How to cite this paper
Moghaddam, B. (2019). Mapping optimization techniques in project management.Journal of Project Management, 4(3), 217-228.
Refrences
Abdel-Hamid, T., Sengupta, K., & Swett, C. (1999, 12). The impact of goals on software project management: An experimental investigation. MIS Quaterly, 23(4), 531-555.
Agarwal, A., Colak, S., & Erenguc, S. (2011, 1). A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research, 38(1, SI), 44-50.
Ahsan, K., & Gunawan, I. (2010, 1). Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28(1), 68-78.
Alba, E., & Chicano, J. (2007, 6). Software project management with GAs. Information Sciences, 177(11), 2380-2401.
Alcaraz, J., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102(1-4), 83-109.
Alcaraz, J., Maroto, C., & Ruiz, R. (2003, 6). Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society, 54(6), 614-626.
Al-Fawzan, M., & Haouari, M. (2005, 5). A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics, 96(2), 175-187.
Artigues, C., Michelon, P., & Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research, 149(2), 249-267.
Arrow, K. J., Cropper, M. L., Gollier, C., Groom, B., Heal, G. M., Newell, R. G., ... & Sterner, T. (2014). Should governments use a declining discount rate in project analysis?. Review of Environmental Economics and Policy, 8(2), 145-163.
Baccarini, D., Salm, G., & Love, P. (2004). Management of risks in information technology projects. Industrial Management & Data Systems, 104(3-4), 286-295.
Ballestin, F. (2007, 6). When it is worthwhile to work with the stochastic RCPSP? Journal of Scheduling, 10(3), 153-166.
Barraza, G., Back, W., & Mata, F. (2004, 1). Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management-ASCE, 130(1), 25-32.
Bendoly, E., & Swink, M. (2007, 4). Moderating effects of information access on project management behavior, performance and perceptions. Journal of Operations Management, 25(3), 604-622.
Bonner, J., Ruekert, R., & Walker, O. (2002, 5). Upper management control of new product development projects and project performance. Journal of Product Innovation Management, 19(3), 233-245.
Bouleimen, K. L. E. I. N., & Lecocq, H. O. U. S. N. I. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149(2), 268-281.
Browning, T., & Yassine, A. (2010, 8). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212-228.
Brucker, P., Drexl, A., Mohring, R., Neumann, K., & Pesch, E. (1999, 1). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
Brucker, P., & Knust, S. (2003). Lower bounds for resource-constrained project scheduling problems. European Journal of Operational Research, 149(2), 302-313.
Cesta, A., Oddi, A., & Smith, S. F. (2002). A constraint-based method for project scheduling with time windows. Journal of Heuristics, 8(1), 109-136.
Chang, A. (2002, 1). Reasons for cost and schedule increase for engineering design projects. Journal of Management in Engineering, 18(1), 29-36.
Chang, C., Christensen, M., & Zhang, T. (2001). Genetic algorithms for project management. Annals of Software Engineering, 11, 107-139.
Chang, C., Jiang, H.-y., Di, Y., Zhu, D., & Ge, Y. (2008, 10). Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology, 50(11), 1142-1154.
Chen, J., & Askin, R. (2009, 2). Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research, 193(1), 23-34.
Chen, W., Shi, Y.-j., Teng, H.-f., Lan, X.-p., & Hu, L.-c. (2010, 3). An efficient hybrid algorithm for resource-constrained project scheduling. Information Sciences, 180(6, SI), 1031-1039.
Chen, W.-N., Zhang, J., Chung, H.-H., Huang, R.-Z., & Liu, O. (2010, 1). Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach. IEEE Transactions on Systems Man and Cybernetics Part C-Applicationa and Reviews, 40(1), 64-77.
Cho, S., & Eppinger, S. (2005, 8). A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management, 52(3), 316-328.
Coelho, J., & Vanhoucke, M. (2011). Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213(1), 73-82.
Choi, J., Realff, M., & Lee, J. (2004, 6). Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application. Computers & Chemical Engineering, 28(6-7), 1039-1058.
Chua, D., Tyagi, A., Ling, S., & Bok, S. (2003, 11). Process-parameter-interface model for design management. Journal of Construction Engineering and Management-ASCE, 129(6), 653-663.
Conigrave, K. M., Degenhardt, L. J., Whitfield, J. B., Saunders, J. B., Helander, A., & Tabakoff, B. (2002). CDT, GGT, and AST as markers of alcohol use: the WHO/ISBRA collaborative project. Alcoholism: Clinical and Experimental Research, 26(3), 332-339.
Debels, D., De Reyck, B., Leus, R., & Vanhoucke, M. (2006). A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research, 169(2), 638-653.
De Reyck, B., & Herroelen, W. (1999, 12). The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119(2), 538-556.
de Vonder, S., Demeulemeester, E., & Herroelen, W. (2007, 6). A classification of predictive-reactive project scheduling procedures. Journal of Scheduling, 10(3), 195-207.
de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005, 8). The use of buffers in project management: The trade-off between stability and makespan. International Journal of Production Economics, 97(2), 227-240.
