Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Journal of Project Management » Mapping optimization techniques in project management

Journals

  • IJIEC (726)
  • MSL (2637)
  • DSL (649)
  • CCL (495)
  • USCM (1092)
  • ESM (404)
  • AC (557)
  • JPM (247)
  • IJDS (912)
  • JFS (91)
  • HE (21)

JPM Volumes

    • Volume 1 (8)
      • Issue 1 (5)
      • Issue 2 (3)
    • Volume 2 (13)
      • Issue 1 (4)
      • Issue 2 (3)
      • Issue 3 (3)
      • Issue 4 (3)
    • Volume 3 (17)
      • Issue 1 (4)
      • Issue 2 (5)
      • Issue 3 (4)
      • Issue 4 (4)
    • Volume 4 (24)
      • Issue 1 (4)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (4)
    • Volume 5 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 6 (20)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 7 (21)
      • Issue 1 (5)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (6)
    • Volume 8 (21)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (5)
      • Issue 4 (5)
    • Volume 9 (35)
      • Issue 1 (6)
      • Issue 2 (5)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 10 (68)
      • Issue 1 (15)
      • Issue 2 (21)
      • Issue 3 (13)
      • Issue 4 (19)

Keywords

Jordan(161)
Supply chain management(160)
Vietnam(148)
Customer satisfaction(120)
Performance(113)
Supply chain(108)
Service quality(98)
Tehran Stock Exchange(94)
Competitive advantage(93)
SMEs(86)
optimization(84)
Financial performance(83)
Trust(81)
Job satisfaction(79)
Social media(78)
Factor analysis(78)
TOPSIS(78)
Knowledge Management(77)
Genetic Algorithm(76)
Sustainability(76)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(59)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Dmaithan Almajali(35)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Ahmad Makui(31)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Sautma Ronni Basana(27)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2162)
Indonesia(1276)
Jordan(783)
India(779)
Vietnam(500)
Saudi Arabia(438)
Malaysia(438)
United Arab Emirates(220)
China(181)
Thailand(151)
United States(109)
Turkey(102)
Ukraine(99)
Egypt(95)
Canada(89)
Pakistan(84)
Peru(83)
United Kingdom(77)
Nigeria(77)
Morocco(73)


» Show all countries

Journal of Project Management

ISSN 2371-8374 (Online) - ISSN 2371-8366 (Print)
Quarterly Publication
Volume 4 Issue 3 pp. 217-228 , 2019

Mapping optimization techniques in project management Pages 217-228 Right click to download the paper Download PDF

Authors: Babak Farhang Moghaddam

DOI: 10.5267/j.jpm.2019.3.003

Keywords: Optimization, Project Management, Operations Research

Abstract: An important function of the project management is to optimize the project in various phases and at different levels. From sourcing and allocation to scheduling and even dealing with uncertainties, the science of operation research (OR) has played an important role in this area. So far, many papers have been published using the optimization science to make various decisions regarding the project management. This study aims to investigate all papers published on the application of optimization in the project management from 1940 to 2019 and shows: a) how the trend has changed over this 79 years period, b) to what direction the trend has changed, c) determines the interesting topics of the recent years, and d) which subjects are more attractive as future studies as the applications of the optimization techniques in the project management.

How to cite this paper
Moghaddam, B. (2019). Mapping optimization techniques in project management.Journal of Project Management, 4(3), 217-228.

