Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Integrating governance, technology, and finance for project management: A systematic review

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (54)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Genetic Algorithm(81)
Organizational performance(81)
Job satisfaction(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 11 Issue 3 pp. 935-950, 2026

Integrating governance, technology, and finance for project management: A systematic review Pages 935-950 PDF Download PDF

Authors: Amira Houaneb, Zhang Yu

📋 Author Affiliations:
A. Houaneb1, Y. Zhang ORCID 2
1 Department of Business Administration, College of Business and Economics, Qassim University, Qassim, Buraidah, Saudi Arabia
2 School of Economics and Management, Chang’an University, Xi’an, 710054, China
doi 10.5267/j.jpm.2026.4.001
Crossref Source: CrossRef

🔑 Keywords: Sustainable Development Goals (SDGs), Project Performance, Governance, Technological Integration, Project Finance, A systematic Review

Abstract: This systematic review synthesizes literature on project performance, which investigates the roles of corporate governance, finance, and operations. This study supports Sustainable Development Goals (SDGs) by synthesizing firm-level studies supporting sustainable financing. The literature signifies that effective corporate governance improves decision-making, risk allocation, and organizational resilience. On the other hand, social networks enhance collaboration and project performance. In addition, technological adoption in financing and project management improves cost control and resource optimization. It also supports effective decision-making, which links operational and financial objectives with corporate sustainability objectives. Moreover, rational capital allocation optimizes risk-sharing with institutional support. Operational management also improves quality assurance and safety. Thus, managerial decision-making helps attain strategic, financial, and sustainability goals. Furthermore, delivery methods and contractual structures help optimize performance through technology adoption and effective operations. The study suggests an adaptive approach with technology support to improve efficiency in project management.

How to cite this paper
APA: Houaneb, A & Yu, Z. (2026). Integrating governance, technology, and finance for project management: A systematic review. Journal of Project Management, 11(3), 935-950.
Chicago/Turabian: Houaneb, A & Yu, Z. 2026. "Integrating governance, technology, and finance for project management: A systematic review." Journal of Project Management 11, no. 3 (2026): 935-950.
AMA: Houaneb, A & Yu, Z. Integrating governance, technology, and finance for project management: A systematic review. Journal of Project Management. 2026;11(3):935-950.