Dorndorf, U., Pesch, E., & Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research, 52(3), 413-439.
Drezet, L. E., & Billaut, J. C. (2008). A project scheduling problem with labour constraints and time-dependent activities requirements. International Journal of Production Economics, 112(1), 217-225.
Elazouni, A., & Metwally, F. (2007, 1). Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management-ASCE, 133(1), 86-90.
Elloumi, S., & Fortemps, P. (2010). A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 205(1), 31-41.
Galloway, P. D. (2006). Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of construction engineering and management, 132(7), 697-711.
Georgy, M. (2008, 7). Evolutionary resource scheduler for linear projects. Automation in Construction, 17(5), 573-583.
Ghasemzadeh, F., Archer, N., & Iyogun, P. (1999, 7). A zero-one model for project portfolio selection and scheduling. Journal of the Operational Research Society, 50(7), 745-755.
Ghoddousi, P., Eshtehardian, E., Jooybanpour, S., & Javanmardi, A. (2013, 3). Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Automation in Construction, 30, 216-227.
Goncalves, J., Mendes, J., & Resende, M. (2008, 9). A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 189(3), 1171-1190.
Gutjahr, W., Strauss, C., & Wagner, E. (2000, 3). A stochastic branch-and-bound approach to activity crashing in project management. Informs Journal on Computing, 12(2), 125-135.
Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., & Denk, M. (2008). Competence-driven project portfolio selection, scheduling and staff assignment. Central European Journal of Operations Research, 16(3), 281-306.
Hartmann, S. (1998). A competitive genetic algorithm for resource‐constrained project scheduling. Naval Research Logistics (NRL), 45(7), 733-750.
Hartmann, S. (2001). Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research, 102, 111-135.
Hartmann, D., De Strooper, B., Serneels, L., Craessaerts, K., Herreman, A., Annaert, W., ... & Saftig, P. (2002). The disintegrin/metalloprotease ADAM 10 is essential for Notch signalling but not for α-secretase activity in fibroblasts. Human Molecular Genetics, 11(21), 2615-2624.
Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1-14.
Hegazy, T., & Ersahin, T. (2001, 11). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management-ASCE, 127(6), 469-475.
Heilmann, R. (2003, 1). A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research, 144(2), 348-365.
Heimerl, C., & Kolisch, R. (2010). Scheduling and staffing multiple projects with a multi-skilled workforce. OR Spectrum, 32(2), 343-368.
Herroelen, W. (2005, 3). Project scheduling - Theory and practice. Production and Operations Management, 14(4), 413-432.
Herroelen, W., & Leus, R. (2004, 4). Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42(8), 1599-1620.
Herroelen, W., & Leus, R. (2004, 8). The construction of stable project baseline schedules. European Journal of Operational Research, 156(3), 550-565.
Herroelen, W., & Leus, R. (2005, 9). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306.
Hoegl, M., Weinkauf, K., & Gemuenden, H. G. (2004). Interteam coordination, project commitment, and teamwork in multiteam R&D projects: A longitudinal study. Organization Science, 15(1), 38-55.
Hoegl, M., & Parboteeah, K. (2007, 3). Creativity in innovative projects: How teamwork matters. Journal of Engineering and Technology Management, 24(1-2), 148-166.
Hoegl, M., & Wagner, S. (2005, 8). Buyer-supplier collaboration in product development projects. Journal of Management, 31(4), 530-548.
Hoegl, M., Parboteeah, K., & Gemuenden, H. (2003, 12). When teamwork really matters: task innovativeness as a moderator of the teamwork-performance relationship in software development projects. Journal of Engineering and Technology Management, 20(4), 281-302.
Huchzermeier, A., & Loch, C. (2001, 1). Project management under risk: Using the real options approach to evaluate flexibility in R&D. Management Science, 47(1), 85-101.
Hwang, B.-G., Zhao, X., & Goh, K. (2014, 5). Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management, 32(4), 698-708.
Hyari, K., & El-Rayes, K. (2006, 1). Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering, 22(1), 11-19.
Ibbs, C., Wong, C., & Kwak, Y. (2001, 7). Project change management system. Journal of Management in Engineering, 17(3), 159-165.
Jarboui, B., Damak, N., Siarry, P., & Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation, 195(1), 299-308.
Jergeas, G., & Put, J. V. D. (2001). Benefits of constructability on construction projects. Journal of Construction Engineering and management, 127(4), 281-290.
Kaliba, C., Muya, M., & Mumba, K. (2009, 7). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531.
Karim, A., & Adeli, H. (1999, 9). CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management-ASCE, 125(5), 368-376.
Karniel, A., & Reich, Y. (2009, 11). From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues. IEEE Transactions on Engineering Management, 56(4), 636-649.
Kastor, A., & Sirakoulis, K. (2009, 7). The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem. International Journal of Project Management, 27(5), 493-500.
Ke, H., & Liu, B. (2005, 9). Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation, 168(1), 342-353.
