Growing Science » Management Science Letters » Factors leading to failures of infrastructure development projects in Pakistan: A systematic literature review

Journals

  • IJIEC (777)
  • MSL (2643)
  • DSL (690)
  • CCL (528)
  • USCM (1092)
  • ESM (421)
  • AC (562)
  • JPM (293)
  • IJDS (952)
  • JFS (101)
  • HE (32)
  • SCI (26)

MSL Volumes

    • Volume 1 (70)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (25)
    • Volume 2 (365)
      • Issue 1 (51)
      • Issue 2 (32)
      • Issue 3 (40)
      • Issue 4 (44)
      • Issue 5 (42)
      • Issue 6 (52)
      • Issue 7 (53)
      • Issue 8 (51)
    • Volume 3 (426)
      • Issue 1 (40)
      • Issue 2 (47)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (27)
      • Issue 6 (50)
      • Issue 7 (51)
      • Issue 8 (30)
      • Issue 9 (24)
      • Issue 10 (25)
      • Issue 11 (25)
      • Issue 12 (27)
    • Volume 4 (387)
      • Issue 1 (34)
      • Issue 2 (30)
      • Issue 3 (34)
      • Issue 4 (42)
      • Issue 5 (33)
      • Issue 6 (43)
      • Issue 7 (42)
      • Issue 8 (40)
      • Issue 9 (39)
      • Issue 10 (20)
      • Issue 11 (18)
      • Issue 12 (12)
    • Volume 5 (129)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (10)
      • Issue 4 (12)
      • Issue 5 (14)
      • Issue 6 (14)
      • Issue 7 (8)
      • Issue 8 (8)
      • Issue 9 (11)
      • Issue 10 (8)
      • Issue 11 (9)
      • Issue 12 (10)
    • Volume 6 (74)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (6)
      • Issue 4 (7)
      • Issue 5 (6)
      • Issue 6 (6)
      • Issue 7 (8)
      • Issue 8 (6)
      • Issue 9 (5)
      • Issue 10 (5)
      • Issue 11 (5)
      • Issue 12 (5)
    • Volume 7 (54)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (5)
      • Issue 6 (5)
      • Issue 7 (4)
      • Issue 8 (4)
      • Issue 9 (4)
      • Issue 10 (4)
      • Issue 11 (4)
      • Issue 12 (4)
    • Volume 8 (119)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
      • Issue 5 (22)
      • Issue 6 (20)
      • Issue 7 (6)
      • Issue 8 (6)
      • Issue 9 (8)
      • Issue 10 (10)
      • Issue 11 (11)
      • Issue 12 (16)
    • Volume 9 (208)
      • Issue 1 (16)
      • Issue 2 (14)
      • Issue 3 (11)
      • Issue 4 (12)
      • Issue 5 (12)
      • Issue 6 (16)
      • Issue 7 (16)
      • Issue 8 (16)
      • Issue 9 (16)
      • Issue 10 (16)
      • Issue 11 (19)
      • Issue 12 (20)
      • Issue 13 (24)
    • Volume 10 (448)
      • Issue 1 (24)
      • Issue 2 (25)
      • Issue 3 (24)
      • Issue 4 (25)
      • Issue 5 (26)
      • Issue 6 (26)
      • Issue 7 (25)
      • Issue 8 (27)
      • Issue 9 (27)
      • Issue 10 (30)
      • Issue 11 (33)
      • Issue 12 (30)
      • Issue 13 (30)
      • Issue 14 (30)
      • Issue 15 (30)
      • Issue 16 (36)
    • Volume 11 (251)
      • Issue 1 (36)
      • Issue 2 (39)
      • Issue 3 (40)
      • Issue 4 (40)
      • Issue 5 (29)
      • Issue 6 (27)
      • Issue 7 (20)
      • Issue 8 (12)
      • Issue 9 (8)
    • Volume 12 (33)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (13)
    • Volume 13 (27)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (5)
      • Issue 4 (7)
    • Volume 14 (22)
      • Issue 1 (6)
      • Issue 2 (6)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 15 (24)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (9)
    • Volume 16 (6)
      • Issue 1 (6)