References
Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., & Asenova, D. (2003). Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), 461-470.
Algarni, A. M., Arditi, D., & Polat, G. (2007). Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), 728-735.
Alzahrani, J. I., & Emsley, M. W. (2013). The impact of contractors’ attributes on construction project success: A post construction evaluation. International Journal of Project Management, 31(2), 313-322.
Andalib, R., Hoseini, A., & Gatmiri, B. (2018). A stochastic model of cash flow forecasting considering delays in owners’ payments. Construction Management and Economics, 36(10), 545-564.
Anderson, R. C., Byers, S. S., & Groth, J. C. (2000). The cost of capital for projects: conceptual and practical issues. Management Decision, 38(6), 384-393.
Angling, M. (1988). Resource planning and control in a multiproject environment. International Journal of Project Management, 6(4), 197-201.
Azzam, M., Salameh, M.B., Aryan, L.A., & Haija, A.A. (2025). The association between CEO characteristics and financial performance: The role of governance quality. Journal of Project Management, 10(1), 43–52.
Bakkar, Y., Bark, E., Prause, G., & Ul-Durar, S. (2025). Green Deal and financing sustainable transport in Europe: A target costing analysis. Transport Policy, 163, 185-198.
Bao, Y., Gao, Z., Yang, H., Xu, M., & Wang, G. (2017). Private financing and mobility management of road network with tradable credits. Transportation Research Part A: Policy and Practice, 97, 158-176.
Baucells, M., Grushka-Cockayne, Y., & Hwang, W. (2024). Managerial mental accounting and downstream project decisions. Management Science, 70(12), 8612-8630.
Bertone, E., Stewart, R. A., Sahin, O., Alam, M., Zou, P. X., Buntine, C., & Marshall, C. (2018). Guidelines, barriers and strategies for energy and water retrofits of public buildings. Journal of Cleaner Production, 174, 1064-1078.
Carr, P. G., & Beyor, P. S. (2005). Design fees, the state of the profession, and a time for corrective action. Journal of Management in Engineering, 21(3), 110-117.
Cenatempo, D. J. (1996). Project financing offers investment options with low borrower risk. Pulp & Paper, 70(13), 93-98.
Chan, S. L., & Park, M. (2005). Project cost estimation using principal component regression. Construction Management and Economics, 23(3), 295-304.
Chang, C. Y. (2013). Understanding the hold-up problem in the management of megaprojects: The case of the Channel Tunnel Rail Link project. International Journal of Project Management, 31(4), 628-637.
Chang, C. Y., & Ive, G. (2007). Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(8), 845-855.
Chen, C. (2009). Can the pilot BOT Project provide a template for future projects? A case study of the Chengdu No. 6 Water Plant B Project. International Journal of Project Management, 27(6), 573-583.
Chijoo, L. (2019). Financing Method For Real Estate And İnfrastructure Development Using Markowitz’s Portfolio Selection Model And The Monte Carlo Simulation. Engineering Construction and Architectural Management, 26(9), 2008-2022.
Daube, D., Vollrath, S., & Alfen, H. W. (2008). A comparison of Project Finance and the Forfeiting Model as financing forms for PPP projects in Germany. International Journal of Project Management, 26(4), 376-387.
De Lemos, T., Eaton, D., Betts, M., & de Almeida, L. T. (2004). Risk management in the Lusoponte concession—a case study of the two bridges in Lisbon, Portugal. International Journal of Project Management, 22(1), 63-73.
De Marco, A., & Mangano, G. (2013). Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), 918-926.
Demirel, H. Ç., Leendertse, W., Volker, L., & Hertogh, M. (2017). Flexibility in PPP contracts–Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), 196-206.
Durdyev, S., & Mbachu, J. (2018). Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), 385-393.
Edkins, A. J., & Smyth, H. J. (2006). Contractual management in PPP projects: evaluation of legal versus relational contracting for service delivery. Journal of Professional Issues in Engineering Education and Practice, 132(1), 82-93.
Elazouni, A. M., & Gab-Allah, A. A. (2004). Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), 15-24.
Elazouni, A. M., & Metwally, F. G. (2005). Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), 400-412.
Elazouni, A. M., & Metwally, F. G. (2007). Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), 86-90.
El‐Haram, M. A., Marenjak, S., & Horner, M. W. (2002). Development of a generic framework for collecting whole life cost data for the building industry. Journal of Quality in Maintenance Engineering, 8(2), 144-151.
Enshassi, A. (1997). Site organization and supervision in housing projects in the Gaza Strip. International Journal of Project Management, 15(2), 93-99.
Farrell, L. M. (2003). Principal-agency risk in project finance. International Journal of Project Management, 21(8), 547-561.
Gallo, M., & Gardiner, P. D. (2007). Triggers for a flexible approach to project management within UK financial services. International Journal of Project Management, 25(5), 446-456.
Gandhi, K. (1996). Controlling overhead costs. Journal of Management in Engineering, 12(4), 18-22.
Grimsey, D., & Lewis, M. K. (2002). Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management, 20(2), 107-118.
Gruneberg, S., Hughes, W., & Ancell, D. (2007). Risk under performance‐based contracting in the UK construction sector. Construction Management and Economics, 25(7), 691-699.
Hallowell, M. R. (2011). Risk-based framework for safety investment in construction organizations. Journal of Construction Engineering and Management, 137(8), 592-599.