Ke, H., & Liu, B. (2010, 2). Fuzzy project scheduling problem and its hybrid intelligent algorithm. Applied Mathematical Modelling, 34(2), 301-308.
Keil, M., Mann, J., & Rai, A. (2000, 12). Why software projects escalate: An empirical analysis and test of four theoretical models. MIS Quaterly, 24(4), 631-664.
Keller, R. (2001, 6). Cross-functional project groups in research and new product development: Diversity, communications, job stress, and outcomes. Academy of Management Journal, 44(3), 547-555.
Keller, R. (2006, 1). Transformational leadership, initiating structure, and substitutes for leadership: A longitudinal study of research and development project team performance. Journal of Applied Psychology, 91(1), 202-210.
Klein, R. (2000, 12). Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects. European Journal of Operational Research, 127(3), 619-638.
Klein, R., & Scholl, A. (1999, 1). Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling. European Journal of Operational Research, 112(2), 322-346.
Kolisch, R., & Padman, R. (2001, 6). An integrated survey of deterministic project scheduling. OMEGA-International Journal of Management Science, 29(3), 249-272.
Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23-37.
Kone, O., Artigues, C., Lopez, P., & Mongeau, M. (2011, 1). Event-based MILP models for resource-constrained project scheduling problems. Computers & Operations Research, 38(1, SI), 3-13.
Koulinas, G., & Anagnostopoulos, K. (2013, 5). A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Automation in Construction, 31, 169-175.
Kuo, S., Merkley, G., & Liu, C. (2000, 8). Decision support for irrigation project planning using a genetic algorithm. Agricultural Water Management, 45(3), 243-266.
Lambrechts, O., Demeulemeester, E., & Herroelen, W. (2011, 6). Time slack-based techniques for robust project scheduling subject to resource uncertainty. Annals of Operations Research, 186(1), 443-464.
Lee, E., Park, Y., & Shin, J. (2009, 4). Large engineering project risk management using a Bayesian belief network. Expert Systems with Application, 36(3), 5880-5887.
Levardy, V., & Browning, T. (2009, 11). An Adaptive Process Model to Support Product Development Project Management. IEEE Transactions on Engineering Management, 56(4), 600-620.
Liberatore, M., Pollack-Johnson, B., & Smith, C. (2001, 3). Project management in construction: Software use and research directions. Journal of Construction Engineering and Management-ASCE, 127(2), 101-107.
Linberg, K. (1999, 12). Software developer perceptions about software project failure: a case study. Journal of Systems and Software, 49(2-3), 177-192.
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009, 5). Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4), 400-407.
Liu, S.-S., & Wang, C.-J. (2008, 11). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17(8), 966-974.
Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research, 102, 263-286.
Love, P. (2002, 1). Influence of project type and costs in building procurement method on rework construction projects. Journal of Construction Engineering and Management-ASCE, 128(1), 18-29.
Love, P., Edwards, D., & Irani, Z. (2008, 5). Forensic project management: An exploratory examination of the causal behavior of design-induced rework. IEEE Transactions on Engineering Management, 55(2), 234-247.
Love, P., Edwards, D., & Irani, Z. (2012, 11). Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns. IEEE Transactions on Engineering Management, 59(4), 560-571.
Love, P., Edwards, D., Smith, J., & Walker, D. (2009, 11). Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects. Journal of Performance of Constructed Facilities, 23(6), 480-488.
Love, P., Liu, J., Matthews, J., Sing, C.-P., & Smith, J. (2015, 8). Future proofing PPPs: Life-cycle performance measurement and Building Information Modelling. Automation in Construction, 56, 26-35.
Luu, V., Kim, S.-Y., Tuan, N., & Ogunlana, S. (2009, 1). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39-50.
Lyneis, J., Cooper, K., & Els, S. (2001, 3). Strategic management of complex projects: a case study using system dynamics. System Dynamics Review, 17(3), 237-260.
Ma, Z., Shen, Q., & Zhang, J. (2005, 6). Application of 4D for dynamic site layout and management of construction projects. Automation in Construction, 14(3, SI), 369-381.
McKoy, J. M., Angelotta, C., Bennett, C. L., Tallman, M. S., Wadleigh, M., Evens, A. M., ... & DeAngelo, D. J. (2007). Gemtuzumab ozogamicin-associated sinusoidal obstructive syndrome (SOS): an overview from the research on adverse drug events and reports (RADAR) project. Leukemia Research, 31(5), 599-604.
Mendes, J., Goncalves, J., & Resende, M. (2009, 1). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1, SI), 92-109.
Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE transactions on evolutionary computation, 6(4), 333-346.
Mika, M., Waligora, G., & Weglarz, J. (2005, 8). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research, 164(3), 639-668.
Mohring, R., Schulz, A., Stork, F., & Uetz, M. (2003, 3). Solving project scheduling problems by minimum cut computations. Management Science, 49(3), 330-350.
Na, K.-S., Simpson, J., Li, X., & Singh Tushar and Kim, K.-Y. (2007, 4). Software development risk and project performance measurement: Evidence in Korea. Journal of Systems and Software, 80(4, SI), 596-605.
