Processing, Please wait...

  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Optimal grouping preventive maintenance strategy for the multi-part series system under the extended warranty condition

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (805)
  • IJDS (992)
  • DSL (722)
  • ESM (434)
  • CCL (544)
  • JPM (323)
  • AC (562)
  • JFS (101)
  • MSL (2648)
  • USCM (1104)
  • HE (44)
  • SCI (48)

IJIEC Volumes

    • Volume 17 (78)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (27)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Supply chain management(169)
Jordan(167)
Vietnam(154)
Customer satisfaction(124)
Performance(116)
Supply chain(113)
Artificial intelligence(99)
Competitive advantage(98)
Service quality(98)
Tehran Stock Exchange(94)
SMEs(92)
Sustainability(91)
optimization(88)
TOPSIS(85)
Financial performance(84)
Trust(84)
Job satisfaction(81)
Knowledge Management(80)
Genetic Algorithm(80)
Social media(79)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(67)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(38)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Haitham M. Alzoubi(30)
Mohammad Khodaei Valahzaghard(30)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (1)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (57)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (8)
16. Brazil (39)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 16 Issue 4 pp. 847-866 , 2025

Optimal grouping preventive maintenance strategy for the multi-part series system under the extended warranty condition Pages 847-866 Right click to download the paper Download PDF

Authors: Xinjian Gao, Zhonghua Cheng, Enzhi Dong, Kexin Jian

📋 Author Affiliations:
Xinjian Gao¹, Enzhi Dong¹, Kexin Jiang¹, Zhonghua Cheng²
¹ Army Engineering University of PLA, Nanjing, 320100, China
² The Fourth Air Force Flight Academy of the PLA, Shijiazhuang, 050003, China
doi 10.5267/j.ijiec.2025.8.013
Crossmark
2 Source: Scopus

🔑 Keywords: Multi-part series system, Preventive maintenance (PM), Extended warranty (EW), Cost-availability ratio, Simulated annealing algorithm

Abstract: Extended warranty (EW) is an optional contract that typically provides additional guarantee to users by the manufacturer after the initial warranty period of the equipment expires. To meet users' demand for minimizing the EW cost-availability ratio during the device's EW period and protect the manufacturer's profit, this article innovatively proposes a grouping preventive maintenance (GPM) strategy for multi-part series system, based on the consideration of user and manufacturer sharing warranty cost proportionally. This strategy can integrate the preventive maintenance (PM) of each individual component in the system, thereby reducing the total number of PM times and lowering the preparation cost for PM. The decision objective of the GPM strategy is to minimize the cost-availability ratio of the system's EW, and the decision variables are the PM interval and PM improvement factor. In the case analysis, taking the power system of electric vehicles as the research object, it was found that after adopting the GPM strategy, the EW cost-availability ratio of the system reduced by 16.6%, thus verifying the superiority of the GPM strategy proposed in this paper.

How to cite this paper
APA: Gao, X., Cheng, Z., Dong, E & Jian, K. (2025). Optimal grouping preventive maintenance strategy for the multi-part series system under the extended warranty condition. International Journal of Industrial Engineering Computations, 16(4), 847-866.
Chicago/Turabian: Gao, X., Cheng, Z., Dong, E & Jian, K. 2025. "Optimal grouping preventive maintenance strategy for the multi-part series system under the extended warranty condition." International Journal of Industrial Engineering Computations 16, no. 4 (2025): 847-866.
AMA: Gao, X., Cheng, Z., Dong, E & Jian, K. Optimal grouping preventive maintenance strategy for the multi-part series system under the extended warranty condition. International Journal of Industrial Engineering Computations. 2025;16(4):847-866.

