Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » A learnheuristic method for solving resource constrained project scheduling problem

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 10 Issue 4 pp. 763-780, 2025

A learnheuristic method for solving resource constrained project scheduling problem Pages 763-780 PDF Download PDF

Authors: Behnam Jahani, Mohammad Amin Adibi

📋 Author Affiliations:
B. Jahani, M.A. Adibi ORCID
¹ Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
doi 10.5267/j.jpm.2025.7.002
Crossref Source: CrossRef

🔑 Keywords: Resource constrained project scheduling problem (RCPSP), Learnheuristic, Decision Tree, Genetic Algorithm

Abstract: Project scheduling in resource-constrained mode is one of the most important issues in the field of project management. The main philosophy of this problem is to use less resources while respecting the resource limit to complete the project in a shorter time although other goals can be considered. When a very large amount of data is generated by the meta-heuristic algorithm and there are many variables involved in solving the problem, no other algorithm or technique is able to analyze the output. For this purpose, learnheuristics have the ability to use combined metaheuristics and machine learning tools with high accuracy and in less time to analyze data. The primary purpose of this research is to combine machine learning and genetic algorithms to reduce the project completion time which can lead to a reduction in the cost of the project. Due to the population-based nature of the problem a large amount of initial population was generated. In order to convert the generated schedules into feasible ones, a repair strategy was used. A data matrix was created to import data into the ML model. After specifying the training and testing settings of the model, the decision tree was used to analyze the data of the problem, then its output was applied to the initial population using the displacement or relocation procedure. This manipulated population is given to Genetic Algorithm (GA) and continues until a certain iteration. j60data on the PSPLIB website was used to evaluate the suggested approach. The findings indicate that the implemented approach has improved by 21.75% compared to the normal GA. This improvement means that a better solution could be achieved in less time with fewer calls.

How to cite this paper
APA: Jahani, B & Adibi, M. (2025). A learnheuristic method for solving resource constrained project scheduling problem. Journal of Project Management, 10(4), 763-780.
Chicago/Turabian: Jahani, B & Adibi, M. 2025. "A learnheuristic method for solving resource constrained project scheduling problem." Journal of Project Management 10, no. 4 (2025): 763-780.
AMA: Jahani, B & Adibi, M. A learnheuristic method for solving resource constrained project scheduling problem. Journal of Project Management. 2025;10(4):763-780.