Neumann, K., & Zimmermann, J. (1999, 9). Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research, 117(3), 591-605.
Neumann, K., & Zimmermann, J. (2000, 12). Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127(2), 425-443.
Nightingale, P. (2000, 8). The product-process-organisation relationship in complex development projects. Research Policy, 29(7-8), 913-930.
Nitithamyong, P., & Skibniewski, M. (2006, 1). Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), 80-87.
Palpant, M., Artigues, C., & Michelon, P. (2004). LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research, 131(1-4), 237-257.
Park, M., & Pena-Mora, F. (2003, 3). Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review, 19(3), 213-242.
Pena-Mora, F., & Park, M. (2001, 11). Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management-ASCE, 127(6), 445-456.
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., & Mikalauskas, S. (2010, 5). The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Automation in Construction, 19(3, SI), 357-367.
Ropponen, J., & Lyytinen, K. (2000). Components of software development risk: How to address them? A project manager survey. IEEE Transactions on Software Engineering, 26(2), 98-112.
Pulley, J. M., Denny, J. C., Peterson, J. F., Bernard, G. R., Vnencak‐Jones, C. L., Ramirez, A. H., ... & Crawford, D. C. (2012). Operational implementation of prospective genotyping for personalized medicine: the design of the Vanderbilt PREDICT project. Clinical Pharmacology & Therapeutics, 92(1), 87-95.
Schwindt, C. (2006). Resource allocation in project management. Springer Science & Business Me-dia. Scott-Young, C., & Samson, D. (2008, 11). Project success and project team management: Evidence from capital projects in the process industries. Journal of Operations Management, 26(6), 749-766.
Senouci, A., & Adeli, H. (2001, 1). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Smith, H., & Keil, M. (2003, 1). The reluctance to report bad news on troubled software projects: a theoretical model. Information Systems Journal, 13(1), 69-95.
Sobel, M., Szmerekovsky, J., & Tilson, V. (2009, 11). Scheduling projects with stochastic activity duration to maximize expected net present value. European Journal of Operational Research, 198(3), 697-705.
Tavares, L. V. (2002). A review of the contribution of operational research to project management. European Journal of Operational Research, 136(1), 1-18.
Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for Resource-Constrained Project Scheduling. Annals of Operations Research, 102, 65-81.
Ulusoy, G., & Cebelli, S. (2000, 12). An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research, 127(2), 262-278.
Valls, V., Ballestin, F., & Quintanilla, S. (2008, 3). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185(2), 495-508.
Valls, V., Perez, A., & Quintanilla, S. (2009, 3). Skilled workforce scheduling in Service Centres. European Journal of Operational Research, 193(3), 791-804.
Van De Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2006, 1). The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research, 44(2), 215-236.
Vanhoucke, M., & Vandevoorde, S. (2007, 10). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361-1374.
Vanhoucke, M., Demeulemeester, E., & Herroelen, W. (2001, 8). On maximizing the net present value of a project under renewable resource constraints. Management Science, 47(8), 1113-1121.
Viana, A., & de Sousa, J. P. (2000). Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research, 120(2), 359-374.
Wang, H., Zhang, J., Chau, K., & Anson, M. (2004, 9). 4D dynamic management for construction planning and resource utilization. Automation in Construction, 13(5), 575-589.
Wang, J., & Lin, Y.-I. (2009, 9). An overlapping process model to assess schedule risk for new product development. Computers & Industrial Engineering, 57(2, SI), 460-474.
Wang, M., & Chou, H. (2003, 4). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60-68.
Wang, W.-C., Weng, S.-W., Wang, S.-H., & Chen, C.-Y. (2014, 1). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80.
Węglarz, J., Józefowska, J., Mika, M., & Waligóra, G. (2011). Project scheduling with finite or infinite number of activity processing modes–A survey. European Journal of Operational Research, 208(3), 177-205.
Yang, L.-R., Chen, J.-H., & Wang, H.-W. (2012, 3). Assessing impacts of information technology on project success through knowledge management practice. Automation in Construction, 22(SI), 182-191.
Yamashita, D. S., Armentano, V. A., & Laguna, M. (2006). Scatter search for project scheduling with resource availability cost. European Journal of Operational Research, 169(2), 623-637.
Zhang, H., Li, H., & Tam, C. (2006, 3). Permutation-based particle swarm optimization for resource-constrained project scheduling. Journal of Computing in Civil Engineering, 20(2), 141-149.
Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015, 12). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74-86.
Zhao, X., Hwang, B.-G., & Gao, Y. (2016, 3). A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects. Journal of Cleaner Production, 115, 203-213.
Zhu, G., Bard, J., & Yu, G. (2005, 4). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56(4), 365-381.
Ziarati, K., Akbari, R., & Zeighami, V. (2011). On the performance of bee algorithms for resource-constrained project scheduling problem. Applied Soft Computing, 11(4), 3720-3733.