Refrences
Abdel-Hamid, T., Sengupta, K., & Swett, C. (1999, 12). The impact of goals on software project management: An experimental investigation. MIS Quaterly, 23(4), 531-555.
Agarwal, A., Colak, S., & Erenguc, S. (2011, 1). A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research, 38(1, SI), 44-50.
Ahsan, K., & Gunawan, I. (2010, 1). Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28(1), 68-78.
Alba, E., & Chicano, J. (2007, 6). Software project management with GAs. Information Sciences, 177(11), 2380-2401.
Alcaraz, J., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102(1-4), 83-109.
Alcaraz, J., Maroto, C., & Ruiz, R. (2003, 6). Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society, 54(6), 614-626.
Al-Fawzan, M., & Haouari, M. (2005, 5). A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics, 96(2), 175-187.
Artigues, C., Michelon, P., & Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research, 149(2), 249-267.
Arrow, K. J., Cropper, M. L., Gollier, C., Groom, B., Heal, G. M., Newell, R. G., ... & Sterner, T. (2014). Should governments use a declining discount rate in project analysis?. Review of Environmental Economics and Policy, 8(2), 145-163.
Baccarini, D., Salm, G., & Love, P. (2004). Management of risks in information technology projects. Industrial Management & Data Systems, 104(3-4), 286-295.
Ballestin, F. (2007, 6). When it is worthwhile to work with the stochastic RCPSP? Journal of Scheduling, 10(3), 153-166.
Barraza, G., Back, W., & Mata, F. (2004, 1). Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management-ASCE, 130(1), 25-32.
Bendoly, E., & Swink, M. (2007, 4). Moderating effects of information access on project management behavior, performance and perceptions. Journal of Operations Management, 25(3), 604-622.
Bonner, J., Ruekert, R., & Walker, O. (2002, 5). Upper management control of new product development projects and project performance. Journal of Product Innovation Management, 19(3), 233-245.
Bouleimen, K. L. E. I. N., & Lecocq, H. O. U. S. N. I. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149(2), 268-281.
Browning, T., & Yassine, A. (2010, 8). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212-228.
Brucker, P., Drexl, A., Mohring, R., Neumann, K., & Pesch, E. (1999, 1). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
Brucker, P., & Knust, S. (2003). Lower bounds for resource-constrained project scheduling problems. European Journal of Operational Research, 149(2), 302-313.
Cesta, A., Oddi, A., & Smith, S. F. (2002). A constraint-based method for project scheduling with time windows. Journal of Heuristics, 8(1), 109-136.
Chang, A. (2002, 1). Reasons for cost and schedule increase for engineering design projects. Journal of Management in Engineering, 18(1), 29-36.
Chang, C., Christensen, M., & Zhang, T. (2001). Genetic algorithms for project management. Annals of Software Engineering, 11, 107-139.
Chang, C., Jiang, H.-y., Di, Y., Zhu, D., & Ge, Y. (2008, 10). Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology, 50(11), 1142-1154.
Chen, J., & Askin, R. (2009, 2). Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research, 193(1), 23-34.
Chen, W., Shi, Y.-j., Teng, H.-f., Lan, X.-p., & Hu, L.-c. (2010, 3). An efficient hybrid algorithm for resource-constrained project scheduling. Information Sciences, 180(6, SI), 1031-1039.
Chen, W.-N., Zhang, J., Chung, H.-H., Huang, R.-Z., & Liu, O. (2010, 1). Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach. IEEE Transactions on Systems Man and Cybernetics Part C-Applicationa and Reviews, 40(1), 64-77.
Cho, S., & Eppinger, S. (2005, 8). A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management, 52(3), 316-328.
Coelho, J., & Vanhoucke, M. (2011). Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213(1), 73-82.
Choi, J., Realff, M., & Lee, J. (2004, 6). Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application. Computers & Chemical Engineering, 28(6-7), 1039-1058.
Chua, D., Tyagi, A., Ling, S., & Bok, S. (2003, 11). Process-parameter-interface model for design management. Journal of Construction Engineering and Management-ASCE, 129(6), 653-663.
Conigrave, K. M., Degenhardt, L. J., Whitfield, J. B., Saunders, J. B., Helander, A., & Tabakoff, B. (2002). CDT, GGT, and AST as markers of alcohol use: the WHO/ISBRA collaborative project. Alcoholism: Clinical and Experimental Research, 26(3), 332-339.
