Bhagat, A., Sethi, R., & Garg, D. (2021). Controlled arrival machine repair problem with working vacation and reattempts. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 279–295.
Biswas, P., & Sarker, B. R. (2008). Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 46(23), 6585–6610.
Buscher, U., & Lindner, G. (2007). Optimizing a production system with rework and equal sized batch shipments. Computers & Operations Research, 34(2), 515–535.
Ceryan, O., Duenyas, I., & Koren, Y. (2012). Optimal control of an assembly system with demand for the end-product and intermediate components. IIE Transactions, 44(5), 386–403.
Chiu, Y.-S. P., Chiu, T., Pai, F.-Y., & Wu, H. Y. (2021). A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap. International Journal of Industrial Engineering Computations, 12(4), 427–440.
Chiu, Y.-S. P., You, L.-W., Chiu, T., & Pai, F.-Y. (2022). The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system. International Journal of Industrial Engineering Computations, 13(3), 329–342.
Chiu, Y.-S. P., Lo, Y.-L., Pai, F.-Y., Chiu, V., & Chiu, S. W. (2024a). Optimization of a hybrid multi-item fabricating-shipping integrated system considering scrap, adjustable-rate, and postponement. International Journal of Industrial Engineering Computations, 15(1), 89–104.
Chiu, Y.-S. P., Lian, J.-H., Pai, F.-Y., Chiu, T., & Chiu, S. W. (2024b). An operating cost minimization model for buyer-vendor coordination batch system with breakdowns, scrap, overtime, and an external source. International Journal of Industrial Engineering Computations, 15(1), 277–292.
Chiu, Y.-S. P., Chiu, V., Chiu, T., Yeh, T.-M., & Chiu, S. W. (2025). Determining a manufacturing-delivery policy for a multi-item EPQ system with multi-shipment, quality assurance, overtime, postponement, and external source. International Journal of Industrial Engineering Computations, 16(1), 51–68.
Gardner, J. W. (2020). Managing production yields and rework through feedback on speed, quality, and quantity. Production and Operations Management, 29(9), 2182–2209.
Grossman, G. M., & Helpman, E. (2002). Integration versus outsourcing in industry equilibrium. The Quarterly Journal of Economics, 117(1), 85–120.
Hariga, M., Gumus, M., Ben-Daya, M., & Hassini, E. (2013). Scheduling and lot sizing models for the single-vendor multi-buyer problem under consignment stock partnership. Journal of the Operational Research Society, 64(7), 995–1009.
Kalantari, S. S., & Taleizadeh, A. A. (2020). Mathematical modelling for determining the replenishment policy for deteriorating items in an EPQ model with multiple shipments. International Journal of Systems Science: Operations & Logistics, 7(2), 164–171.
Kim, T., Hong, Y., & Lee, J. (2005). Joint economic production allocation and ordering policies in a supply chain consisting of multiple plants and a single retailer. International Journal of Production Research, 43(17), 3619–3632.
Kohlmann, P., & Sahling, F. (2024). A flexible planning approach for integrated lot sizing and rework planning with random proportion of defective products. International Journal of Production Research, 62(19), 6961–6978.
Malekpour, H., Hafezalkotob, A., & Khalili-Damghani, K. (2021). Product processing prioritization in hybrid flow shop systems supported on Nash bargaining model and simulation-optimization. Expert Systems with Applications, 180, Article 115066.
Martorell, S., Sanchez, A., & Serradell, V. (1999). Age-dependent reliability model considering effects of maintenance and working conditions. Reliability Engineering & System Safety, 64(1), 19–31.
Mashud, A. H. M., Chakrabortty, R. K., & Hussain, O. K. (2025). Disruption-resilient multi-echelon supply chains: A model integrating carbon emissions and social welfare investments. International Journal of Production Research, 1–24. Advance online publication. https://doi.org/10.1080/00207543.2025.2591847
Mejía, G., & Lefebvre, D. (2020). Robust scheduling of flexible manufacturing systems with unreliable operations and resources. International Journal of Production Research, 58(21), 6474–6492.
Najafi, S., Duenyas, I., Jasin, S., & Uichanco, J. (2024). Multiproduct dynamic pricing with limited inventories under a cascade click model. Manufacturing & Service Operations Management, 26(2), 554–572.
Neidigh, R. O., & Harrison, T. P. (2010). Optimising lot sizing and order scheduling with non-linear production rates. International Journal of Production Research, 48(8), 2279–2295.
Ouyang, L.-Y., Ho, C.-H., & Su, C.-H. (2008). Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity. International Journal of Production Economics, 115(1), 151–162.
Öztürk, H., Eroglu, A., & Lee, G. M. (2015). An economic order quantity model for lots containing defective items with rework option. International Journal of Industrial Engineering: Theory Applications and Practice, 22(6), 683–704.
Özkan, S., Bulut, Ö., & Dinçer, M. C. (2024). Production control problem for multi-product multi-resource make-to-stock systems. International Journal of Industrial Engineering Computations, 15(2), 569–592.
Parija, G. R., & Sarker, B. R. (1999). Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions, 31(11), 1075–1082.
Pasandideh, S. H. R., & Niaki, S. T. A. (2008). A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space. Applied Mathematics and Computation, 195(2), 506–514.
Peymankar, M., Dehghanian, F., Ghiami, Y., & Abolbashari, M. H. (2018). The effects of contractual agreements on the economic production quantity model with machine breakdown. International Journal of Production Economics, 201, 203–215.
Rodrigues, L. F., Santos, M. O. D., & Almada-Lobo, B. (2023). A memetic algorithm for the multi-product production routing problem. Computers & Industrial Engineering, 182, Article 109388.
Syamsundar, A., Naikan, V. N. A., & Wu, S. (2021). Extended arithmetic reduction of age models for the failure process of a repairable system. Reliability Engineering & System Safety, 215, Article 107875.
Tavana, M., Hajipour, V., Abdollahzadeh, V., & Atashbaz, A. (2026). An integrated bi-objective multi-factory production and distribution model with direct shipments. Computers & Industrial Engineering, 212, Article 111668.
Tibaldo, A. S., Montagna, J. M., & Fumero, Y. (2025). MILP model for simultaneous batching, production and distribution operations in single-stage multiproduct batch plants. International Journal of Industrial Engineering Computations, 16(3), 671–692.
Wu, F., Li, H. Z., Chu, L. K., & Sculli, D. (2013). Supplier selection for outsourcing from the perspective of protecting crucial product knowledge. International Journal of Production Research, 51(5), 1508–1519.
Yahyaei, M., & Bozorgi-Amiri, A. (2019). Robust reliable humanitarian relief network design: An integration of shelter and supply facility location. Annals of Operations Research, 283(1–2), 897–916.
Zhang, M. (2015). Capacitated lot-sizing problem with outsourcing. Operations Research Letters, 43(5), 479–483.