How to cite this paper
Yuan, J., Wu, S., Zhang, Y., Cheng, C., Wang, S., Ma, F., Liu, Z & Ji, Y. (2026). Optimization of direct transshipment scheduling for river–sea intermodal transport with vessel arrival time matching.International Journal of Industrial Engineering Computations , 17(1), 163-184.
Refrences
Ai, T. (2025). Research on Cooperative Scheduling Optimization of Berth and Yard in Bulk Cargo Port for Ship Unloading Operations [Doctoral dissertation, Beijing Jiaotong University]. https://doi.org/10.26944/d.cnki.gbfju.2024.000022
Al-Refaie, A., & Abedalqader, H. (2021). Optimal berth allocation under regular and emergent vessel arrivals. Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment, 235(2), 642–656. https://doi.org/10.1177/1475090220937888
Barbosa, F., Rampazzo, P. C. B., de Azevedo, A. T., & Yamakami, A. (2022). The impact of time windows constraints on metaheuristics implementation: A study for the discrete and dynamic berth allocation problem. Applied Intelligence, 52(2), 1406–1434. https://doi.org/10.1007/s10489-021-02420-4
Chargui, K., Zouadi, T., El Fallahi, A., Reghioui, M., & Aouam, T. (2021). Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals. Transportation Research Part E: Logistics and Transportation Review, 154, 102449. https://doi.org/10.1016/j.tre.2021.102449
Cheimanoff, N., Fontane, F., Kitri, M. N., & Tchernev, N. (2021). A reduced VNS based approach for the dynamic continuous berth allocation problem in bulk terminals with tidal constraints. Expert Systems with Applications, 168, 114215. https://doi.org/10.1016/j.eswa.2020.114215
Corry, P., & Bierwirth, C. (2019). The berth allocation problem with channel restrictions. Transportation Science, 53(3), 708–727. https://doi.org/10.1287/trsc.2018.0865
Dong, Y. (2025). Optimization Research on Multimodal Transportation Path Selection for Large Cargoes [Master’s thesis, Dalian Maritime University]. https://doi.org/10.26989/d.cnki.gdlhu.2024.001030
Guo, L., Wang, J., & Zheng, J. (2021). Berth allocation problem with uncertain vessel handling times considering weather conditions. Computers & Industrial Engineering, 158, 107417. https://doi.org/10.1016/j.cie.2021.107417
Hill, A., Lalla-Ruiz, E., Voß, S., & Goycoolea, M. (2019). A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem. Journal of Scheduling, 22(2), 173–182. https://doi.org/10.1007/s10951-018-0578-9
Iris, Ç., Pacino, D., & Ropke, S. (2017). Improved formulations and an adaptive large neighborhood search heuristic for the integrated berth allocation and quay crane assignment problem. Transportation Research Part E: Logistics and Transportation Review, 105, 123–147. https://doi.org/10.1016/j.tre.2017.06.013
Karakas, S., Kirmizi, M., & Kocaoglu, B. (2021). Yard block assignment, internal truck operations, and berth allocation in container terminals: Introducing carbon-footprint minimisation objectives. Maritime Economics & Logistics, 23(4), 750–771. https://doi.org/10.1057/s41278-021-00186-7
Lalla-Ruiz, E., Shi, X., & Voß, S. (2018). The waterway ship scheduling problem. Transportation Research Part D: Transport and Environment, 60, 191–209. https://doi.org/10.1016/j.trd.2016.09.013
Li, J. (2015). Coordinated Optimization of Continuous Berth Scheduling and Cargo Yard Allocation in General Cargo Terminal [Master’s thesis, Wuhan University of Science and Technology]. https://kns.cnki.net/KCMS/detail/detail.aspx?dbcode=CMFD&dbname=CMFD201502&filename=1015582775.nh
Li, X. (2020). Ship Scheduling Optimization of Bulk Port Based on Dynamic Programming Algorithm. Computer Simulation, 37(11), 393–397.
