Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » CONWIP card setting in a flow-shop system with a batch production machine

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 2 Issue 1 pp. 1-18, 2011

CONWIP card setting in a flow-shop system with a batch production machine Pages 1-18 PDF Download PDF

Authors: Marcello Braglia, Marco Frosolini, Roberto Gabbrielli, Francesco Zammori Zammori

📋 Author Affiliations:
Marcello Braglia1, Marco Frosolini ORCID 2, Roberto Gabbrielli ORCID 1, Francesco Zammori ORCID 1
1 Dipartimento di Ingegneria Meccanica, Nucleare e della Produzione, Università di Pisa, Pisa, 56126, via Bonanno Pisano 25/b, Italy
2 Dipartimento di Energetica, Università di Pisa, Pisa, 56126, Largo L. Lazzarino, 1, Italy
doi 10.5267/j.ijiec.2010.07.004
18 Source: Scopus
Crossref 8 Source: CrossRef

🔑 Keywords: CONWIP, pull systems, flow-shop system, batch production, card setting

Abstract: This paper presents an analytical technique to determine the optimum number of cards to control material release in a CONWIP system. The work focuses on the card setting problem for a flow-shop system characterised by the presence of a batch processing machine (e.g. a kiln for long heat treatment). To control production, two different static approaches are developed: the first one is used when the bottleneck coincides with the batch processing machine and the second one is proposed when the bottleneck is another machine of the flow shop. In both contexts, by means of the appropriate model, one can optimize the performance of the flow-shop by maximizing the throughput and keeping the work in process at a minimum level. Numerical examples are also included in the paper to confirm the validity of the models and to demonstrate their practical utility.

How to cite this paper
APA: Braglia, M., Frosolini, M., Gabbrielli, R & Zammori, F. (2011). CONWIP card setting in a flow-shop system with a batch production machine. International Journal of Industrial Engineering Computations, 2(1), 1-18.
Chicago/Turabian: Braglia, M., Frosolini, M., Gabbrielli, R & Zammori, F. 2011. "CONWIP card setting in a flow-shop system with a batch production machine." International Journal of Industrial Engineering Computations 2, no. 1 (2011): 1-18.
AMA: Braglia, M., Frosolini, M., Gabbrielli, R & Zammori, F. CONWIP card setting in a flow-shop system with a batch production machine. International Journal of Industrial Engineering Computations. 2011;2(1):1-18.

References
Al-Tahat, M. D., & Rawabdeh, I. A. (2008). Stochastic analysis and design of CONWIP controlled production systems. Journal of Manufacturing Technology Management, 19, 253-273.

Bonvik, A. M., Couch, C.E., & Gershwin., S.B. (1997). A comparison of production-line control mechanisms. International Journal of Production Research, 25, 789-804.

Cao, D., & Chen, M. (2005). A mixed integer programming model for a two line CONWIP-based production and assembly system. International Journal of Production Economics, 95, 317–326.

Chang, T.M., & Yih, Y. (1994). Generic Kanban systems for dynamic environments. International Journal of Production Research, 32, 889-902.

Duenyas, I. (1994). Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32, 1403-1419.

Duri, C., Frein, Y., & Lee, H.-S. (2000). Performance evaluation and design of a CONWIP system with inspections. International Journal of Production Economics, 64, 219-229.

Framinan, J. M., Ruiz-Usano, R., & Leisten, R. (2001). Sequencing CONWIP flow-shops: analysis and heuristics. International Journal of Production Research, 39, 2735-2749.

Framinan, J.M., Gonzàlez, P.L., & Ruiz-Usano, R. (2003). The CONWIP production control system: review and research issues. Production Planning & Control, 14, 255-265.

Framinan, J.M., Gonzàlez, P.L., & Ruiz-Usano, R. (2006). Dynamic card controlling in a Conwip system. International Journal of Production Economics, 99, 102-116.

Fowler, J.W., Brown, S., Gold, H., & Schoemig A. (1997). Measurable improvements in cycle-time-constrained capacity, Proceedings of the 6th International Symposium on Semiconductor Manufacturing (ISSM), San Francisco, USA.

Golany, B., Dar-El, E., & Zeev, N. (1999). Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process. IIE Transactions, 31, 771-781.

Hopp, W. J., & Spearman, M. L. (1991). Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research, 29, 635-655.

Hopp, W.J., & Roof, M.L. (1998). Setting WIP level with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research, 36, 867-882.

Hopp, J.H., & Spearman, M.L. (2000). Factory Physics. New York: McGraw Hill.

Huang, M., Wang, D., & Ip, W.H. (1998). Simulation study of CONWIP for a cold rolling plant. International Journal of Production Economics, 54, 257-266.

Lavoie, P., A.Gharbi, A., & Kenné, J.-P. (2010). A comparative study of pull control mechanisms for unreliable homogenous transfer lines. International Journal of Production Economics, 124, 241–251.

Li, N., Yao, S., Liu, G., & Zhuang, C. (2010). Optimization of a multi-Constant Work-in-Process semiconductor assembly and test factory based on performance evaluation. Computers & Industrial Engineering, 59, 314–322.

Luhl, P.B., Wangl, J.H., Wangl, J.L., & Tomastikz, R.N. (1997). Near-optimal scheduling of manufacturing systems with presence of batch machines and setup requirements. Annals of the CIRP, 46, 397-402.

Kashan, A.H., Karimi, B., & Jolai, F. (2010). An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Engineering Applications of Artificial Intelligence, 23, 911–922.

Kim, Y.D., Lee, D.H., Kim, J.U., & Roh, H.K. (1998). A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities. Journal of Manufacturing Systems, 17, 107-117.

Monch, L., Zimmermann, J., & Otto, P. (2006). Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. Engineering Applications of Artificial Intelligence, 19, 235–245.

Monch, L., Balasubramanian, H., Fowler, J.W., & Pfund, M.E. (2005). Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computers & Operations Research, 32, 2731–2750.

Neale, J.J., & Duenyas, I. (2000). Control of manufacturing networks which contain a batch processing machine. IIE Transactions, 32, 1027–1041.

Ryan, M., Baynat, B., & Choodineh, F. (2000). Determining inventory levels in a CONWIP controlled job shop. IIE Transactions, 32, 105-114.

Sharmaa, S., & Agrawalb, N. (2009). Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm. Computers & Operations Research, 36, 1622-1632.

Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP: A pull alternative to kanban. International Journal of Production Research, 28, 879-894.

Tardiff, V., & Maaseidvaag, L. (2001). An adaptive approach to controlling kanban systems. European Journal of Operational Research, 132, 411-424.

Tay, F., Lee, L.H., & Wang, L. (2002). Production Scheduling of a MEMS Manufacturing System with a Wafer Bonding Process. Journal of Manufacturing Systems, 21, 287-301.

Yang, T., Fub, H.P., & Yang, K.Y. (2007). An evolutionary-simulation approachfor the optimization of multi-constant work-in-process strategy-A case study. International Journal of Production Economics, 107, 104–114.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2011 | 📖 Volume: 2 | 📄 Issue: 1 | 👁️ Views: 4084 | 📊 Crossref: 8

Related Articles:
  • Feedback optimal control of dynamic stochastic two-machine flowshop with a finite buffer
  • Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations
  • Scheduling stochastic two-machine flow shop problems to minimize expected makespan
  • Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times
  • A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com