Agarwal, A., Colak, S., & Erenguc, S. (2011, 1). A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research, 38(1, SI), 44-50.
Ahsan, K., & Gunawan, I. (2010, 1). Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28(1), 68-78.
Alba, E., & Chicano, J. (2007, 6). Software project management with GAs. Information Sciences, 177(11), 2380-2401.
Alcaraz, J., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102(1-4), 83-109.
Alcaraz, J., Maroto, C., & Ruiz, R. (2003, 6). Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society, 54(6), 614-626.
Al-Fawzan, M., & Haouari, M. (2005, 5). A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics, 96(2), 175-187.
Artigues, C., Michelon, P., & Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research, 149(2), 249-267.
Arrow, K. J., Cropper, M. L., Gollier, C., Groom, B., Heal, G. M., Newell, R. G., ... & Sterner, T. (2014). Should governments use a declining discount rate in project analysis?. Review of Environmental Economics and Policy, 8(2), 145-163.
Baccarini, D., Salm, G., & Love, P. (2004). Management of risks in information technology projects. Industrial Management & Data Systems, 104(3-4), 286-295.
Ballestin, F. (2007, 6). When it is worthwhile to work with the stochastic RCPSP? Journal of Scheduling, 10(3), 153-166.
Barraza, G., Back, W., & Mata, F. (2004, 1). Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management-ASCE, 130(1), 25-32.
Bendoly, E., & Swink, M. (2007, 4). Moderating effects of information access on project management behavior, performance and perceptions. Journal of Operations Management, 25(3), 604-622.
Bonner, J., Ruekert, R., & Walker, O. (2002, 5). Upper management control of new product development projects and project performance. Journal of Product Innovation Management, 19(3), 233-245.
Bouleimen, K. L. E. I. N., & Lecocq, H. O. U. S. N. I. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149(2), 268-281.
Browning, T., & Yassine, A. (2010, 8). Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics, 126(2), 212-228.
Brucker, P., Drexl, A., Mohring, R., Neumann, K., & Pesch, E. (1999, 1). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
Brucker, P., & Knust, S. (2003). Lower bounds for resource-constrained project scheduling problems. European Journal of Operational Research, 149(2), 302-313.
Cesta, A., Oddi, A., & Smith, S. F. (2002). A constraint-based method for project scheduling with time windows. Journal of Heuristics, 8(1), 109-136.
Chang, A. (2002, 1). Reasons for cost and schedule increase for engineering design projects. Journal of Management in Engineering, 18(1), 29-36.
Chang, C., Christensen, M., & Zhang, T. (2001). Genetic algorithms for project management. Annals of Software Engineering, 11, 107-139.
Chang, C., Jiang, H.-y., Di, Y., Zhu, D., & Ge, Y. (2008, 10). Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology, 50(11), 1142-1154.
Chen, J., & Askin, R. (2009, 2). Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research, 193(1), 23-34.
Chen, W., Shi, Y.-j., Teng, H.-f., Lan, X.-p., & Hu, L.-c. (2010, 3). An efficient hybrid algorithm for resource-constrained project scheduling. Information Sciences, 180(6, SI), 1031-1039.
Chen, W.-N., Zhang, J., Chung, H.-H., Huang, R.-Z., & Liu, O. (2010, 1). Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach. IEEE Transactions on Systems Man and Cybernetics Part C-Applicationa and Reviews, 40(1), 64-77.
Cho, S., & Eppinger, S. (2005, 8). A simulation-based process model for managing complex design projects. IEEE Transactions on Engineering Management, 52(3), 316-328.
Coelho, J., & Vanhoucke, M. (2011). Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research, 213(1), 73-82.
Choi, J., Realff, M., & Lee, J. (2004, 6). Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application. Computers & Chemical Engineering, 28(6-7), 1039-1058.
Chua, D., Tyagi, A., Ling, S., & Bok, S. (2003, 11). Process-parameter-interface model for design management. Journal of Construction Engineering and Management-ASCE, 129(6), 653-663.
Conigrave, K. M., Degenhardt, L. J., Whitfield, J. B., Saunders, J. B., Helander, A., & Tabakoff, B. (2002). CDT, GGT, and AST as markers of alcohol use: the WHO/ISBRA collaborative project. Alcoholism: Clinical and Experimental Research, 26(3), 332-339.
Debels, D., De Reyck, B., Leus, R., & Vanhoucke, M. (2006). A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research, 169(2), 638-653.
De Reyck, B., & Herroelen, W. (1999, 12). The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119(2), 538-556.
de Vonder, S., Demeulemeester, E., & Herroelen, W. (2007, 6). A classification of predictive-reactive project scheduling procedures. Journal of Scheduling, 10(3), 195-207.
de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005, 8). The use of buffers in project management: The trade-off between stability and makespan. International Journal of Production Economics, 97(2), 227-240.
Dorndorf, U., Pesch, E., & Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of Operations Research, 52(3), 413-439.
Drezet, L. E., & Billaut, J. C. (2008). A project scheduling problem with labour constraints and time-dependent activities requirements. International Journal of Production Economics, 112(1), 217-225.
