How to cite this paper
Hashemzadeh, G., Khoshtarkib, M & Hajizadeh, S. (2014). Identification and weighting factors influencing the establishment of a single minute exchange of dies in plastic injection industry using VIKOR and Shannon Entropy.Management Science Letters , 4(5), 977-984.
Refrences
Asgharpour, S.M.J. (2005). Multi-criteria decision. Tehran university publication.
Agustin, R.O., & Santiago F. (1996). Single minute exchange of die. In Proceedings of Advanced Semiconductor Manufacturing Conference Workshop, ASMC 96, Theme, Innovative Approaches to Growth in the Semiconductor Industry, 214-217.
Alves, A. S., & Tenera, A. (2009). Improving SMED in the Automotive Industry: A case study. In POMS 20th Annual Conference Orlando, Florid USA, May1 to May (Vol. 4).
Chu, M. T., Shyu, J., Tzeng, G. H., & Khosla, R. (2007). Comparison among three analytical methods for knowledge communities group-decision analysis. Expert systems with applications, 33(4), 1011-1024.
Carrizo Moreira, A., & Campos Silva Pais, G. (2011). Single minute exchange of die: a case study implementation. Journal of Technology Management & Innovation, 6(1), 129-146.
Dura, C., Isac, C., & Drig?, I. (2010). Possibilities of increasing efficiency within serial production management. Annals of the University of Petro?ani, Economics, 10(2), 125-136.
Goubergen, D. (2000). An integrated change framework for setup reduction, Proceedings of the 2009 Industrial Engineering Research Conference.
Fawaz, A. (2003). Lean manufacturing tools and techniques in the process industry with a focus on steel. Doctoral Dissertation, University of Pittsburgh.
Huang, J. J., Tzeng, G. H., & Liu, H. H. (2009). A Revised VIKOR Model for Multiple Criteria Decision Making-The Perspective of Regret Theory. In Cutting-Edge Research Topics on Multiple Criteria Decision Making (pp. 761-768). Springer Berlin Heidelberg.
Hwang, C.L. & Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications. Springer, Berlin Heidelberg.
King, P. L. (2009). SMED in the process industries-Improved flow through shorter product changeover. Industrial Engineer, 41(9), 30.
Leslie, M., Hagood, C., Royer, A., Reece Jr, C. P., & Maloney, S. (2006). Using lean methods to improve OR turnover times. AORN journal, 84(5), 849-855.
Mahmodi, J. (2002). How the SMED technique reduce setup time in the Plastiran Company, Master’s Thesis, Beheshti University.
Moxham, C. & Greatbanks, R. (2001). Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. International Journal of Quality & Reliability Management, (4), 404 - 414.
McIntosh, R. I., Culley, S. J., Mileham, A. R., & Owen, G. W. (2001). Improving changeover performance. Improving Changeover Performance.
Nyhuis, P., Schulze, C. P., & Klemke, T. (2010). Lean-Enablers–An Approach to Design Lean Factories. The Business Review, Cambridge, 1, 113-119.
Oprpcovic, S. (1998). Multi criteria Optimization of Civil Engineering Systems. Belgrade, 302
Opricovic, S., & Tzeng, G. H. (2002). Multicriteria planning of post?earthquake sustainable reconstruction. Computer?Aided Civil and Infrastructure Engineering, 17(3), 211-220.
Opricovic, S., & Tzeng, G. H. (2004). Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research, 156(2), 445-455.
Opricovic, S., & Tzeng, G. H. (2007). Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research, 178(2), 514-529.
Perini?, M., Ikoni?, M., & Mari?i?, S. (2009). Die Casting Process Assessment Using Single Minute Exchange of Dies (SMED) Method, Metalurgija, 48(3), 199-202.
Sarmad, Z., Bazargan, A., & Hejazi, E. (1998). Research methods in the behavioral sciences, Agah Publication [In Persian].
Saunders, M., Lewis, P. & Thornhill, A. (2009). Research Methods for Business Students. 5th. Ed. Financial Times Press
Sekine, K., & Arai, K. (1992). Kaizen for quick changeover, Cambridge productivity Press.
Sousa, R. M., Lima, R. M., Carvalho, J. D., & Alves, A. C. (2009, December). An industrial application of resource constrained scheduling for quick changeover. In Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on (pp. 189-193). IEEE.
Tharisheneprem, S. (2008, November). Achieving full fungibility and Quick Changeover by turning knobs in tape and Reel machine by applying SMED theory. In Electronic Manufacturing Technology Symposium (IEMT), 2008 33rd IEEE/CPMT International (pp. 1-5). IEEE.
Ulutas, B. (2011). An application of SMED Methodology. World Academy of Science, Engineering and Technology, 79, 101.