Liu, Z. (2021). Research on optimization of berth and yard resource scheduling in coal terminal [Master’s thesis, Dalian Maritime University]. https://doi.org/10.26989/d.cnki.gdlhu.2020.001199
Mao, A., Yu, T., Ding, Z., Fang, S., Guo, J., & Sheng, Q. (2022). Optimal scheduling for seaport integrated energy system considering flexible berth allocation. Applied Energy, 308, 118386. https://doi.org/10.1016/j.apenergy.2021.118386
Mubder, A. A. A. M. (2024). The implementation of berth allocation policies that enable just-in-time arrival in port calls. International Journal of Physical Distribution & Logistics Management, 54(6), 610–630. https://doi.org/10.1108/IJPDLM-11-2023-0442
Nitonye, S., Ahiakwo, O. V., & Oludi, K. (2024). Digitalization of bulk carries: Revolutionizing efficiency, safety and environmental responsibility. Quantum Journal of Engineering, Science and Technology, 5(1), 30–44.
Niu, M., Wang, Z., Li, Y., & Zheng, H. (2020). Berth allocation and ship scheduling integrated optimization considering the priority of berth in use. High Technology Letters, 30(9), 972–981.
Rodrigues, F., & Agra, A. (2021). An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times. European Journal of Operational Research, 295(2), 499–516. https://doi.org/10.1016/j.ejor.2021.03.016
Sheikholeslami, A., Mardani, M., Ayazi, E., & Arefkhani, H. (2020). A dynamic and discrete berth allocation problem in container terminals considering tide effects. Iranian Journal of Science & Technology Transactions of Civil Engineering, 44(1), 369–376. https://doi.org/10.1007/s40996-019-00239-1
Wu, L., Jia, S., & Wang, S. (2020). Pilotage planning in seaports. European Journal of Operational Research, 287(1), 90–105. https://doi.org/10.1016/j.ejor.2020.05.009
Xiang, X., & Liu, C. (2021). An expanded robust optimisation approach for the berth allocation problem considering uncertain operation time. Omega, 103, 102444. https://doi.org/10.1016/j.omega.2021.102444
Yao, J., & Wu, J. (2021). Berth allocation in a bulk terminal with overall quay length constraint. International Journal of Pattern Recognition and Artificial Intelligence, 35(6), 2159019. https://doi.org/10.1142/S0218001421590199
Yu, Y. (2018). Imported Bulk Port Berth Allocation-Unloader Scheduling Integration Optimization [Master’s thesis, Dalian Maritime University]. https://kns.cnki.net/KCMS/detail/detail.aspx?dbcode=CMFD&dbname=CMFD201802&filename=1018058378.nh
Zhang, S. (2024). Research on Intelligent Production Scheduling Method of Bulk Cargo Terminal Operation Area in Small and Medium-Sized Inland River [Master’s thesis, Wuhan University of Technology]. https://doi.org/10.27381/d.cnki.gwlgu.2022.000379
Zhang, X., Li, R., Chen, X., Li, J., & Wang, C. (2019). Multi-object-based vessel traffic scheduling optimisation in a compound waterway of a large harbour. Journal of Navigation, 72(3), 609–627. https://doi.org/10.1017/S0373463318000863
Zhang, X., Li, R., Wang, C., Xue, B., & Guo, W. (2024). Robust optimization for a class of ship traffic scheduling problem with uncertain arrival and departure times. Engineering Applications of Artificial Intelligence, 133, 108257. https://doi.org/10.1016/j.engappai.2024.108257
Zhang, X., Wang, Z., & Deng, Z. (2020). Ship Traffic Organization Optimization of Constrained Two-Way Channel in Huanghua Port. NAVIGATION OF CHINA, 43(4), 1–7.
Zhang, Y., Liu, S., Zheng, Q., Tian, H., & Guo, W. (2024). Ship scheduling problem in an anchorage-to-quay channel with water discharge restrictions. Ocean Engineering, 309, 118432. https://doi.org/10.1016/j.oceaneng.2024.118432
Zheng, H., Zhu, X., & Li, Z. (2021). Optimization algorithm of ship dispatching in container terminals with two-way channel. Journal of Computer Applications, 41(10), 3049–3055.