Elazouni, A., & Metwally, F. (2007, 1). Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management-ASCE, 133(1), 86-90.
Elloumi, S., & Fortemps, P. (2010). A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 205(1), 31-41.
Galloway, P. D. (2006). Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of construction engineering and management, 132(7), 697-711.
Georgy, M. (2008, 7). Evolutionary resource scheduler for linear projects. Automation in Construction, 17(5), 573-583.
Ghasemzadeh, F., Archer, N., & Iyogun, P. (1999, 7). A zero-one model for project portfolio selection and scheduling. Journal of the Operational Research Society, 50(7), 745-755.
Ghoddousi, P., Eshtehardian, E., Jooybanpour, S., & Javanmardi, A. (2013, 3). Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm. Automation in Construction, 30, 216-227.
Goncalves, J., Mendes, J., & Resende, M. (2008, 9). A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research, 189(3), 1171-1190.
Gutjahr, W., Strauss, C., & Wagner, E. (2000, 3). A stochastic branch-and-bound approach to activity crashing in project management. Informs Journal on Computing, 12(2), 125-135.
Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., & Denk, M. (2008). Competence-driven project portfolio selection, scheduling and staff assignment. Central European Journal of Operations Research, 16(3), 281-306.
Hartmann, S. (1998). A competitive genetic algorithm for resource‐constrained project scheduling. Naval Research Logistics (NRL), 45(7), 733-750.
Hartmann, S. (2001). Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research, 102, 111-135.
Hartmann, D., De Strooper, B., Serneels, L., Craessaerts, K., Herreman, A., Annaert, W., ... & Saftig, P. (2002). The disintegrin/metalloprotease ADAM 10 is essential for Notch signalling but not for α-secretase activity in fibroblasts. Human Molecular Genetics, 11(21), 2615-2624.
Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1-14.
Hegazy, T., & Ersahin, T. (2001, 11). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management-ASCE, 127(6), 469-475.
Heilmann, R. (2003, 1). A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research, 144(2), 348-365.
Heimerl, C., & Kolisch, R. (2010). Scheduling and staffing multiple projects with a multi-skilled workforce. OR Spectrum, 32(2), 343-368.
Herroelen, W. (2005, 3). Project scheduling - Theory and practice. Production and Operations Management, 14(4), 413-432.
Herroelen, W., & Leus, R. (2004, 4). Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42(8), 1599-1620.
Herroelen, W., & Leus, R. (2004, 8). The construction of stable project baseline schedules. European Journal of Operational Research, 156(3), 550-565.
Herroelen, W., & Leus, R. (2005, 9). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306.
Hoegl, M., Weinkauf, K., & Gemuenden, H. G. (2004). Interteam coordination, project commitment, and teamwork in multiteam R&D projects: A longitudinal study. Organization Science, 15(1), 38-55.
Hoegl, M., & Parboteeah, K. (2007, 3). Creativity in innovative projects: How teamwork matters. Journal of Engineering and Technology Management, 24(1-2), 148-166.
Hoegl, M., & Wagner, S. (2005, 8). Buyer-supplier collaboration in product development projects. Journal of Management, 31(4), 530-548.
Hoegl, M., Parboteeah, K., & Gemuenden, H. (2003, 12). When teamwork really matters: task innovativeness as a moderator of the teamwork-performance relationship in software development projects. Journal of Engineering and Technology Management, 20(4), 281-302.
Huchzermeier, A., & Loch, C. (2001, 1). Project management under risk: Using the real options approach to evaluate flexibility in R&D. Management Science, 47(1), 85-101.
Hwang, B.-G., Zhao, X., & Goh, K. (2014, 5). Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management, 32(4), 698-708.
Hyari, K., & El-Rayes, K. (2006, 1). Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering, 22(1), 11-19.
Ibbs, C., Wong, C., & Kwak, Y. (2001, 7). Project change management system. Journal of Management in Engineering, 17(3), 159-165.
Jarboui, B., Damak, N., Siarry, P., & Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation, 195(1), 299-308.
Jergeas, G., & Put, J. V. D. (2001). Benefits of constructability on construction projects. Journal of Construction Engineering and management, 127(4), 281-290.
Kaliba, C., Muya, M., & Mumba, K. (2009, 7). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531.
Karim, A., & Adeli, H. (1999, 9). CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management-ASCE, 125(5), 368-376.
Karniel, A., & Reich, Y. (2009, 11). From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues. IEEE Transactions on Engineering Management, 56(4), 636-649.
Kastor, A., & Sirakoulis, K. (2009, 7). The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem. International Journal of Project Management, 27(5), 493-500.
Ke, H., & Liu, B. (2005, 9). Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation, 168(1), 342-353.
Ke, H., & Liu, B. (2010, 2). Fuzzy project scheduling problem and its hybrid intelligent algorithm. Applied Mathematical Modelling, 34(2), 301-308.
Keil, M., Mann, J., & Rai, A. (2000, 12). Why software projects escalate: An empirical analysis and test of four theoretical models. MIS Quaterly, 24(4), 631-664.
