How to cite this paper
Fazli, S & Mansourdehghan, M. (2013). Risks identification and ranking using AHP and group decision making technique: Presenting “R index”.Management Science Letters , 3(2), 613-624.
Refrences
Albayrak, E., & Erensal, Y.C. (2004). Using analytic hierarchy process (AHP) to improve human
performance. An application of multiple criteria decision making problem. Journal of Intelligent
Manufacturing, 15, 491–503.
Ashley, D.B., & Bonner, J.J. (1987). Political risks in international construction. ASCE Journal of
Construction and Engineering Management ,113(9), 447–467.
Badri, M.A. (2001). A combined AHP–GP model for quality control systems. International Journal
of Production Economics, 72, 27–40.
Burke, R. (2003). Project management Planning & Control Techniques. John Wiley & Sons; 4th ed.
Chapman, C. (2006). Key points of contention in framing assumptions for risk and uncertainty
management. International Journal of Project Management, 24(4), 303–313.
Daniel, W.M., Albert, P.C., Patrick, T.I., Lam, John F.Y. & Yeungb, J.H.L. (2011). Risk ranking and
analysis in target cost contracts: Empirical evidence from the construction industry. International
Journal of Project Management, 29(6), 751 –763.
Dias, A., Ioannou, P. (1995). A desirability model for the development of privately-promoted
infrastructure projects. Civil & Environmental Engineering Department, University of Michigan,
Ann Arbor, Michigan 48109-2125, U.S.A.
Khazaeni, G., Khanzadi, M., & Afshar, A. (2012). Fuzzy adaptive decision making model for
selection balanced risk allocation. International Journal of Project Management, 30(4), 511–522.
Jebel Ameli, M.S., Rezaeifar, A., & ChaeiBakhsh, A. (2005). Risk ranking with the multi-criteria
decision-making. Second International Conference on Project Management, Tehran, Iran.
Kapila, P., & Hendrickson, C. (2001). Exchange rate risk management in international construction
ventures. ASCE Journal of Construction Engineering Management, 17(4), 186–91.
Lam, K., Wang, D., Patricia, Y., & Tsang, T. (2007). Modeling risk allocation decision in
construction contracts. International Journal of Project Management, 25, 485-493.
Long., J., & Fischhoff, B. (2000). Setting Risk Priorities: A Formal Model. Risk Analysis, 20(3), 339-
352.
Makoei, A., Mahdavi, I., & Farokhian, F. (2007). Appropriate allocation of risk to the contractor and
the employer. Fourth International Conference on Project Management, Tehran, Iran.
Makoei, A, & Mojtahedi, MH. (2007). New techniques are introduced and applied to identify project
risks. First International Conference on Risk Management, Tehran, Iran.
Maniasi, S., Britos, P., & Garc?a Mart?nez, R. (2006). A Taxonomy-Based Model for Identifying
Risks. Buenos Aires Institute of Technology.
Motawa, I.A., Anumba, C.J., & El-Hamalawi, A. (2006). A fuzzy system for evaluating the risk of
change in construction projects. Advances in Engineering Software, 37(9), 583–591.
Newtown, S. (2008). A Guide to the Project Management Body of Knowledge (PMBOK). American
National Standard ANSI/PMI 99-001.
Project Risk Management Handbook. (2003). Office of Project Management Process Improvement ,
First Edition, Revision 0, June 26.
Ralph, L. Kliem, I., & Ludin, S. (2010). Project Management Practitioner & apos; s Handbook. AMACOM
Publisher.
Webb, A. (2003). The Project Manager’s Guide to Handling Risk. Gower Publishing, Ltd.
Zeng, J., An, M., & Smith, N.J. (2007). Application of a fuzzy based decision making methodology
to construction project risk assessment. International Journal of Project Management, 25, 589–
600.
performance. An application of multiple criteria decision making problem. Journal of Intelligent
Manufacturing, 15, 491–503.
Ashley, D.B., & Bonner, J.J. (1987). Political risks in international construction. ASCE Journal of
Construction and Engineering Management ,113(9), 447–467.
Badri, M.A. (2001). A combined AHP–GP model for quality control systems. International Journal
of Production Economics, 72, 27–40.
Burke, R. (2003). Project management Planning & Control Techniques. John Wiley & Sons; 4th ed.
Chapman, C. (2006). Key points of contention in framing assumptions for risk and uncertainty
management. International Journal of Project Management, 24(4), 303–313.
Daniel, W.M., Albert, P.C., Patrick, T.I., Lam, John F.Y. & Yeungb, J.H.L. (2011). Risk ranking and
analysis in target cost contracts: Empirical evidence from the construction industry. International
Journal of Project Management, 29(6), 751 –763.
Dias, A., Ioannou, P. (1995). A desirability model for the development of privately-promoted
infrastructure projects. Civil & Environmental Engineering Department, University of Michigan,
Ann Arbor, Michigan 48109-2125, U.S.A.
Khazaeni, G., Khanzadi, M., & Afshar, A. (2012). Fuzzy adaptive decision making model for
selection balanced risk allocation. International Journal of Project Management, 30(4), 511–522.
Jebel Ameli, M.S., Rezaeifar, A., & ChaeiBakhsh, A. (2005). Risk ranking with the multi-criteria
decision-making. Second International Conference on Project Management, Tehran, Iran.
Kapila, P., & Hendrickson, C. (2001). Exchange rate risk management in international construction
ventures. ASCE Journal of Construction Engineering Management, 17(4), 186–91.
Lam, K., Wang, D., Patricia, Y., & Tsang, T. (2007). Modeling risk allocation decision in
construction contracts. International Journal of Project Management, 25, 485-493.
Long., J., & Fischhoff, B. (2000). Setting Risk Priorities: A Formal Model. Risk Analysis, 20(3), 339-
352.
Makoei, A., Mahdavi, I., & Farokhian, F. (2007). Appropriate allocation of risk to the contractor and
the employer. Fourth International Conference on Project Management, Tehran, Iran.
Makoei, A, & Mojtahedi, MH. (2007). New techniques are introduced and applied to identify project
risks. First International Conference on Risk Management, Tehran, Iran.
Maniasi, S., Britos, P., & Garc?a Mart?nez, R. (2006). A Taxonomy-Based Model for Identifying
Risks. Buenos Aires Institute of Technology.
Motawa, I.A., Anumba, C.J., & El-Hamalawi, A. (2006). A fuzzy system for evaluating the risk of
change in construction projects. Advances in Engineering Software, 37(9), 583–591.
Newtown, S. (2008). A Guide to the Project Management Body of Knowledge (PMBOK). American
National Standard ANSI/PMI 99-001.
Project Risk Management Handbook. (2003). Office of Project Management Process Improvement ,
First Edition, Revision 0, June 26.
Ralph, L. Kliem, I., & Ludin, S. (2010). Project Management Practitioner & apos; s Handbook. AMACOM
Publisher.
Webb, A. (2003). The Project Manager’s Guide to Handling Risk. Gower Publishing, Ltd.
Zeng, J., An, M., & Smith, N.J. (2007). Application of a fuzzy based decision making methodology
to construction project risk assessment. International Journal of Project Management, 25, 589–
600.