Amoah, A., & Marimon, F. (2021). Project managers as knowledge workers: Competencies for effective project management in developing countries. Administrative Sciences, 11(4). https://doi.org/10.3390/admsci11040131
Bai, C., & Sarkis, J. (2013). A grey-based DEMATEL model for evaluating business process management critical success factors. International Journal of Production Economics, 146(1), 281–292. https://doi.org/10.1016/j.ijpe.2013.07.011
Barney, J. (1991). Firm Reources ad Sustained Competitive Advantege. En Journal of Management (Vol. 17, Número 1, pp. 99–120).
Becker, G. S. (1964). Human capital: A theoretical and empirical analysis, with special reference to education (U. of C. Press (ed.)).
Bensch, G., Peters, J., & Schmidt, C. M. (2012). Impact evaluationofproductiveuse-An implementationguidelinefor electrificationprojects. Energy Policy, 40(1), 186–195. https://doi.org/10.1016/j.enpol.2011.09.034
Bosma, N., Content, J., Sanders, M., & Stam, E. (2018). Institutions, entrepreneurship, and economic growth in Europe. Small Business Economics, 51(2), 483–499. https://doi.org/10.1007/s11187-018-0012-x
Boyatzis., R. E. (1982). The Competent Manager: A Model for Effective Performance. (Wiley (ed.)).
Cameron, R., Sankaran, S., & Scales, J. (2015). Mixed Methods Use in Project Management Research. Project Management Journal. Project Management Journal, 46(May), 90–104. https://doi.org/10.1002/pmj.21484
Chemirbayeva, M., Malgarayeva, Z., & Azamatova, A. (2020). Economic strategy of diversification of enterprise activities under conditions of globalization. Entrepreneurship and Sustainability Issues, 8(2), 1083–1102. https://doi.org/10.9770/jesi.2020.8.2(65)
Coccia, M., & Rolfo, S. (2009). Project management in public research organisations: strategic change in complex scenarios. International Journal of Project Organisation and Management, 1(3), 235–252. https://doi.org/10.1504/IJPOM.2009.027537
de Guimarães, J. C. F., Severo, E. A., & Vieira, P. S. (2017). Cleaner production, project management and Strategic Drivers: An empirical study. Journal of Cleaner Production, 141, 881–890. https://doi.org/10.1016/j.jclepro.2016.09.166
De Rezende, L. B., Blackwell, P., & Pessanha Gonçalves, M. D. (2018). Research Focuses, Trends, and Major Findings on Project Complexity: A Bibliometric Network Analysis of 50 Years of Project Complexity Research. Project Management Journal, 49(1), 42–56. https://doi.org/10.1177/875697281804900104
Demirdogen, G., & Isik, Z. (2016). EFFECT OF INTERNAL CAPABILITIES ON SUCCESS OF CONSTRUCTION COMPANY INNOVATION AND TECHNOLOGY TRANSFER. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 23(6), 1763–1770. https://doi.org/10.17559/TV-20151222154916
Demirdöğen, G., & Işık, Z. (2016). Učinak vlastitog potencijala na uspješnost inovacija i prijenosa tehnologije u građevinskom poduzeću. Tehnicki Vjesnik, 23(6), 1763–1770. https://doi.org/10.17559/TV-20151222154916
Ekambaram, A., SØrensen, A., Bull-Berg, H., & Olsson, N. O. E. (2018). The role of big data and knowledge management in improving projects and project-based organizations. Procedia Computer Science, 138, 851–858. https://doi.org/10.1016/j.procs.2018.10.111
Farhang Moghaddam, B. (2019). Mapping optimization techniques in project management. Journal of Project Management, 4, 217–228. https://doi.org/10.5267/j.jpm.2019.3.003
Forbes, L. H., & Ahmed, S. M. (2010a). Modern Construction: Lean Project Delivery and Integrated Practices (Primera). CRC Press.
Forbes, L. H., & Ahmed, S. M. (2010b). Modern Construction. En Modern Construction. https://doi.org/10.1201/b10260
Gaddis, P. O. (2021). Desempeño profesional de egresados de la maestría en Farmacoepidemiología. http://orcid.org/0000-0001-9128-7614http://orcid.org/0000-0002-1634-1307
Geraldi, J., & Söderlund, J. (2018). Project studies: What it is, where it is going. International Journal of Project Management, 36(1), 55–70. https://doi.org/10.1016/j.ijproman.2017.06.004
Hair, J. F., Hult, G. T. M., Ringle, C. M., Sarstedt, M., Danks, N. P., & Ray, S. (2021). Evaluation of Formative Measurement Models. https://doi.org/10.1007/978-3-030-80519-7_5
Hair, J. F., Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2), 106–121. https://doi.org/10.1108/EBR-10-2013-0128
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43(1), 115–135. https://doi.org/10.1007/s11747-014-0403-8
Hodgson, D. (2002). Disciplining the professional: The case of Project Management. Journal of Management Studies, 39(6), 803–821. https://doi.org/10.1111/1467-6486.00312
Kerzner., H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. (Wiley (ed.); 11a edició).