Debels, D., De Reyck, B., Leus, R., & Vanhoucke, M. (2006). A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research, 169(2), 638-653.
De Reyck, B., & Herroelen, W. (1999, 12). The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119(2), 538-556.
de Vonder, S., Demeulemeester, E., & Herroelen, W. (2007, 6). A classification of predictive-reactive project scheduling procedures. Journal of Scheduling, 10(3), 195-207.
de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005, 8). The use of buffers in project management: The trade-off between stability and makespan. International Journal of Production Economics, 97(2), 227-240.
Dorndorf, U., Pesch, E., & Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research, 52(3), 413-439.
Drezet, L. E., & Billaut, J. C. (2008). A project scheduling problem with labour constraints and time-dependent activities requirements. International Journal of Production Economics, 112(1), 217-225.
Elazouni, A., & Metwally, F. (2007, 1). Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management-ASCE, 133(1), 86-90.
Elloumi, S., & Fortemps, P. (2010). A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 205(1), 31-41.
Galloway, P. D. (2006). Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of construction engineering and management, 132(7), 697-711.
Georgy, M. (2008, 7). Evolutionary resource scheduler for linear projects. Automation in Construction, 17(5), 573-583.
Ghasemzadeh, F., Archer, N., & Iyogun, P. (1999, 7). A zero-one model for project portfolio selection and scheduling. Journal of the Operational Research Society, 50(7), 745-755.
Ghoddousi, P., Eshtehardian, E., Jooybanpour, S., & Javanmardi, A. (2013, 3). Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Automation in Construction, 30, 216-227.
Goncalves, J., Mendes, J., & Resende, M. (2008, 9). A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 189(3), 1171-1190.
Gutjahr, W., Strauss, C., & Wagner, E. (2000, 3). A stochastic branch-and-bound approach to activity crashing in project management. Informs Journal on Computing, 12(2), 125-135.
Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., & Denk, M. (2008). Competence-driven project portfolio selection, scheduling and staff assignment. Central European Journal of Operations Research, 16(3), 281-306.
Hartmann, S. (1998). A competitive genetic algorithm for resource‐constrained project scheduling. Naval Research Logistics (NRL), 45(7), 733-750.
Hartmann, S. (2001). Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research, 102, 111-135.
Hartmann, D., De Strooper, B., Serneels, L., Craessaerts, K., Herreman, A., Annaert, W., ... & Saftig, P. (2002). The disintegrin/metalloprotease ADAM 10 is essential for Notch signalling but not for α-secretase activity in fibroblasts. Human Molecular Genetics, 11(21), 2615-2624.
Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1-14.
Hegazy, T., & Ersahin, T. (2001, 11). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management-ASCE, 127(6), 469-475.
Heilmann, R. (2003, 1). A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research, 144(2), 348-365.
Heimerl, C., & Kolisch, R. (2010). Scheduling and staffing multiple projects with a multi-skilled workforce. OR Spectrum, 32(2), 343-368.
Herroelen, W. (2005, 3). Project scheduling - Theory and practice. Production and Operations Management, 14(4), 413-432.
Herroelen, W., & Leus, R. (2004, 4). Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42(8), 1599-1620.
Herroelen, W., & Leus, R. (2004, 8). The construction of stable project baseline schedules. European Journal of Operational Research, 156(3), 550-565.
Herroelen, W., & Leus, R. (2005, 9). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306.
Hoegl, M., Weinkauf, K., & Gemuenden, H. G. (2004). Interteam coordination, project commitment, and teamwork in multiteam R&D projects: A longitudinal study. Organization Science, 15(1), 38-55.
Hoegl, M., & Parboteeah, K. (2007, 3). Creativity in innovative projects: How teamwork matters. Journal of Engineering and Technology Management, 24(1-2), 148-166.
Hoegl, M., & Wagner, S. (2005, 8). Buyer-supplier collaboration in product development projects. Journal of Management, 31(4), 530-548.
