Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » An application of fuzzy BWM for risk assessment in offshore oil projects

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

JPM Volumes

    • ▼ Volume 11 (103)
      • Issue 1 (24)
      • Issue 2 (22)
      • Issue 3 (30)
      • Issue 4 (27)
    • ▼ Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)
    • ▼ Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • ▼ Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • ▼ Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • ▼ Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • ▼ Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • ▼ Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Journal of Project Management
ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 4 Issue 3 pp. 233-240, 2019

An application of fuzzy BWM for risk assessment in offshore oil projects Pages 233-240 PDF Download PDF

Authors: Reza Ketabchi, M. R. Ghaeli

📋 Author Affiliations:
R. Ketabchi, M.R. Ghaeli ORCID
¹ School of Management, New York Institute of Technology, 1700-701 W Georgia St, Vancouver, V7Y 1K8, BC, Canada
doi 10.5267/j.jpm.2019.3.001
12 Source: Scopus
Crossref Source: CrossRef

🔑 Keywords: Project management, Risk assessment, Offshore oil projects

Abstract: The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts’ opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, “Technical Risk and Project Execution” is the most important risk factor followed by “Political Risk and Sanctions”, “Market risk”, “Manage-ment risk”, “Financial risk and currency fluctuations” and “Environmental risk”.

How to cite this paper
APA: Ketabchi, R & Ghaeli, M. (2019). An application of fuzzy BWM for risk assessment in offshore oil projects. Journal of Project Management, 4(3), 233-240.
Chicago/Turabian: Ketabchi, R & Ghaeli, M. 2019. "An application of fuzzy BWM for risk assessment in offshore oil projects." Journal of Project Management 4, no. 3 (2019): 233-240.
AMA: Ketabchi, R & Ghaeli, M. An application of fuzzy BWM for risk assessment in offshore oil projects. Journal of Project Management. 2019;4(3):233-240.

References
Ahmed, A., Kayis, B., & Amornsawadwatana, S. (2007). A review of techniques for risk man-agement in projects. Benchmarking: An International Journal, 14(1), 22-36.
Armstrong, M., Galli, A., Bailey, W., & Couët, B. (2004). Incorporating technical uncertainty in real option valuation of oil projects. Journal of Petroleum Science and Engineering, 44(1-2), 67-82.
Basher, S. A., & Sadorsky, P. (2006). Oil price risk and emerging stock markets. Global finance journal, 17(2), 224-251.
Bowers, J. A., & Mould, G. I. (1994). Weather risk in offshore projects. Journal of the Operation-al Research Society, 45(4), 409-418..
Busse, M., & Hefeker, C. (2007). Political risk, institutions and foreign direct invest-ment. European journal of political economy, 23(2), 397-415.
Cordesman, A. H., & Al-Rodhan, K. R. (2006). The global oil market: risks and uncertainties (No. 28). CSIS.
Dey, P. K., & Ogunlana, S. O. (2004). Selection and application of risk management tools and techniques for build-operate-transfer projects. Industrial Management & Data Systems, 104(4), 334-346.
Dikmen, I., Birgonul, M. T., & Han, S. (2007). Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International journal of project management, 25(5), 494-505.
Hafezalkotob, A., & Hafezalkotob, A. (2017). A novel approach for combination of individual and group decisions based on fuzzy best-worst method. Applied Soft Computing, 59, 316-325.
Lee, E., Park, Y., & Shin, J. G. (2009). Large engineering project risk management using a Bayesi-an belief network. Expert Systems with Applications, 36(3), 5880-5887..
Liu, J., Li, Q., & Wang, Y. (2013). Risk analysis in ultra deep scientific drilling project—A fuzzy synthetic evaluation approach. International Journal of Project Management, 31(3), 449-458.
Miller, R., & Lessard, D. (2001). Understanding and managing risks in large engineering pro-jects. International Journal of Project Management, 19(8), 437-443.
Muller, A., & Verschoor, W. F. (2007). Asian foreign exchange risk exposure. Journal of the Jap-anese and International Economies, 21(1), 16-37.
Nieto-Morote, A., & Ruz-Vila, F. (2011). A fuzzy approach to construction project risk assess-ment. International Journal of Project Management, 29(2), 220-231.
Rezaei, J. (2015). Best-worst multi-criteria decision-making method. Omega, 53, 49-57.
Rodríguez, A., Ortega, F., & Concepción, R. (2016). A method for the evaluation of risk in IT projects. Expert Systems with Applications, 45, 273-285..
Salahor, G. (1998). Implications of output price risk and operating leverage for the evaluation of petroleum development projects. The Energy Journal, 19(1), 13-46.
Sharma, S. K. (2013). Risk management in construction projects using combined analytic hierar-chy process and risk map framework. IUP Journal of Operations Management, 12(4), 23-53..
Stejskal, I. V. (2000). Obtaining approvals for oil and gas projects in shallow water marine areas in western Australia using an environmental risk assessment framework. Spill Science & Technol-ogy Bulletin, 6(1), 69-76.
Van Thuyet, N., Ogunlana, S. O., & Dey, P. K. (2007). Risk management in oil and gas construc-tion projects in Vietnam. International journal of energy sector management, 1(2), 175-194. Turskis, Z., Zavadskas, E. K., Antucheviciene, J., & Kosareva, N. (2015). A hybrid model based on fuzzy AHP and fuzzy WASPAS for construction site selection. International Journal of Computers Communications & Control, 10(6), 113-128.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Journal of Project Management | 📅 Year: 2019 | 📖 Volume: 4 | 📄 Issue: 3 | 👁️ Views: 2405 | 📊 Crossref:

Related Articles:
  • The advantage of project risk management tools
  • Ranking Canadian oil and gas projects using TOPSIS
  • Risk management in industrial projects using structural equation modeling
  • An empirical study for ranking risk factors using linear assignment: A case study of road construction
  • Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment

📝 Ready to share your research?

Journal of Project Management is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com