to optimize the default configuration for performance simulations. Energy and Buildings, 73, 83-91.
Kota, S., Haberl, J. S., Clayton, M. J., & Yan, W. (2014). Building Information Modeling (BIM)-based daylighting simula-tion and analysis. Energy and buildings, 81, 391-403.
Krygiel, E., & Nies, B. (2008). Green BIM: successful sustainable design with building information modeling. John Wiley & Sons.
Ku, K., & Taiebat, M. (2011). BIM experiences and expectations: the constructors' perspective. International Journal of Construction Education and Research, 7(3), 175-197.
Moore, D. R., & Dainty, A. R. (2001). Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change. Construction management & economics, 19(6), 559-562.
Porwal, A., & Hewage, K. N. (2013). Building Information Modeling (BIM) partnering framework for public construction projects. Automation in construction, 31, 204-214.
Salameh, M., Taamneh, A., Kitana, A., Aburayya, A., Shwedeh, F., Salloum, S., ... & Varshney, D. (2022). The Impact of Project Management Office's Role on Knowledge Management: A Systematic Review Study. Computer Integrated Manufacturing Systems, 28(12), 846-863.
Sanguinetti, P., Abdelmohsen, S., Lee, J., Lee, J., Sheward, H., & Eastman, C. (2012). General system architecture for BIM: An integrated approach for design and analysis. Advanced Engineering Informatics, 26(2), 317-333.
Scarponcini, P. (1996). Time for an integrated approach to facility management. Journal of computing in civil engineer-ing, 10(1), 3-3.
Smith, D. K., & Tardif, M. (2009). Building information modeling: a strategic implementation guide for architects, engi-neers, constructors, and real estate asset managers. John Wiley & Sons.
Thompson, D. B. (2001). e-Construction: Don’t get soaked by the next wave. Construction Law Briefing Paper.
Thompson, D. B., & Miner, R. G. (2007). Building information modeling-BIM: Contractual risks are changing with tech-nology.
Wang, C., Cho, Y. K., & Kim, C. (2015). Automatic BIM component extraction from point clouds of existing buildings for sustainability applications. Automation in Construction, 56, 1-13.
Weygant, R. S. (2011). BIM content development: standards, strategies, and best practices. John Wiley & Sons.
Won, J., & Cheng, J. C. (2017). Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization. Automation in Construction, 79, 3-18.
Zou, Y., Kiviniemi, A., & Jones, S. W. (2017). A review of risk management through BIM and BIM-related technologies. Safety science, 97, 88-98.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Management Science Letters | 📅 Year: 2023 | 📖 Volume: 13 | 📄 Issue: 4 | 👁️ Views: 4528 | 📊 Crossref:

Related Articles:
  • Increasing safety in residential construction through a simplified earthquake- and typhoon-resistant guidelines
  • Analysis of delay factors and their effects on construction projects
  • Investigating the effects of building information modeling capabilities on knowledge management areas in the construction industry
  • A mathematical model for optimal tower crane layout planning
  • Investigating different challenges in construction projects

📝 Ready to share your research?

Management Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com