Keller, R. (2001, 6). Cross-functional project groups in research and new product development: Diversity, communications, job stress, and outcomes. Academy of Management Journal, 44(3), 547-555.
Keller, R. (2006, 1). Transformational leadership, initiating structure, and substitutes for leadership: A longitudinal study of research and development project team performance. Journal of Applied Psychology, 91(1), 202-210.
Klein, R. (2000, 12). Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects. European Journal of Operational Research, 127(3), 619-638.
Klein, R., & Scholl, A. (1999, 1). Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling. European Journal of Operational Research, 112(2), 322-346.
Kolisch, R., & Padman, R. (2001, 6). An integrated survey of deterministic project scheduling. OMEGA-International Journal of Management Science, 29(3), 249-272.
Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174(1), 23-37.
Kone, O., Artigues, C., Lopez, P., & Mongeau, M. (2011, 1). Event-based MILP models for resource-constrained project scheduling problems. Computers & Operations Research, 38(1, SI), 3-13.
Koulinas, G., & Anagnostopoulos, K. (2013, 5). A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Automation in Construction, 31, 169-175.
Kuo, S., Merkley, G., & Liu, C. (2000, 8). Decision support for irrigation project planning using a genetic algorithm. Agricultural Water Management, 45(3), 243-266.
Lambrechts, O., Demeulemeester, E., & Herroelen, W. (2011, 6). Time slack-based techniques for robust project scheduling subject to resource uncertainty. Annals of Operations Research, 186(1), 443-464.
Lee, E., Park, Y., & Shin, J. (2009, 4). Large engineering project risk management using a Bayesian belief network. Expert Systems with Application, 36(3), 5880-5887.
Levardy, V., & Browning, T. (2009, 11). An Adaptive Process Model to Support Product Development Project Management. IEEE Transactions on Engineering Management, 56(4), 600-620.
Liberatore, M., Pollack-Johnson, B., & Smith, C. (2001, 3). Project management in construction: Software use and research directions. Journal of Construction Engineering and Management-ASCE, 127(2), 101-107.
Linberg, K. (1999, 12). Software developer perceptions about software project failure: a case study. Journal of Systems and Software, 49(2-3), 177-192.
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009, 5). Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4), 400-407.
Liu, S.-S., & Wang, C.-J. (2008, 11). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17(8), 966-974.
Lova, A., & Tormos, P. (2001). Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research, 102, 263-286.
Love, P. (2002, 1). Influence of project type and costs in building procurement method on rework construction projects. Journal of Construction Engineering and Management-ASCE, 128(1), 18-29.
Love, P., Edwards, D., & Irani, Z. (2008, 5). Forensic project management: An exploratory examination of the causal behavior of design-induced rework. IEEE Transactions on Engineering Management, 55(2), 234-247.
Love, P., Edwards, D., & Irani, Z. (2012, 11). Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns. IEEE Transactions on Engineering Management, 59(4), 560-571.
Love, P., Edwards, D., Smith, J., & Walker, D. (2009, 11). Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects. Journal of Performance of Constructed Facilities, 23(6), 480-488.
Love, P., Liu, J., Matthews, J., Sing, C.-P., & Smith, J. (2015, 8). Future proofing PPPs: Life-cycle performance measurement and Building Information Modelling. Automation in Construction, 56, 26-35.
Luu, V., Kim, S.-Y., Tuan, N., & Ogunlana, S. (2009, 1). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39-50.
Lyneis, J., Cooper, K., & Els, S. (2001, 3). Strategic management of complex projects: a case study using system dynamics. System Dynamics Review, 17(3), 237-260.
Ma, Z., Shen, Q., & Zhang, J. (2005, 6). Application of 4D for dynamic site layout and management of construction projects. Automation in Construction, 14(3, SI), 369-381.
McKoy, J. M., Angelotta, C., Bennett, C. L., Tallman, M. S., Wadleigh, M., Evens, A. M., ... & DeAngelo, D. J. (2007). Gemtuzumab ozogamicin-associated sinusoidal obstructive syndrome (SOS): an overview from the research on adverse drug events and reports (RADAR) project. Leukemia Research, 31(5), 599-604.
Mendes, J., Goncalves, J., & Resende, M. (2009, 1). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & Operations Research, 36(1, SI), 92-109.
Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE transactions on evolutionary computation, 6(4), 333-346.
Mika, M., Waligora, G., & Weglarz, J. (2005, 8). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research, 164(3), 639-668.
Mohring, R., Schulz, A., Stork, F., & Uetz, M. (2003, 3). Solving project scheduling problems by minimum cut computations. Management Science, 49(3), 330-350.
Na, K.-S., Simpson, J., Li, X., & Singh Tushar and Kim, K.-Y. (2007, 4). Software development risk and project performance measurement: Evidence in Korea. Journal of Systems and Software, 80(4, SI), 596-605.
Neumann, K., & Zimmermann, J. (1999, 9). Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research, 117(3), 591-605.