Hoegl, M., Parboteeah, K., & Gemuenden, H. (2003, 12). When teamwork really matters: task innovativeness as a moderator of the teamwork-performance relationship in software development projects. Journal of Engineering and Technology Management, 20(4), 281-302.
Huchzermeier, A., & Loch, C. (2001, 1). Project management under risk: Using the real options approach to evaluate flexibility in R&D. Management Science, 47(1), 85-101.
Hwang, B.-G., Zhao, X., & Goh, K. (2014, 5). Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management, 32(4), 698-708.
Hyari, K., & El-Rayes, K. (2006, 1). Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering, 22(1), 11-19.
Ibbs, C., Wong, C., & Kwak, Y. (2001, 7). Project change management system. Journal of Management in Engineering, 17(3), 159-165.
Jarboui, B., Damak, N., Siarry, P., & Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation, 195(1), 299-308.
Jergeas, G., & Put, J. V. D. (2001). Benefits of constructability on construction projects. Journal of Construction Engineering and management, 127(4), 281-290.
Kaliba, C., Muya, M., & Mumba, K. (2009, 7). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531.
Karim, A., & Adeli, H. (1999, 9). CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management-ASCE, 125(5), 368-376.
Karniel, A., & Reich, Y. (2009, 11). From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues. IEEE Transactions on Engineering Management, 56(4), 636-649.
Kastor, A., & Sirakoulis, K. (2009, 7). The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem. International Journal of Project Management, 27(5), 493-500.
Ke, H., & Liu, B. (2005, 9). Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation, 168(1), 342-353.
Ke, H., & Liu, B. (2010, 2). Fuzzy project scheduling problem and its hybrid intelligent algorithm. Applied Mathematical Modelling, 34(2), 301-308.
Keil, M., Mann, J., & Rai, A. (2000, 12). Why software projects escalate: An empirical analysis and test of four theoretical models. MIS Quaterly, 24(4), 631-664.
Keller, R. (2001, 6). Cross-functional project groups in research and new product development: Diversity, communications, job stress, and outcomes. Academy of Management Journal, 44(3), 547-555.
Keller, R. (2006, 1). Transformational leadership, initiating structure, and substitutes for leadership: A longitudinal study of research and development project team performance. Journal of Applied Psychology, 91(1), 202-210.
Klein, R. (2000, 12). Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects. European Journal of Operational Research, 127(3), 619-638.
Klein, R., & Scholl, A. (1999, 1). Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling. European Journal of Operational Research, 112(2), 322-346.
Kolisch, R., & Padman, R. (2001, 6). An integrated survey of deterministic project scheduling. OMEGA-International Journal of Management Science, 29(3), 249-272.
Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23-37.
Kone, O., Artigues, C., Lopez, P., & Mongeau, M. (2011, 1). Event-based MILP models for resource-constrained project scheduling problems. Computers & Operations Research, 38(1, SI), 3-13.
Koulinas, G., & Anagnostopoulos, K. (2013, 5). A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Automation in Construction, 31, 169-175.
Kuo, S., Merkley, G., & Liu, C. (2000, 8). Decision support for irrigation project planning using a genetic algorithm. Agricultural Water Management, 45(3), 243-266.
Lambrechts, O., Demeulemeester, E., & Herroelen, W. (2011, 6). Time slack-based techniques for robust project scheduling subject to resource uncertainty. Annals of Operations Research, 186(1), 443-464.
Lee, E., Park, Y., & Shin, J. (2009, 4). Large engineering project risk management using a Bayesian belief network. Expert Systems with Application, 36(3), 5880-5887.
Levardy, V., & Browning, T. (2009, 11). An Adaptive Process Model to Support Product Development Project Management. IEEE Transactions on Engineering Management, 56(4), 600-620.
Liberatore, M., Pollack-Johnson, B., & Smith, C. (2001, 3). Project management in construction: Software use and research directions. Journal of Construction Engineering and Management-ASCE, 127(2), 101-107.
Linberg, K. (1999, 12). Software developer perceptions about software project failure: a case study. Journal of Systems and Software, 49(2-3), 177-192.
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009, 5). Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4), 400-407.