Keywords

Supply chain management(168)
Jordan(165)
Vietnam(151)
Customer satisfaction(120)
Performance(115)
Supply chain(112)
Service quality(98)
Competitive advantage(97)
Tehran Stock Exchange(94)
SMEs(89)
optimization(87)
Sustainability(86)
Artificial intelligence(85)
Financial performance(84)
Trust(83)
TOPSIS(83)
Job satisfaction(81)
Genetic Algorithm(78)
Factor analysis(78)
Social media(78)


» Show all keywords

Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(66)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(37)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Haitham M. Alzoubi(28)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

Countries

Iran(2192)
Indonesia(1311)
Jordan(813)
India(793)
Vietnam(510)
Saudi Arabia(478)
Malaysia(444)
China(231)
United Arab Emirates(226)
Thailand(160)
United States(114)
Ukraine(110)
Turkey(110)
Egypt(106)
Peru(94)
Canada(93)
Morocco(86)
Pakistan(85)
United Kingdom(80)
Nigeria(78)


» Show all countries

Management Science Letters

ISSN 1923-9343 (Online) - ISSN 1923-9335 (Print)
Quarterly Publication
Volume 13 Issue 1 pp. 11-22 , 2023

Factors leading to failures of infrastructure development projects in Pakistan: A systematic literature review Pages 11-22 Right click to download the paper Download PDF

Authors: Sabahat Nisar, Rabia Asif

DOI: 10.5267/j.msl.2022.11.001

Keywords: Public projects, Completion, Cost burden, Time delays, Literature review

Abstract: Public sector development projects are found to have poor repute in terms of completion within assigned cost and time. Almost every 2nd project is impacted by financial burdens and time delays. The aim of this literature review is to highlight the potential factors that impact the completion time and estimated cost with respect to public sector infrastructure development projects in Pakistan. 39 sub-factors have been identified from 32 existing research which are then classified into 8 main factors. The main factors include administrative issues, improper financial plans, market risks, input cost estimates, poor corporate governance, legal issues, technical matters errors, and environmental issues. The results of this systematic literature review will provide policymakers with oversight on how to formulate effective strategies regarding cost cutting and timely execution of the infrastructure development projects in Pakistan.

How to cite this paper
Nisar, S & Asif, R. (2023). Factors leading to failures of infrastructure development projects in Pakistan: A systematic literature review.Management Science Letters , 13(1), 11-22.