References
Afsahi, M., Kashan, A. H., & Ostadi, B. (2021). A hybrid approach for joint optimization of base and extended warranty decisions considering out-of-warranty products. Applied Mathematical Modelling, 95, 176-199.
Ben Mabrouk, A., & Chelbi, A. (2023). Optimal maintenance policy for equipment leased with base and extended warranty. International Journal of Production Research, 61(3), 898-909.
Bouguerra, S., Rezg, N., & Chelbi, A. (2012). A decision model for adopting an extended two-dimensional warranty considering different maintenance policies with variable customer's behavior. IFAC Proceedings Volumes, 45(6), 968-974.
Chun, Y. H. (1992). Optimal number of periodic preventive maintenance operations under warranty. Reliability Engineering & System Safety, 37(3), 223-225.
Dai, A., Wei, G., Zhang, Z., & He, S. (2020). Design of a flexible preventive maintenance strategy for two-dimensional warranted products. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 234(1), 74-87.
Duchesne, T., & Lawless, J. (2000). Alternative time scales and failure time models. Lifetime data analysis, 6, 157-179.
El-Sherbeny, M. S., & Hussien, Z. M. (2021). Reliability and sensitivity analysis of a repairable system with warranty and administrative delay in repair. Journal of Mathematics, 2021(1), 9424215.
Gao, X., Cheng, Z., Gao, T., Wang, R., Jiang, K., & Dong. E. (2025). The optimal joint preventive maintenance strategy for the equipment under two-dimensional extended warranty. Eksploatacja i Niezawodność - Maintenance and Reliability. https://doi:10.17531/ein/203763.
He, Z., Wang, D., He, S., Zhang, Y., & Dai, A. (2020). Two-dimensional extended warranty strategy including maintenance level and purchase time: A win-win perspective. Computers & Industrial Engineering, 141, 106294.
Huang, Y. S., Chen, E., & Ho, J. W. (2013). Two-dimensional warranty with reliability-based preventive maintenance. IEEE Transactions on Reliability, 62(4), 898-907.
Huang, Y. S., Fang, C. C., & Kuo, C. Y. (2024). A study on two‐dimensional warranty with a preventive maintenance policy under burn‐in or run‐in. Applied Stochastic Models in Business and Industry, 40(4), 979-995.
Huang, Y. S., Gau, W. Y., & Ho, J. W. (2015). Cost analysis of two-dimensional warranty for products with periodic preventive maintenance. Reliability Engineering & System Safety, 134, 51-58.
Kijima, M., Morimura, H., & Suzuki, Y. (1988). Periodical replacement problem without assuming minimal repair. European Journal of Operational Research, 37(2), 194-203.
Kim, H. G., & Rao, B. M. (2000). Expected warranty cost of two-attribute free-replacement warranties based on a bivariate exponential distribution. Computers & Industrial Engineering, 38(4), 425-434.
Liu, P., & Wang, G. (2024). Two-dimensional warranty policy design with the consideration of protection term. International Journal of Production Economics, 276, 109350.
Liu, Z., Zhang, C., Dong, E., Wang, R., Li, S., & Han, Y. (2023). Research progress and development trend of prognostics and health management key technologies for equipment diesel engine. Processes, 11(7), 1972.
Ma, J., Si, F., Zhang, Q., & Wang, Z. (2024). Impact of extended warranty service on product pricing in online direct retailers' competitive market. Energy Economics, 129, 107217.
Ma, W. N., Li, H., Yang, Z. Y., & Hu, Q. W. (2021). Maintenance Optimization for Two-Component Series Systems With Degradation Dependence. IEEE Access, 9, 48174-48184.
Majeske, K. D. (2007). A non-homogeneous Poisson process predictive model for automobile warranty claims. Reliability Engineering & System Safety, 92(2), 243-251.
Mitra, A. (2021). Warranty parameters for extended two-dimensional warranties incorporating consumer preferences. European Journal of Operational Research, 291(2), 525-535.
Shen, J., Hu, J., & Ma, Y. (2020). Two preventive replacement strategies for systems with protective auxiliary parts subject to degradation and economic dependence. Reliability Engineering & System Safety, 204, 107144.
Su, C., & Wang, X. (2016). A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty. Reliability Engineering & System Safety, 155, 169-178.
Wang, D., He, Z., He, S., Zhang, Z., & Zhang, Y. (2021). Dynamic pricing of two-dimensional extended warranty considering the impacts of product price fluctuations and repair learning. Reliability Engineering & System Safety, 210, 107516.
Wang, X. L., Peng, S., & Zhang, X. (2025). Extended warranty pricing in a competitive aftermarket under logit demand. European Journal of Operational Research.
Wang, X., & Ye, Z. S. (2020). Design of customized two-dimensional extended warranties considering use rate and heterogeneity. Iise Transactions, 53(3), 341-351.
Wang, X., Li, L., & Xie, M. (2020). An unpunctual preventive maintenance policy under two-dimensional warranty. European Journal of Operational Research, 282, 304-318.
Yeh, R. H., & Lo, H. C. (2001). Optimal preventive-maintenance warranty policy for repairable products. European Journal of operational research, 134(1), 59-69.
Yun, W. Y., & Kang, K. M. (2007). Imperfect repair policies under two-dimensional warranty. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 221(4), 239-247.
Zeng, Y., Zhang, Z., Zhang, Y., Liang, W., & Song, H. (2025). Modelling and optimization of line efficiency for preventive maintenance of robot disassembly line. Journal of Manufacturing Systems, 79, 347-363.
Zhao, F., & Zhang, N. (2025). A general preventive maintenance framework of a production system considering dynamic maintenance accessibility. Computers & Industrial Engineering, 204, 111054.
Zhao, L., Cheng, W., Meng, L., Zhang, C., Ren, Y., Zhang, B., & Duan, P. (2025). MILP modeling and optimization of flexible job shop scheduling problem with preventive maintenance. Computers & Industrial Engineering, 201, 110861.
Zhen, X., Han, Y., & Huang, Y. (2021). Optimization of preventive maintenance intervals integrating risk and cost for safety critical barriers on offshore petroleum installations. Process Safety and Environmental Protection, 152, 230-239.
Zhou, X., Feng, Y., Chen, H., Cai, L., & Bashkarev, V. (2025). Pricing Strategy of Supply Chain Considering Response Time of Extended Warranty Service. Operations Research Perspectives, 100330.
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2025 | Volume: 16 | Issue: 4 | Views: 646 | Reviews: 0

Related Articles:
  • Introduce free replacement extended warranty and bundle it? Optimal new extended warranty introduction strategy
  • Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines
  • Reliability analysis of two dissimilar parallel unit repairable system with failure during preventive maintenance
  • Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint
  • Developing a benchmarking approach to evaluate the state of warranty in automakers: A case study of two biggest automakers in Middle East

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines


Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com