Liu, S.-S., & Wang, C.-J. (2008, 11). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17(8), 966-974.
Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research, 102, 263-286.
Love, P. (2002, 1). Influence of project type and costs in building procurement method on rework construction projects. Journal of Construction Engineering and Management-ASCE, 128(1), 18-29.
Love, P., Edwards, D., & Irani, Z. (2008, 5). Forensic project management: An exploratory examination of the causal behavior of design-induced rework. IEEE Transactions on Engineering Management, 55(2), 234-247.
Love, P., Edwards, D., & Irani, Z. (2012, 11). Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns. IEEE Transactions on Engineering Management, 59(4), 560-571.
Love, P., Edwards, D., Smith, J., & Walker, D. (2009, 11). Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects. Journal of Performance of Constructed Facilities, 23(6), 480-488.
Love, P., Liu, J., Matthews, J., Sing, C.-P., & Smith, J. (2015, 8). Future proofing PPPs: Life-cycle performance measurement and Building Information Modelling. Automation in Construction, 56, 26-35.
Luu, V., Kim, S.-Y., Tuan, N., & Ogunlana, S. (2009, 1). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39-50.
Lyneis, J., Cooper, K., & Els, S. (2001, 3). Strategic management of complex projects: a case study using system dynamics. System Dynamics Review, 17(3), 237-260.
Ma, Z., Shen, Q., & Zhang, J. (2005, 6). Application of 4D for dynamic site layout and management of construction projects. Automation in Construction, 14(3, SI), 369-381.
McKoy, J. M., Angelotta, C., Bennett, C. L., Tallman, M. S., Wadleigh, M., Evens, A. M., ... & DeAngelo, D. J. (2007). Gemtuzumab ozogamicin-associated sinusoidal obstructive syndrome (SOS): an overview from the research on adverse drug events and reports (RADAR) project. Leukemia Research, 31(5), 599-604.
Mendes, J., Goncalves, J., & Resende, M. (2009, 1). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1, SI), 92-109.
Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE transactions on evolutionary computation, 6(4), 333-346.
Mika, M., Waligora, G., & Weglarz, J. (2005, 8). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research, 164(3), 639-668.
Mohring, R., Schulz, A., Stork, F., & Uetz, M. (2003, 3). Solving project scheduling problems by minimum cut computations. Management Science, 49(3), 330-350.
Na, K.-S., Simpson, J., Li, X., & Singh Tushar and Kim, K.-Y. (2007, 4). Software development risk and project performance measurement: Evidence in Korea. Journal of Systems and Software, 80(4, SI), 596-605.
Neumann, K., & Zimmermann, J. (1999, 9). Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research, 117(3), 591-605.
Neumann, K., & Zimmermann, J. (2000, 12). Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127(2), 425-443.
Nightingale, P. (2000, 8). The product-process-organisation relationship in complex development projects. Research Policy, 29(7-8), 913-930.
Nitithamyong, P., & Skibniewski, M. (2006, 1). Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), 80-87.
Palpant, M., Artigues, C., & Michelon, P. (2004). LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research, 131(1-4), 237-257.
Park, M., & Pena-Mora, F. (2003, 3). Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review, 19(3), 213-242.
Pena-Mora, F., & Park, M. (2001, 11). Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management-ASCE, 127(6), 445-456.
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., & Mikalauskas, S. (2010, 5). The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Automation in Construction, 19(3, SI), 357-367.
Ropponen, J., & Lyytinen, K. (2000). Components of software development risk: How to address them? A project manager survey. IEEE Transactions on Software Engineering, 26(2), 98-112.
Pulley, J. M., Denny, J. C., Peterson, J. F., Bernard, G. R., Vnencak‐Jones, C. L., Ramirez, A. H., ... & Crawford, D. C. (2012). Operational implementation of prospective genotyping for personalized medicine: the design of the Vanderbilt PREDICT project. Clinical Pharmacology & Therapeutics, 92(1), 87-95.
Schwindt, C. (2006). Resource allocation in project management. Springer Science & Business Me-dia. Scott-Young, C., & Samson, D. (2008, 11). Project success and project team management: Evidence from capital projects in the process industries. Journal of Operations Management, 26(6), 749-766.