Neumann, K., & Zimmermann, J. (2000, 12). Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127(2), 425-443.
Nightingale, P. (2000, 8). The product-process-organisation relationship in complex development projects. Research Policy, 29(7-8), 913-930.
Nitithamyong, P., & Skibniewski, M. (2006, 1). Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), 80-87.
Palpant, M., Artigues, C., & Michelon, P. (2004). LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research, 131(1-4), 237-257.
Park, M., & Pena-Mora, F. (2003, 3). Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review, 19(3), 213-242.
Pena-Mora, F., & Park, M. (2001, 11). Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management-ASCE, 127(6), 445-456.
Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., & Mikalauskas, S. (2010, 5). The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Automation in Construction, 19(3, SI), 357-367.
Ropponen, J., & Lyytinen, K. (2000). Components of software development risk: How to address them? A project manager survey. IEEE Transactions on Software Engineering, 26(2), 98-112.
Pulley, J. M., Denny, J. C., Peterson, J. F., Bernard, G. R., Vnencak‐Jones, C. L., Ramirez, A. H., ... & Crawford, D. C. (2012). Operational implementation of prospective genotyping for personalized medicine: the design of the Vanderbilt PREDICT project. Clinical Pharmacology & Therapeutics, 92(1), 87-95.
Schwindt, C. (2006). Resource allocation in project management. Springer Science & Business Me-dia. Scott-Young, C., & Samson, D. (2008, 11). Project success and project team management: Evidence from capital projects in the process industries. Journal of Operations Management, 26(6), 749-766.
Senouci, A., & Adeli, H. (2001, 1). Resource scheduling using neural dynamics model of Adeli and Park. Journal of Construction Engineering and Management, 127(1), 28-34.
Smith, H., & Keil, M. (2003, 1). The reluctance to report bad news on troubled software projects: a theoretical model. Information Systems Journal, 13(1), 69-95.
Sobel, M., Szmerekovsky, J., & Tilson, V. (2009, 11). Scheduling projects with stochastic activity duration to maximize expected net present value. European Journal of Operational Research, 198(3), 697-705.
Tavares, L. V. (2002). A review of the contribution of operational research to project management. European Journal of Operational Research, 136(1), 1-18.
Tormos, P., & Lova, A. (2001). A competitive heuristic solution technique for Resource-Constrained Project Scheduling. Annals of Operations Research, 102, 65-81.
Ulusoy, G., & Cebelli, S. (2000, 12). An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research, 127(2), 262-278.
Valls, V., Ballestin, F., & Quintanilla, S. (2008, 3). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185(2), 495-508.
Valls, V., Perez, A., & Quintanilla, S. (2009, 3). Skilled workforce scheduling in Service Centres. European Journal of Operational Research, 193(3), 791-804.
Van De Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2006, 1). The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research, 44(2), 215-236.
Vanhoucke, M., & Vandevoorde, S. (2007, 10). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361-1374.
Vanhoucke, M., Demeulemeester, E., & Herroelen, W. (2001, 8). On maximizing the net present value of a project under renewable resource constraints. Management Science, 47(8), 1113-1121.
Viana, A., & de Sousa, J. P. (2000). Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research, 120(2), 359-374.
Wang, H., Zhang, J., Chau, K., & Anson, M. (2004, 9). 4D dynamic management for construction planning and resource utilization. Automation in Construction, 13(5), 575-589.
Wang, J., & Lin, Y.-I. (2009, 9). An overlapping process model to assess schedule risk for new product development. Computers & Industrial Engineering, 57(2, SI), 460-474.
Wang, M., & Chou, H. (2003, 4). Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19(2), 60-68.
Wang, W.-C., Weng, S.-W., Wang, S.-H., & Chen, C.-Y. (2014, 1). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80.
Węglarz, J., Józefowska, J., Mika, M., & Waligóra, G. (2011). Project scheduling with finite or infinite number of activity processing modes–A survey. European Journal of Operational Research, 208(3), 177-205.
Yang, L.-R., Chen, J.-H., & Wang, H.-W. (2012, 3). Assessing impacts of information technology on project success through knowledge management practice. Automation in Construction, 22(SI), 182-191.
Yamashita, D. S., Armentano, V. A., & Laguna, M. (2006). Scatter search for project scheduling with resource availability cost. European Journal of Operational Research, 169(2), 623-637.
Zhang, H., Li, H., & Tam, C. (2006, 3). Permutation-based particle swarm optimization for resource-constrained project scheduling. Journal of Computing in Civil Engineering, 20(2), 141-149.
Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015, 12). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74-86.
Zhao, X., Hwang, B.-G., & Gao, Y. (2016, 3). A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects. Journal of Cleaner Production, 115, 203-213.
Zhu, G., Bard, J., & Yu, G. (2005, 4). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56(4), 365-381.
Ziarati, K., Akbari, R., & Zeighami, V. (2011). On the performance of bee algorithms for resource-constrained project scheduling problem. Applied Soft Computing, 11(4), 3720-3733.