Van Goubergen, D. & Van Landeghem, H. (2002). Reducing setup times of manufacturing lines. In Proceeding of International Conference on Flexible Automation and Intelligent Manufacturing, Dresden, Germany.
Agustin, R.O., & Santiago F. (1996). Single minute exchange of die. In Proceedings of Advanced Semiconductor Manufacturing Conference Workshop, ASMC 96, Theme, Innovative Approaches to Growth in the Semiconductor Industry, 214-217.
Alves, A. S., & Tenera, A. (2009). Improving SMED in the Automotive Industry: A case study. In POMS 20th Annual Conference Orlando, Florid USA, May1 to May (Vol. 4).
Chu, M. T., Shyu, J., Tzeng, G. H., & Khosla, R. (2007). Comparison among three analytical methods for knowledge communities group-decision analysis. Expert systems with applications, 33(4), 1011-1024.
Carrizo Moreira, A., & Campos Silva Pais, G. (2011). Single minute exchange of die: a case study implementation. Journal of Technology Management & Innovation, 6(1), 129-146.
Dura, C., Isac, C., & Drig?, I. (2010). Possibilities of increasing efficiency within serial production management. Annals of the University of Petro?ani, Economics, 10(2), 125-136.
Goubergen, D. (2000). An integrated change framework for setup reduction, Proceedings of the 2009 Industrial Engineering Research Conference.
Fawaz, A. (2003). Lean manufacturing tools and techniques in the process industry with a focus on steel. Doctoral Dissertation, University of Pittsburgh.
Huang, J. J., Tzeng, G. H., & Liu, H. H. (2009). A Revised VIKOR Model for Multiple Criteria Decision Making-The Perspective of Regret Theory. In Cutting-Edge Research Topics on Multiple Criteria Decision Making (pp. 761-768). Springer Berlin Heidelberg.
Hwang, C.L. & Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications. Springer, Berlin Heidelberg.
King, P. L. (2009). SMED in the process industries-Improved flow through shorter product changeover. Industrial Engineer, 41(9), 30.
Leslie, M., Hagood, C., Royer, A., Reece Jr, C. P., & Maloney, S. (2006). Using lean methods to improve OR turnover times. AORN journal, 84(5), 849-855.
Mahmodi, J. (2002). How the SMED technique reduce setup time in the Plastiran Company, Master’s Thesis, Beheshti University.
Moxham, C. & Greatbanks, R. (2001). Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. International Journal of Quality & Reliability Management, (4), 404 - 414.
McIntosh, R. I., Culley, S. J., Mileham, A. R., & Owen, G. W. (2001). Improving changeover performance. Improving Changeover Performance.
Nyhuis, P., Schulze, C. P., & Klemke, T. (2010). Lean-Enablers–An Approach to Design Lean Factories. The Business Review, Cambridge, 1, 113-119.
Oprpcovic, S. (1998). Multi criteria Optimization of Civil Engineering Systems. Belgrade, 302
Opricovic, S., & Tzeng, G. H. (2002). Multicriteria planning of post?earthquake sustainable reconstruction. Computer?Aided Civil and Infrastructure Engineering, 17(3), 211-220.
Opricovic, S., & Tzeng, G. H. (2004). Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research, 156(2), 445-455.
Opricovic, S., & Tzeng, G. H. (2007). Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research, 178(2), 514-529.
Perini?, M., Ikoni?, M., & Mari?i?, S. (2009). Die Casting Process Assessment Using Single Minute Exchange of Dies (SMED) Method, Metalurgija, 48(3), 199-202.
Sarmad, Z., Bazargan, A., & Hejazi, E. (1998). Research methods in the behavioral sciences, Agah Publication [In Persian].
Saunders, M., Lewis, P. & Thornhill, A. (2009). Research Methods for Business Students. 5th. Ed. Financial Times Press
Sekine, K., & Arai, K. (1992). Kaizen for quick changeover, Cambridge productivity Press.
Sousa, R. M., Lima, R. M., Carvalho, J. D., & Alves, A. C. (2009, December). An industrial application of resource constrained scheduling for quick changeover. In Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on (pp. 189-193). IEEE.
Tharisheneprem, S. (2008, November). Achieving full fungibility and Quick Changeover by turning knobs in tape and Reel machine by applying SMED theory. In Electronic Manufacturing Technology Symposium (IEMT), 2008 33rd IEEE/CPMT International (pp. 1-5). IEEE.
Ulutas, B. (2011). An application of SMED Methodology. World Academy of Science, Engineering and Technology, 79, 101.
Van Goubergen, D. & Van Landeghem, H. (2002). Reducing setup times of manufacturing lines. In Proceeding of International Conference on Flexible Automation and Intelligent Manufacturing, Dresden, Germany.