Koç, T., Kurt, K., & Akbiyik, A. (2019). A Brief Summary of Knowledge Management Domain: 10-Year History of the Journal of Knowledge Management. Procedia Computer Science, 158, 891–898. https://doi.org/10.1016/j.procs.2019.09.128
Kolb, D. A. (1984). Experiential Learning: Experience as the Source of Learning and Development (Prentice-Hall (ed.); 1a edición).
Kontio, J., & Haapasalo, H. (2005). A project model in managing production ramp-up - A case study in wire harness industry. International Journal of Innovation and Technology Management, 2(1), 101–117. https://doi.org/10.1142/S021987700500037X
Kostalova, J., Bednarikova, M., & Patak, M. (2018). Project Management Education in Metallurgical Companies in the Czech Republic. Business, Management and Education, 16(0), 54–64. https://doi.org/10.3846/bme.2018.2223
Li, S. S., Han, S. Y., & Shen, T. Y. (2019). How Can a Firm Innovate When Embedded in a Cluster?Evidence from the Automobile Industrial Cluster in China. SUSTAINABILITY, 11(7). https://doi.org/10.3390/su11071837
Magano, J., Silva, C., Figueiredo, C., Vitória, A., Nogueira, T., & Dinis, M. A. P. (2020). Generation Z: Fitting project management soft skills competencies—A mixed-method approach. Education Sciences, 10(7), 1–24. https://doi.org/10.3390/educsci10070187
Neverauskas, B., & Railaite, R. (2013). Formation Approach for Project Management. Economics and Management, 18(2), 360–365. http://dx.doi.org/10.5755/j01.em.18.2.4604
Nijhuis, S., Vrijhoef, R., & Kessels, J. (2018). Tackling Project Management Competence Research. Project Management Journal, 49(3), 62–81. https://doi.org/10.1177/8756972818770591
Project Management Institute. (2021). Guía de los Fundamentos para la Dirección de Proyectos y El Estándar para la Dirección de Proyectos. En Guía del PMBOK.
Ringle, C. M.; Wende, S.; Becker, J.-M. (2024). SmartPLS 4. SmartPLS GmbH. https://www.smartpls.com
Sanjuan, A. G., & Froese, T. (2013). The Application of Project Management Standards and Success Factors to the Development of a Project Management Assessment Tool. Procedia - Social and Behavioral Sciences, 74, 91–100. https://doi.org/10.1016/j.sbspro.2013.03.035
Severo, E. A., Sbardelotto, B., de Guimarães, J. C. F., & de Vasconcelos, C. R. M. (2020). Project management and innovation practices: backgrounds of the sustainable competitive advantage in Southern Brazil enterprises. Production Planning and Control, 31(15), 1276–1290. https://doi.org/10.1080/09537287.2019.1702734
Söderlund, J., & Maylor, H. (2012). Project management scholarship: Relevance, impact and five integrative challenges for business and management schools. International Journal of Project Management, 30(6), 686–696. https://doi.org/10.1016/j.ijproman.2012.03.007
Sousa, P., Tereso, A., Alves, A., & Gomes, L. (2018). Implementation of project management and lean production practices in a SME Portuguese innovation company. Procedia Computer Science, 138, 867–874. https://doi.org/10.1016/j.procs.2018.10.113
Spencer, L. M., & Spencer., S. M. (1993). Competence at Work: Models for Superior Performance. (Wiley (ed.)).
Stevenson, D., & Atarkweather, J. (2009). PM critical competency index: IT execs prefer soft skills. International Journal of Project Management, 28(7), 663–671. https://doi.org/10.1016/j.ijproman.2009.11.008
Stevenson, D., & Starkweather, J. A. (2010). PM critical competency index: IT execs prefer soft skills. International Journal of Project Management, 28(7), 663–671. https://doi.org/10.1016/j.ijproman.2009.11.008
Teece, D. J., Pisano, G., & Shuen, A. (2009). Dynamic capabilities and strategic management. Knowledge and Strategy, 18(March), 77–116. https://doi.org/10.4337/9781035334995.00014
Teizer, J., Lao, D., & Sofer, M. (2007). Rapid automated monitoring of construction site activities using ultra-wideband. Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction, 2, 23–28. https://doi.org/10.22260/isarc2007/0008
Teo, T. S. H. (2005). Meeting the challenges of knowledge management at the Housing and Development Board. Decision Support Systems, 41(1), 147–159. https://doi.org/10.1016/j.dss.2004.05.013
Turner, J. R., Müller, R., & Dulewicz, V. (2009). International Journal of Managing Projects in Business. En International Journal of Managing Projects in Business (Vol. 2). http://www.emeraldinsight.com/journals.htm?issn=1753-8378&volume=2&issue=2&articleid=1781094&show=abstract
Wang, H., Bai, L., Huang, N., Du, Q., & Zhang, T. (2019). Social project culture: A new project management culture to promote the sustainable development of organizations. Sustainability (Switzerland), 11(1). https://doi.org/10.3390/su11010202
Wang, H. M., Yang, Z. J., & Guo, Y. T. (2014). An exploration of the building of enterprise multi-project management system. Proceedings of the 5th International Asia Conference on Industrial Engineering and Management Innovation, IEMI 2014, Iemi 2014, 349–352. https://doi.org/10.2991/978-94-6239-100-0_64