Refrences
Adam, A., Josephson, P. E. B., &Lindahl, G. (2017). Aggregation of Factors Causing Cost Overruns and Time Delays in Large Public Construction Projects: Trends and Implications. Engineering, Construction and Architectural Manage-ment, 24(3), 393-406.
Afzal, F., Yunfei, S., Sajid, M., & Afzal, F. (2019). Integrated Priority Decision Index for Risk Assessment in Chaos: Cost Overruns in Transport Projects. Engineering, Construction and Architectural Management, 27(4), 825–849
Ahmed, S., Memon, A. H., Memon, N. A., Laghari, A. N., Akhund, M. A., & Imad, H. U. (2018). Common Factors of Cost Escalation in Construction Industry of Pakistan. Engineering, Technology & Applied Science Research, 8(6), 3508-3511.
Akhund, M. A., Imad, H. U., Memon, N. A., Siddiqui, F., Khoso, A. R., & Panhwar, A. A. (2018). Contributing Factors of Time Overrun in Public Sector Construction Projects. Engineering, Technology & Applied Science Research, 8(5), 3369-3372.
Akhund, M. A., Khoso, A. R., Khan, J. S., Imad, H. U., & Memon, K. M. (2019). Prompting Cost Overrun Factors during PCP in Construction Projects. Indian Journal of Science and Technology, 12(4), 1-7.
Akhund, M. A., Khoso, A. R., Pathan, A. A., Imad, H. U., & Siddiqui, F. (2018). Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan. Engineering, Technology & Applied Science Re-search, 8(4), 3260-3264.
Akram, M., Ali, T., Memon, N. A., & Khahro, S. H. (2017). Causal Attributes of Cost Overrun in Construction Projects of Pakistan. International Journal of Civil Engineering and Technology, 8(6), 477-483.
Aljohani, A., Ahiaga-Dagbui, D., & Moore, D. (2017). Construction Projects Cost Overrun: What Does The Literature Tell Us? International Journal of Innovation, Management and Technology, 8(2), 137.
Allahaim, F. S., & Liu, L. (2015). Causes of Cost Overruns on Infrastructure Projects in Saudi Arabia. International Jour-nal of Collaborative Enterprise, 5(1-2), 32-57.
Andric, J. M., Mahamadu, A. M., Wang, J., Zou, P. X., &Zhong, R. (2019). The Cost Performance and Causes of Overruns in Infrastructure Development Projects in Asia. Journal of Civil Engineering and Management, 25(3), 203-214.
Asiedu, R. O., &Adaku, E. (2019). Cost Overruns of Public Sector Construction Projects: A Developing Country Perspec-tive. International Journal of Managing Projects in Business, 13(1), 66-84.
Azam, T., Jiang, W. S., Malik, S. A., Malik, S. Y., Nilofar, M., Abbas, Z., & Ullah, I. (2020). An Analysis of Causes of De-lay and Cost Overrun in Construction of Hydropower Project. Journal of Public Affairs, e2285.
Batool, A., & Abbas, F. (2017). Reasons for Delay in Selected Hydro-Power Projects in Khyber Pakhtunkhwa (KPK), Pa-kistan. Renewable and Sustainable Energy Reviews, 73, 196-204.
Brady, T., Davies, A. (2014). Managing Structural and Dynamic Complexity: A Tale of Two Projects. Project Manage-ment Journal, 45(4), 21–38.
Cantarelli, C. C., Flyvbjerg, B., & Buhl, S. L. (2012). Geographical Variation in Project Cost Performance: The Nether-lands Versus Worldwide. Journal of Transport Geography, 24, 324-331.
Choudhry, R. M., Aslam, M. A., & Arain, F. M. (2014). Cost and Schedule Risk Analysis of Bridge Construction in Paki-stan: Establishing Risk Guidelines. Journal of Construction Engineering and Management, 140(7).
Enrica, M., Purba, H. H., & Purba, A. (2021). Risks Leading to Cost Overrun in Construction Projects: A Systematic Lit-erature Review. Advance Researches in Civil Engineering, 3(1), 43-60.
Farid, W., Kureshi, N. I., Babar, S., & Mahmood, S. (2020). Critical Risk Factors of Construction Industry of Pakistan for Improving Project Outcome. Mehran University Research Journal of Engineering & Technology, 39(1), 71-80.
Flyvbjerg, B., & Bester, D. W. (2021). The Cost-Benefit Fallacy: Why Cost-Benefit Analysis Is Broken and How to Fix It. Journal of Benefit-Cost Analysis, 1-25.
Flyvbjerg, B., Holm, M. K. S., Buhl, S. L. (2003). How Common and How Large are Cost Overruns in Transport Infra-structure Projects? Transport Reviews, 23(1), 71–88
Hanif, H., Khurshid, M. B., Lindhard, S. M., & Aslam, Z. (2016). Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan. Journal of Construction in Developing Countries, 21(2), 37.
Herrera, R. F., Sánchez, O., Castañeda, K., & Porras, H. (2020). Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis. Applied Sciences, 10(16), 5506.