Senouci, A., & Adeli, H. (2001, 1). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Smith, H., & Keil, M. (2003, 1). The reluctance to report bad news on troubled software projects: a theoretical model. Information Systems Journal, 13(1), 69-95.
Sobel, M., Szmerekovsky, J., & Tilson, V. (2009, 11). Scheduling projects with stochastic activity duration to maximize expected net present value. European Journal of Operational Research, 198(3), 697-705.
Tavares, L. V. (2002). A review of the contribution of operational research to project management. European Journal of Operational Research, 136(1), 1-18.
Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for Resource-Constrained Project Scheduling. Annals of Operations Research, 102, 65-81.
Ulusoy, G., & Cebelli, S. (2000, 12). An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research, 127(2), 262-278.
Valls, V., Ballestin, F., & Quintanilla, S. (2008, 3). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185(2), 495-508.
Valls, V., Perez, A., & Quintanilla, S. (2009, 3). Skilled workforce scheduling in Service Centres. European Journal of Operational Research, 193(3), 791-804.
Van De Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2006, 1). The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research, 44(2), 215-236.
Vanhoucke, M., & Vandevoorde, S. (2007, 10). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361-1374.
Vanhoucke, M., Demeulemeester, E., & Herroelen, W. (2001, 8). On maximizing the net present value of a project under renewable resource constraints. Management Science, 47(8), 1113-1121.
Viana, A., & de Sousa, J. P. (2000). Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research, 120(2), 359-374.
Wang, H., Zhang, J., Chau, K., & Anson, M. (2004, 9). 4D dynamic management for construction planning and resource utilization. Automation in Construction, 13(5), 575-589.
Wang, J., & Lin, Y.-I. (2009, 9). An overlapping process model to assess schedule risk for new product development. Computers & Industrial Engineering, 57(2, SI), 460-474.
Wang, M., & Chou, H. (2003, 4). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60-68.
Wang, W.-C., Weng, S.-W., Wang, S.-H., & Chen, C.-Y. (2014, 1). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80.
Węglarz, J., Józefowska, J., Mika, M., & Waligóra, G. (2011). Project scheduling with finite or infinite number of activity processing modes–A survey. European Journal of Operational Research, 208(3), 177-205.
Yang, L.-R., Chen, J.-H., & Wang, H.-W. (2012, 3). Assessing impacts of information technology on project success through knowledge management practice. Automation in Construction, 22(SI), 182-191.
Yamashita, D. S., Armentano, V. A., & Laguna, M. (2006). Scatter search for project scheduling with resource availability cost. European Journal of Operational Research, 169(2), 623-637.
Zhang, H., Li, H., & Tam, C. (2006, 3). Permutation-based particle swarm optimization for resource-constrained project scheduling. Journal of Computing in Civil Engineering, 20(2), 141-149.
Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015, 12). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74-86.
Zhao, X., Hwang, B.-G., & Gao, Y. (2016, 3). A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects. Journal of Cleaner Production, 115, 203-213.
Zhu, G., Bard, J., & Yu, G. (2005, 4). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56(4), 365-381.
Ziarati, K., Akbari, R., & Zeighami, V. (2011). On the performance of bee algorithms for resource-constrained project scheduling problem. Applied Soft Computing, 11(4), 3720-3733.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: Journal of Project Management | Year: 2019 | Volume: 4 | Issue: 3 | Views: 2237 | Reviews: 0

Related Articles:
  • Integrated multi-resource planning and scheduling in engineering project
  • Developing a new method for modifying over-allocated multi-mode resource co ...
  • A study on the performance of differential search algorithm for single mode ...
  • Minimizing makespan of a resource-constrained scheduling problem: A hybrid ...
  • A new improved genetic algorithm approach and a competitive heuristic metho ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2025 GrowingScience.Com