References
Afshar, M. R., Shahhosseini, V., & Sebt, M. H. (2022). A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), 357-365. https://doi.org/10.1080/15623599.2019.1623992
Bettemir, Ö. H., & Sonmez, R. (2015). Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling. Journal of Management in Engineering, 31(5), 04014082. https://doi.org/10.1061/(ASCE)ME.1943-5479.00003
Blazewicz, J., Lenstra, J. K., & Kan, A. R. (1983). Scheduling subject to resource constraints: classification and complexity. Discrete applied mathematics, 5(1), 11-24. https://doi.org/10.1016/0166-218X(83)90012-4
Cheng, M. Y., Tran, D. H., & Wu, Y. W. (2014). Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems. Automation in Construction, 37, 88-97. https://doi.org/10.1016/j.autcon.2013.10.002
Cooper, D. F. (1976). Heuristics for scheduling resource-constrained projects: An experimental investigation. Management Science, 22(11), 1186-1194.https://doi.org/10.1287/mnsc.22.11.1186
Damak, N., Jarboui, B., Siarry, P., & Loukil, T. (2009). Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & Operations Research, 36(9), 2653-2659.https://doi.org/10.1016/j.cor.2008.11.010
Demeulemeester, E., Vanhoucke, M., & Herroelen, W. (2003). RanGen: A random network generator for activity-on-the-node networks. Journal of scheduling, 6, 17-38. https://doi.org/10.1023/A:1022283403119
Etminaniesfahani, A., Gu, H., Naeni, L. M., & Salehipour, A. (2022). A forward–backward relax-and-solve algorithm for the resource-constrained project scheduling problem. SN Computer Science, 4(2), 104. https://doi.org/10.1007/s42979-022-01487-1
Fung, I. W., Wong, C. K., Tam, C. M., & Tong, T. K. (2008). Optimizing material hoisting operations and storage cells in single multi-storey tower block construction by genetic algorithm. International Journal of Construction Management, 8(2), 53-64. https://doi.org/10.1080/15623599.2008.10773115
Golab, A., Gooya, E., Falou, A., & Cabon, M. (2023). A convolutional neural network for the resource-constrained project scheduling problem (RCPSP): A new approach. Decision Science Letters, 12(2), 225-238.
Guo, W., Vanhoucke, M., Coelho, J., & Luo, J. (2021). Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem. Expert systems with applications, 167, 114116. https://doi.org/10.1016/j.eswa.2020.114116
Habibi, F., Barzinpour, F., & Sadjadi, S. (2018). Resource-constrained project scheduling problem: review of past and recent developments. Journal of project management, 3(2), 55-88. https://doi.org/10.5267/J.JPM.2018.1.005
Hartmann, S., & Briskorn, D. (2022). An updated survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of operational research, 297(1), 1-14. https://doi.org/10.1016/j.ejor.2021.05.004
Hua, Z., Liu, Z., Yang, L., & Yang, L. (2022). Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem. Automation in Construction, 142, 104503. https://doi.org/10.1016/j.autcon.2022.104503
Khajesaeedi, S., Sadjadi, S., Barzinpour, F & Tavakkoli-Moghaddam, R. (2025). Resource-constrained project scheduling problem: Review of recent developments. Journal of Project Management, 10(1), 1-26. DOI: 10.5267/j.jpm.2024.12.002
Kolisch, R. (1996). Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90(2), 320-333. https://doi.org/10.1016/0377-2217(95)00357-6
Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European journal of operational research, 174(1), 23-37.https://doi.org/10.1016/j.ejor.2005.01.065
Kolisch, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29(3), 249-272. https://doi.org/10.1016/S0305-0483(00)00046-3
Lee, K. Y., & El-Sharkawi, M. A. (Eds.). (2008). Modern heuristic optimization techniques: theory and applications to power systems. John Wiley & Sons.
Li, C., Wang, F & Chung, T. (2024). Multi-mode multi-skill resource-constrained project scheduling problem with differentiated professional capabilities. Journal of Project Management, 9(1), 27-44. DOI: 10.5267/j.jpm.2023.9.002
Liu, Q., Liu, X., Wu, J., & Li, Y. (2019). An improved NSGA-III algorithm using genetic K-means clustering algorithm. Ieee Access, 7, 185239-185249. https://doi.org/10.1109/ACCESS.2019.2960531
Liu, Y., Jin, S., Zhou, J., & Hu, Q. (2023). A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times. Computers & Operations Research, 151, 106097. https://doi.org/10.1016/j.cor.2022.106097
Mastor, A. A. (1970). An experimental investigation and comparative evaluation of production line balancing techniques. Management science, 16(11), 728-746. https://doi.org/10.1287/mnsc.16.11.728
Pascoe, T. L. (1966). Allocation of resources CPM. Revue Francaise de Recherche Operationnele, 10(38), 31-31.
Patterson, J. H. (1976). Project scheduling: The effects of problem structure on heuristic performance. Naval Research Logistics Quarterly, 23(1), 95-123.6) https://doi.org/10.1002/nav.3800230110
Pedregosa, F. (2011). Scikit‐learn: Machine learning in python Fabian. Journal of machine learning research, 12, 2825.
Quinlan, J. R. (1993, June). Combining instance-based and model-based learning. In Proceedings of the tenth international conference on machine learning (pp. 236-243).
Roy, B., & Sen, A. K. (2024). A novel swarm intelligence approach for the constrained scheduling problem. International Journal of Management Science and Engineering Management, 19(3), 199-211. https://doi.org/10.1080/17509653.2023.2248058
Sarkar, D. (2018). Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), 207-220. https://doi.org/10.1080/15623599.2017.1315526
Sarker, I. H., Furhad, M. H., & Nowrozy, R. (2021). Ai-driven cybersecurity: an overview, security intelligence modeling and research directions. SN Computer Science, 2(3), 173. https://doi.org/10.1007/s42979-021-00557-0
Shuvo, O., Golder, S., & Islam, M. R. (2023). A hybrid metaheuristic method for solving resource constrained project scheduling problem. Evolutionary Intelligence, 16(2), 519-537. https://doi.org/10.1007/s12065-021-00675-x
Van Peteghem, V., & Vanhoucke, M. (2010). A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 201(2), 409-418. https://doi.org/10.1016/j.ejor.2009.03.034
Vanhoucke, M., Coelho, J., & Batselier, J. (2016). An overview of project data for integrated project management and control. The Journal of Modern Project Management, 3(3), 158-158.
Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B., & Tavares, L. V. (2008). An evaluation of the adequacy of project network generators with systematically sampled networks. European journal of operational research, 187(2), 511-524.https://doi.org/10.1016/j.ejor.2007.03.032
Xie, L. L., Chen, Y., Wu, S., Chang, R. D., & Han, Y. (2024). Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), 2852-2877.https://doi.org/10.1108/ECAM-04-2022-0345
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2025 | 📖 Volume: 10 | 📄 Issue: 4 | 👁️ Views: 637 | 📊 Crossref:

Related Articles:
  • A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
  • New procedures with new activity assumptions for solving resource constrained project scheduling problems
  • A study on the performance of differential search algorithm for single mode resource constrained project scheduling problem
  • Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms
  • Artificial Bee colony for resource constrained project scheduling problem

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com