Hussain, S., Zhu, F., Ali, Z., & Xu, X. (2017). Rural Residents’ Perception of Construction Project Delays in Pakistan. Sustainability, 9(11), 2108.
Hussain, S., Zhu, F., Ali, Z., Aslam, H. D., & Hussain, A. (2018). Critical Delaying Factors: Public Sector Building Pro-jects in Gilgit-Baltistan, Pakistan. Buildings, 8(1), 6.
Idrees, S., & Shafiq, M. T. (2021). Factors for Time and Cost Overrun in Public Projects. Journal of Engineering, Project & Production Management, 11(3).
Iqbal, A., Rehman, H. S. U., Munir, M., Ashiq, M., Omar, A., Haider, Z., & Jahanzaib, M. (2019). Time and Cost Overrun in Construction Projects of Pakistan. Pakistan Journal of Engineering and Technology, 2(2), 22-29.
Isa, C. M. M., Saman, H. M., & Preece, C. N. (2015). Determining Significant Factors Influencing Malaysian Construction Business Performance in International Markets. Journal of Construction in Developing Countries, 20(2), 1.
Joiya, A. A., Hassan, R. S., Joiya, A. Z., & Hassnain, A. Inter-Relationship between Cost Overrun and Quality of Provin-cial Public Sector Development Projects (PSDP) Analyzing Dynamics Involved in Provincial Projects of Punjab, Paki-stan. Journal of Culture, Society and Development,
Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2019). Risk Factors Influencing the Building Projects in Pakistan: From Perspective of Contractors, Clients and Consultants. International Journal of Construction Management, 1-17.
Khan, A., Hussain, A., Waris, M., Ismail, I., & Ilyas, M. (2018). Infrastructure Project Governance: An Analysis of Public Sector Project in Northern Pakistan. Journal of Governance and Integrity, 1(2), 120-134.
Khan, A., Waris, M., Ullah, M., & Bokhari, I. H. (2021). Review of Public Sector Project Planning in Pakistan. Pakistan Journal of Social Sciences, 41(3), 503-514.
Khan, R. A., & Umer, M. (2020). Impact of Delays on Cost of Construction Project-A Cross Sectional Study of Pakistani Construction Industry. Mehran University Research Journal of Engineering & Technology, 39(4), 815-825.
Lenfle, S., & Loch, C. (2010). Lost Roots: How Project Management Came to Emphasize Control Over Flexibility and Novelty. California Management Review, 53(1), 32–55
Mahmud, A. T., Ogunlana, S. O., & Hong, W. T. (2021). Key Driving Factors of Cost Overrun in Highway Infrastructure Projects in Nigeria: a Context-Based Perspective. Journal of Engineering, Design and Technology, 19(6), 1530-1555.
Mansur, S. A., Zin, R. M., & Linbo, L. (2019). Components of Cost Overrun in China Construction Projects. IOP Confer-ence Series: Materials Science and Engineering, 620(1).
Maqsoom, A., Khan, M. U., Khan, M. T., Khan, S., & Ullah, F. (2018). Factors Influencing the Construction Time and Cost Overrun in Projects: Empirical Evidence from Pakistani Construction Industry. In Proceedings of the 21st Interna-tional Symposium on Advancement of Construction Management and Real Estate (pp. 769-778). Springer, Singapore.
Matin, D. M. (2016). Identifying the Effective Factors for Cost Overrun and Time Delay in Water Construction Projects. Engineering, Technology & Applied Science Research, 6(4), 1062-1066.
Memon, A. Q., Memon, A. H., & Soomro, M. A. (2020). Contractor’s Perception on Factors Causing Cost Overrun in Construction Works of Pakistan. International Journal of Sustainable Construction Engineering and Technology, 11(3), 84-92.
Memon, A. Q., Memon, A. H., Soomro, M. A., & Rahman, I. A. (2019). Common Factors Affecting Time and Cost Per-formance of Construction Projects in Pakistan. Pakistan Journal of Social Science, 71(4), 64.
Merrow, E. W. (2011). Industrial Megaprojects: Concepts, Strategies, and Practices for Success. John Wiley & Sons.
Miller, R., Lessard, D. R. (2000). The Strategic Management of Large Engineering Projects: Shaping Institutions, Risks, and Governance. The MIT Press.
Narayanan, S., Kure, A. M., &Palaniappan, S. (2019). Study on Time and Cost Overruns in Mega Infrastructure Projects in India. Journal of the Institution of Engineers (India): Series A, 100(1), 139-145.
Nawaz, A., Su, X., Din, Q. M. U., Khalid, M. I., Bilal, M., & Shah, S. A. R. (2020). Identification of the H&S (health and safety factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project. International Journal of Environmental Research and Public Health, 17(2), 635.
Nazeer, T., & Shah, S. N. U. (2020). An Observational Examination on Components Affecting Cost Overwhelm on Con-struction Projects–A Case from Karachi, Pakistan.
