How to cite this paper
Maity, S & Chakraborty, S. (2012). Supercritical boiler material selection using fuzzy analytic network process.Management Science Letters , 2(4), 1083-1096.
Refrences
Blum, R., & Vanstone, R.W. (2003). Materials development for boilers and steam turbines operating at 700°C. Proc. of 6th International Charles Parsons Turbine Conference. Institute of Materials, Minerals, and Mining, London, 489-510.
Chung, S.H., Lee, A.H.L., & Pearn, W.L. (2006). Analytic network process (ANP) approach for product mix planning in semiconductor fabricator. International Journal of Production Economics, 96, 15-36.
Davis, J.R. (1997). Heat-resistant Materials. Ohio: ASM International.
Donachie, M.J. & Donachie, S.J. (2002). Superalloys: A Technical Guide. Ohio: ASM International.
Kelly, J.C., & Wilson, J.D. (1995). Oxidation Rates of Some Heat Resistant Alloys. ASM Proc. of 2nd International Conference on Heat-Resistant Materials, USA.
Meade, L.M., & Sarkis, J. (1999). Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach. International Journal of Production Research, 37, 241-261.$$
Momoh, J.A., & Zhu, J. (2003). Optimal generation - Scheduling based on AHP/ANP. IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics, 33, 531-535.
Perrine, I.J., & Fishburn, J.D. (2008). A perspective on the design of high-temperature boiler components. International Journal of Pressure Vessels and Piping, 85, 14-21.
Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw-Hill.
Saaty, T.L. (1996). Decision Making with Dependence and Feedback: The Analytic Network Process. Pittsburgh: RWS Publications.
Sarkis, J. (2002). Quantitative models for performance measurement systems - Alternate considerations. International Journal of Production Economics, 86, 81-90.
Sims, C., Stoloff, N., & Hagel, W. (1987). Superalloys II: High Temperature Materials for Aerospace and Industrial Power. New York: John Wiley & Sons.
Shingledecker, J.P., Swindeman, R.W., Wu, Q., & Vasudevan, V.K. (2005). Creep strength of high temperature alloys for ultra-supercritical steam boilers. Proc. to 4th International Conference on Advances in Materials Technology for Fossil Power Plants, Ohio, 1198-1212.
Siler, W. and Buckley, J.J. (2005). Fuzzy Expert Systems and Fuzzy Reasoning. New Jersey: John Wiley & Sons.
Steingress, F.M. (2001). Low Pressure Boilers. New York: American Technical Publishers.
Steingress, F.M., Frost, H. J. & Walker, D.R. (2003). High Pressure Boilers. Georgia: American Technical Publishers.
Vahdani, B., Mousavi, S. M., & Tavakkoli-Moghaddam, R. (2011). Group decision making based on novel fuzzy modified TOPSIS method. Applied Mathematical Modelling, 37, 72-93.
Viswanathan, R. & Bakker, W. (2001). Materials for ultrasupercritical coal power plants - Boiler materials: Part 1. Journal of Materials Engineering and Performance, 10, 81-95.
Viswanathan, R., Coleman, K., & Rao, U. (2006). Materials for ultra-supercritical coal-fired power plant boilers. International Journal of Pressure Vessels and Piping, 83, 778-783.
Chung, S.H., Lee, A.H.L., & Pearn, W.L. (2006). Analytic network process (ANP) approach for product mix planning in semiconductor fabricator. International Journal of Production Economics, 96, 15-36.
Davis, J.R. (1997). Heat-resistant Materials. Ohio: ASM International.
Donachie, M.J. & Donachie, S.J. (2002). Superalloys: A Technical Guide. Ohio: ASM International.
Kelly, J.C., & Wilson, J.D. (1995). Oxidation Rates of Some Heat Resistant Alloys. ASM Proc. of 2nd International Conference on Heat-Resistant Materials, USA.
Meade, L.M., & Sarkis, J. (1999). Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach. International Journal of Production Research, 37, 241-261.$$
Momoh, J.A., & Zhu, J. (2003). Optimal generation - Scheduling based on AHP/ANP. IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics, 33, 531-535.
Perrine, I.J., & Fishburn, J.D. (2008). A perspective on the design of high-temperature boiler components. International Journal of Pressure Vessels and Piping, 85, 14-21.
Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw-Hill.
Saaty, T.L. (1996). Decision Making with Dependence and Feedback: The Analytic Network Process. Pittsburgh: RWS Publications.
Sarkis, J. (2002). Quantitative models for performance measurement systems - Alternate considerations. International Journal of Production Economics, 86, 81-90.
Sims, C., Stoloff, N., & Hagel, W. (1987). Superalloys II: High Temperature Materials for Aerospace and Industrial Power. New York: John Wiley & Sons.
Shingledecker, J.P., Swindeman, R.W., Wu, Q., & Vasudevan, V.K. (2005). Creep strength of high temperature alloys for ultra-supercritical steam boilers. Proc. to 4th International Conference on Advances in Materials Technology for Fossil Power Plants, Ohio, 1198-1212.
Siler, W. and Buckley, J.J. (2005). Fuzzy Expert Systems and Fuzzy Reasoning. New Jersey: John Wiley & Sons.
Steingress, F.M. (2001). Low Pressure Boilers. New York: American Technical Publishers.
Steingress, F.M., Frost, H. J. & Walker, D.R. (2003). High Pressure Boilers. Georgia: American Technical Publishers.
Vahdani, B., Mousavi, S. M., & Tavakkoli-Moghaddam, R. (2011). Group decision making based on novel fuzzy modified TOPSIS method. Applied Mathematical Modelling, 37, 72-93.
Viswanathan, R. & Bakker, W. (2001). Materials for ultrasupercritical coal power plants - Boiler materials: Part 1. Journal of Materials Engineering and Performance, 10, 81-95.
Viswanathan, R., Coleman, K., & Rao, U. (2006). Materials for ultra-supercritical coal-fired power plant boilers. International Journal of Pressure Vessels and Piping, 83, 778-783.