How to cite this paper
Ghaeli, M. (2019). A dynamic programming approach for resource allocation in oil and gas industry.Journal of Project Management, 4(3), 213-216.
Refrences
Chan, T., Nickerson, J. A., & Owan, H. (2007). Strategic management of R&D pipelines with co-specialized investments and technology markets. Management Science, 53(4), 667-682.
Drexl, A. (1991). Scheduling of project networks by job assignment. Management Science, 37(12), 1590-1602.
e Silva, L. C., & Costa, A. P. C. S. (2013). Decision model for allocating human resources in in-formation system projects. International Journal of Project Management, 31(1), 100-108.
Lainati, A., & Arena, M. (2010). Project management models for long product rolling mills. In Proc., AISTech Iron and Steel Technology Conf., SM Mills, ed., Association for Iron and Steel Technology, Warrendale, PA (pp. 661-668).
Pang, C. K., & Le, C. V. (2014). Optimization of total energy consumption in flexible manufactur-ing systems using weighted p-timed Petri nets and dynamic programming. IEEE Transactions on Automation Science and Engineering, 11(4), 1083-1096.
Qi, J. X., Wang, Q., & Guo, X. Z. (2007, August). Improved particle swarm optimization for re-source leveling problem. In 2007 International Conference on Machine Learning and Cybernet-ics (Vol. 2, pp. 896-901). IEEE.
Robinson, D. R. (1975). A dynamic programming solution to cost-time tradeoff for CPM. Management Science, 22(2), 158-166.
Ruzhi, X., Leqiu, Q., & Xinhai, J. (2003, October). CMM-based software risk control optimiza-tion. In Proceedings Fifth IEEE Workshop on Mobile Computing Systems and Applications(pp. 499-503). IEEE.
Sitek, P., & Wikarek, J. (2016, September). A constraint-based approach to modeling and solving resource-constrained scheduling problems. In International Conference on Computational Col-lective Intelligence (pp. 423-433). Springer, Cham.
Wang, X. M., Chen, Q. X., Mao, N., & Liu, J. J. (2012). Mould projects due-date forecast meth-ods under random environment. Computer Integrated Manufacturing Systems, 18(2), 405-414.
Yeh, D. H., & Kao, H. H. (2008). A CPM-Based Bidirectional Approach for Type-I Assembly Line Balancing Problem. Journal of the Chinese Institute of Industrial Engineers, 25(6), 481-487.
Drexl, A. (1991). Scheduling of project networks by job assignment. Management Science, 37(12), 1590-1602.
e Silva, L. C., & Costa, A. P. C. S. (2013). Decision model for allocating human resources in in-formation system projects. International Journal of Project Management, 31(1), 100-108.
Lainati, A., & Arena, M. (2010). Project management models for long product rolling mills. In Proc., AISTech Iron and Steel Technology Conf., SM Mills, ed., Association for Iron and Steel Technology, Warrendale, PA (pp. 661-668).
Pang, C. K., & Le, C. V. (2014). Optimization of total energy consumption in flexible manufactur-ing systems using weighted p-timed Petri nets and dynamic programming. IEEE Transactions on Automation Science and Engineering, 11(4), 1083-1096.
Qi, J. X., Wang, Q., & Guo, X. Z. (2007, August). Improved particle swarm optimization for re-source leveling problem. In 2007 International Conference on Machine Learning and Cybernet-ics (Vol. 2, pp. 896-901). IEEE.
Robinson, D. R. (1975). A dynamic programming solution to cost-time tradeoff for CPM. Management Science, 22(2), 158-166.
Ruzhi, X., Leqiu, Q., & Xinhai, J. (2003, October). CMM-based software risk control optimiza-tion. In Proceedings Fifth IEEE Workshop on Mobile Computing Systems and Applications(pp. 499-503). IEEE.
Sitek, P., & Wikarek, J. (2016, September). A constraint-based approach to modeling and solving resource-constrained scheduling problems. In International Conference on Computational Col-lective Intelligence (pp. 423-433). Springer, Cham.
Wang, X. M., Chen, Q. X., Mao, N., & Liu, J. J. (2012). Mould projects due-date forecast meth-ods under random environment. Computer Integrated Manufacturing Systems, 18(2), 405-414.
Yeh, D. H., & Kao, H. H. (2008). A CPM-Based Bidirectional Approach for Type-I Assembly Line Balancing Problem. Journal of the Chinese Institute of Industrial Engineers, 25(6), 481-487.