Odeck, J. (2004). Cost Overruns in Road Construction—What are their Sizes and Determinants? Transport Policy, 11(1), 43-53.
Pham, H., Luu, T. V., Kim, S. Y., & Vien, D. T. (2020). Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects. KSCE Journal of Civil Engineering, 24(4), 1029-1036.
Pinheiro Catalão, F., Cruz, C. O., & Miranda Sarmento, J. (2019). Exogenous Determinants of Cost Deviations and Over-runs in Local Infrastructure Projects. Construction Management and Economics, 37(12), 697-711.
Rashid, Y. (2020). Analysis of Delay Factors and their Effects on Construction Projects. Management Science Letters, 10(6), 1197-1204.
Rum, N. A. M., & Akasah, Z. A. (2012). Implementing Life Cycle Costing in Malaysian Construction Industry: A Review. Journal of Civil Engineering and Architecture, 6(9), 1202.
Scott, W. R., Levitt, R. E., & Orr, R. J. (2011). Global Projects: Institutional and Political Challenges. Cambridge Univer-sity Press.
Shaikh, F. A. (2020). Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Pro-jects in Pakistan. Engineering, Technology & Applied Science Research, 10(1), 5247-5250.
Shenhar, A. J., & Dvir, D. (2007). Reinventing Project Management: The Diamond Approach to Successful Growth and Innovation. Harvard Business School Press.
Singh, R. (2009). Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents. Causes and Remedies. Centre for Development Economics. Retrieved from http://www. cdedse. org/pdf/work181. pdf.
Smith, D. (2019). The Price of Everything and the Value of Nothing: Rethinking How We Cost Mega Projects. Construc-tion Research and Innovation, 10(3), 60-63.
Sohu, S., Abdullah, A. H., Nagapan, S., Rind, T. A., & Jhatial, A. A. (2019). Controlling Measures for Cost Overrun Caus-es in Highway Projects of Sindh Province. Engineering, Technology & Applied Science Research, 9(3), 4276-4280.
Sohu, S., Ansari, A. A., & Jhatial, A. A. (2020). Most Common Factors Causing Cost Overrun with its Mitigation Measure for Pakistan Construction Industry. International Journal of Sustainable Construction Engineering and Technology, 11(2), 256-261.
Sohu, S., Jhatial, A. A., Jamali, Q. B., Buller, A. H., & Bhatti, I. A. (2021). Critical Cost Overrun Factors and its Control-ling Measures in Construction Sector of Pakistan. Quaid-E-Awam University Research Journal of Engineering, Sci-ence & Technology, Nawabshah., 19(1), 70-76.
Sohu, S., Nagapan, S., Memon, N. A., Yunus, R., & Hasmori, M. F. (2018). Causative Factors Cost Overrun in Building Projects of Pakistan. International Journal of Integrated Engineering, 10(9).
Stinchcombe, A. L., & Heimer, C. (1985). Organizational Theory and Project Management: Administering Uncertainty in Norwegian Offshore Oil. Norwegian University Press.
Sun, C., Man, Q., & Wang, Y. (2015). Study on BIM-based Construction Project Cost and Schedule Risk Early Warning. Journal of Intelligent & Fuzzy Systems, 29(2), 469-477.
Waris, M., Khan, A., Ismail, I., & Panda, S. (2017). Project Governance: A Need for Public Sector Infrastructure Projects in Pakistan. In The Conference Organizing Committee (p. 141).
Yuanyue, Y., & Huimin, L. (2018). Evaluation on Cost Overrun Risks of Long-distance Water Diversion Project Based on SPA-IAHP Method. IOP Conference Series: Earth and Environmental Science, 113(1).
Zafar, I., Wuni, I. Y., Shen, G. Q., Ahmed, S., & Yousaf, T. (2019). A Fuzzy Synthetic Evaluation Analysis of Time Over-run Risk Factors in Highway Projects of Terrorism-Affected Countries: The Case of Pakistan. International Journal of Construction Management, 1-19.
Zaffar, M., Khan, S., & Ahmad, W. (2019). Causes of Time and Cost Overrun: A Case Study of Health Sector Projects in Peshawar, KP. International Journal of Experiential Learning & Case Studies, 4(2).
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Management Science Letters | Year: 2023 | Volume: 13 | Issue: 1 | Views: 2652 | Reviews: 0

Related Articles:
  • Investigation and ranking the causes of delay in EPC projects of nonindustr ...
  • Risk and its impacts on time and cost in construction projects
  • Towards a sustainable construction industry: Delays and cost overrun causes ...
  • Analysis of delay factors and their effects on construction projects
  • Impact of supply chain risks on the completion for time of rural road proje ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com