Hassan, M. K., Hasan, R., Bataineh, H., & Haque, M. (2025). Bank board diversity and environmental risk management: does critical mass matter in project finance decisions? Managerial Finance, 51(6), 879-895.
Heinonen, L., & Sandberg, B. (2008). Money for nothing? Risks in biopharmaceutical companies from the perspective of public financiers. Journal of Commercial Biotechnology, 14(4), 287-298.
Henjewele, C., Sun, M., & Fewings, P. (2014). Comparative performance of healthcare and transport PFI projects: Empirical study on the influence of key factors. International Journal of Project Management, 32(1), 77-87.
Henry Ndoni, D., & Elhag, T. M. (2010). The integration of human relationships in capital development projects: A case study of BSF scheme. International Journal of Managing Projects in Business, 3(3), 479-494.
Hoang, D., Gatzer, S., & Ruckes, M. (2025). The economics of capital allocation in firms: Evidence from internal capital markets. Management Science, 71(8), 6392-6425.
Holmes, J., Capper, G., & Hudson, G. (2006). Public private partnerships in the provision of health care premises in the UK. International Journal of Project Management, 24(7), 566-572.
Jiménez, L. G., & Pascual, L. B. (2008). Multicriteria cash-flow modeling and project value-multiples for two-stage project valuation. International Journal of Project Management, 26(2), 185-194.
Ketabi, A. B., & Heravi, G. (2022). Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), 643-668.
Kolltveit, B. J., Karlsen, J. T., & Grønhaug, K. (2004). Exploiting opportunities in uncertainty during the early project phase. Journal of Management in Engineering, 20(4), 134-140.
Kometa, S. T., Olomolaiye, P. O., & Harris, F. C. (1994). Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), 433-443.
Krüger, V. (1996). How can a company achieve improved levels of quality performance: technology versus employees? The TQM Magazine, 8(3), 11-20.
Kumar, D. (1989). Developing strategies and philosophies early for successful project implementation. International Journal of Project Management, 7(3), 164-171.
Kumar, R. L. (2002). Managing risks in IT projects: an options perspective. Information & management, 40(1), 63-74.
Kuprenas, J. A. (2003). Project management actions to improve design phase cost performance. Journal of Management in Engineering, 19(1), 25-32.
Lahdenperä, P., & Koppinen, T. (2009). Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), 61-78.
Lamprou, A., & Vagiona, D. G. (2022). Identification and evaluation of success criteria and critical success factors in project success. Global Journal of Flexible Systems Management, 23(2), 237-253.
Le, Y., Wang, Y., Luo, C., & Peng, Y. (2013). Integration of financial and contract management on the shanghai expo construction program. Journal of Construction Engineering and Management, 139(6), 738-748.
Lee, D. E., Lim, T. K., & Arditi, D. (2012). Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), 376-389.
Ling, F. Y. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24(3), 261-270.
Lu, Q., Won, J., & Cheng, J. C. (2016). A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM). International Journal of Project Management, 34(1), 3-21.
Lucko, G. (2013). Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), 238-253.
Lüdeke-Freund, F., & Loock, M. (2011). Debt for brands: tracking down a bias in financing photovoltaic projects in Germany. Journal of Cleaner Production, 19(12), 1356-1364.
Mahdavian, A., & Shojaei, A. (2020). Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12), 04020140.
Mak, S., & Picken, D. (2000). Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), 130-136.
Malelak, M.I., Tarigan, Z.J.H., Basana, S.R., & Jie, F. (2024). Cash holding and corporate governance on company financial performance: Case study of construction infrastructure project supporting industries on the Indonesian stock exchange. Journal of Project Management, 9(4), 457-470.
Martin, H., Lewis, T. M., & Petersen, A. (2016). Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), 170-188.
Mattar, M. H., & Cheah, C. Y. (2006). Valuing large engineering projects under uncertainty: private risk effects and real options. Construction Management and Economics, 24(8), 847-860.
Mayo, R. E., & Liu, G. (1995). Reform agenda of Chinese construction industry. Journal of Construction Engineering and Management, 121(1), 80-85.
McCarthy, R. (2004). Understanding project costs and building costs. The Bottom Line, 17(1), 6-9.
McGovern, T., & Hicks, C. (2004). Deregulation and restructuring of the global electricity supply industry and its impact upon power plant suppliers. International Journal of Production Economics, 89(3), 321-337.
Ng, S. T., & Zhang, Y. (2008). Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), 721-728.
Olatunji, O. A., Rotimi, J. O. B., Rotimi, F. E., & Silva, C. C. (2024). Causal relationship between project financing and overruns in major dam projects in Africa. Engineering, Construction and Architectural Management, 32(10), 6480-6508.
Owens, J., Ahn, J., Shane, J. S., Strong, K. C., & Gransberg, D. D. (2012). Defining complex project management of large US transportation projects: A comparative case study analysis. Public Works Management & Policy, 17(2), 170-188.
Painuly, J. P., Park, H., Lee, M. K., & Noh, J. (2003). Promoting energy efficiency financing and ESCOs in developing countries: mechanisms and barriers. Journal of Cleaner Production, 11(6), 659-665.
Park, A., & Chang, C. Y. (2013). Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), 223-237.
Park, H. K., Han, S. H., & Russell, J. S. (2005). Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management in Engineering, 21(4), 164-172.
Patel, M., & Robinson, H. (2010). Impact of governance on project delivery of complex NHS PFI/PPP schemes. Journal of Financial Management of Property and Construction, 15(3), 216-234.
Perera, A. A. D. A. J., & Imriyas, K. (2004). An integrated construction project cost information system using MS Access™ and MS Project™. Construction Management and Economics, 22(2), 203-211.
Pryke, S. D. (2005). Towards a social network theory of project governance. Construction Management and Economics, 23(9), 927-939.
Ramabadran, R., Dean, J. W., Evans, J. R., & Raturi, A. S. (2004). Testing the relationship between team and partner characteristics and cooperative benchmarking outcomes. IEEE Transactions on Engineering Management, 51(2), 208-225.
Safapour, E., & Kermanshachi, S. (2019). Identifying early indicators of manageable rework causes and selecting mitigating best practices for construction. Journal of Management in Engineering, 35(2), 04018060.
Sainati, T., Locatelli, G., Smith, N., Brookes, N., & Olver, G. (2020). Types and functions of special purpose vehicles in infrastructure megaprojects. International Journal of Project Management, 38(5), 243-255.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517-526.
Sandhu, M., & Khan, A. (2017). Benchmarking project management dimensions at the lapse of a century: Case of Panama canal and palm diera island mega projects. Benchmarking: An International Journal, 24(6), 1675-1689.
Sanz-Menéndez, L., & Cruz-Castro, L. (2003). Coping with environmental pressures: public research organisations responses to funding crises. Research Policy, 32(8), 1293-1308.
Segelod, E. (1998). A note on the survey of project evaluation techniques in major corporations. International Journal of Production Economics, 54(2), 207-213.
Severson, G. D., Russell, J. S., & Jaselskis, E. J. (1994). Predicting contract surety bond claims using contractor financial data. Journal of Construction Engineering and Management, 120(2), 405-420.
Sharma, N., & Laishram, B. (2025). Unveiling the Path to the Cost of Quality Implementation in the Construction Industry: Multivariate Analysis. Journal of Construction Engineering and Management, 151(2), 04024202.
Styhre, A. (2020). Thinly and thickly capitalized projects: Theorizing the role of the finance markets and capital supply in project management studies. Project Management Journal, 51(4), 378-388.
Swaffield, L. M., & McDonald, A. M. (2008). The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), 132-148.
Tarn, J. M., Yen, D. C., & Beaumont, M. (2002). Exploring the rationales for ERP and SCM integration. Industrial Management & Data Systems, 102(1), 26-34.
Tavakolan, M., & Nikoukar, S. (2025). A BIM and simulation-based finance scheduling method for the steel structure construction project. KSCE Journal of Civil Engineering, 29(5), 100124.
Terlizzi, M. A., & Albertin, A. L. (2017). IT benefits management in financial institutions: Practices and barriers. International Journal of Project Management, 35(5), 763-782.
Touran, A., Atgun, M., & Bhurisith, I. (2004). Analysis of the United States Department of Transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), 719-725.
Tummalapudi, M., Killingsworth, J., Harper, C., & Mehaney, M. (2021). US construction industry managerial strategies for economic recession and recovery: A Delphi study. Journal of Construction Engineering and Management, 147(11), 04021146.
Van Hofwegen, P. J. (1999). Asset management programmes for financial planning and management in irrigation and drainage. Irrigation and Drainage Systems, 13(2), 131-143.
Wang, W. C. (2004). Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), 455-460.
Wang, Y., & Jin, X. (2019). Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, construction and architectural management, 26(7), 1348-1366.
Willcocks, L., & Griffiths, C. (1994). Predicting risk of failure in large-scale information technology projects. Technological Forecasting and Social Change, 47(2), 205-228.
Yang, I. T. (2005b). Chance-constrained time–cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), 1002-1012.
Yang, I. T. (2005a). Impact of budget uncertainty on project time-cost tradeoff. IEEE Transactions on Engineering Management, 52(2), 167-174.
Yang, W., Firouzi, A., & Li, C. Q. (2023). Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), 1-21.
Yeung, D., & Skitmore, M. (2012). A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), 929-939.
Yilmaz, S., Kumar, D., Hada, S., Demirkesen, S., Zhang, C., & Li, H. (2025). A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), 861-875.
Zapalac, R., Kuemmler, K., & Malagon, T. (1994). Establishing management information systems for multiproject programs. Journal of Management in Engineering, 10(1), 37-42.
Zayed, T. M., & Chang, L. M. (2002). Prototype model for build-operate-transfer risk assessment. Journal of Management in Engineering, 18(1), 7-16.
Zhang, X. (2005). Concessionaire’s financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction engineering and Management, 131(10), 1054-1064.
Zhang, X., Bao, H., Wang, H., & Skitmore, M. (2016). A model for determining the optimal project life span and concession period of BOT projects. International Journal of Project Management, 34(3), 523-532.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2026 | 📖 Volume: 11 | 📄 Issue: 3 | 👁️ Views: 159 | 📊 Crossref:

Related Articles:
  • A survey of the methods, aspects and trends of life insurance efficiency papers
  • Unlocking project SDGs in furniture manufacturing: The mediating role of green innovation resilience
  • Inventory control of deteriorating items: A review
  • A review on green remediation techniques for hydrocarbons and heavy metals contaminated soil
  • Supply chain collaboration: A state-of-the-art literature review

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com