Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » A dual-layer BOM change control model for efficiency improvement in ETO manufacturing

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

IJIEC Volumes

    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 17 (21)
      • Issue 1 (21)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 16 Issue 3 pp. 641-656 , 2025

A dual-layer BOM change control model for efficiency improvement in ETO manufacturing Pages 641-656 Right click to download the paper Download PDF

Authors: Chunhua Wan, Yufei Zeng, Ji Ma, Tao Wang, Kaiyang Zhong

DOI: 10.5267/j.ijiec.2025.4.007

Keywords: ETO (Engineer-to-Order), BOM (Bill of Materials), Change control, Dual-layer traceability, Supply chain collaboration

Abstract: To address the frequent changes, dynamic evolution, and complex collaboration of BOM (Bill of Materials) under ETO (Engineer-to-Order) mode, this paper proposes a dual-layer BOM-based change control model. First, to enable model definition and change expression throughout the product lifecycle, a version control-based BOM model is defined by introducing material revision, material relationship links, and a multi-view mechanism, while also constructing a general BOM structure system. Then, to ensure traceability of product structural changes and cross-view consistency in the ETO mode, we design a dual-layer change traceability model. This model features vertical version chains and horizontal view collaboration traceability as its core components. Finally, an ETO-oriented BOM change operation model is constructed to standardize both in-view change operations and cross-view cooperative operations. This standardization enhances change control capability and lifecycle traceability efficiency of product structures in ETO manufacturing environments. The application of this model in a large equipment manufacturing enterprise shows that it significantly improves the change response efficiency and provides strong support for the digital transformation and supply chain collaboration of ETO enterprises.

How to cite this paper
Wan, C., Zeng, Y., Ma, J., Wang, T & Zhong, K. (2025). A dual-layer BOM change control model for efficiency improvement in ETO manufacturing.International Journal of Industrial Engineering Computations , 16(3), 641-656.

Refrences
Bhalla, S., Alfnes, E., & Hvolby, H. H. (2023). Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review. International Journal of Production Research, 61(7), 2339-2371. Chowdhury, A. M., & Moon, S. (2023). Generating integrated bill of materials using mask R-CNN artificial intelligence model. Automation in Construction, 145, 104644. Fa, J., Wen, Y., Yongan, Z., Rong, Z., & **uhui, G. (2020, April). Dynamic BOM construction technology and application based on MBD. In Journal of Physics: Conference Series (Vol. 1486, No. 7, p. 072050). IOP Publishing. Gosling, J., & Naim, M. M. (2009). Engineer-to-order supply chain management: A literature review and research agenda. International journal of production economics, 122(2), 741-754. Hicks, C., McGovern, T., & Earl, C. F. (2000). Supply chain management: A strategic issue in engineer to order manufacturing. International journal of production economics, 65(2), 179-190. Jing, Z., Hu, N., Song, Y., Song, B., Gu, C., & Pan, L. (2022). On the design and implementation of a blockchain-based data management system for ETO manufacturing. Applied Sciences, 12(18), 9184. Kalantari, M., Rabbani, M., & Ebadian, M. (2011). A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems. Applied Mathematical Modelling, 35(3), 1363-1377. Lee, J. H., Kim, S. H., & Lee, K. (2012). Integration of evolutional BOMs for design of ship outfitting equipment. Computer-Aided Design, 44(3), 253-273. Love, P. E., Matthews, J., & Ika, L. A. (2024). Rework in relational engineer-to-order production systems: An ‘error-as-process’ archetype. International Journal of Production Economics, 274, 109310. Mello, M. H., Strandhagen, J. O., & Alfnes, E. (2015). Analyzing the factors affecting coordination in engineer-to-order supply chain. International Journal of Operations & Production Management, 35(7), 1005-1031. Pracucci, A. (2024). Designing Digital Twin with IoT and AI in warehouse to support optimization and safety in Engineer-to-Order manufacturing process for prefabricated building products. Applied Sciences, 14(15), 6835. Qiao, L., Zhang, Z., & Huang, Z. (2021). Construction of multi-project network planning based on bom and its resource leveling. IEEE Access, 9, 71887-71899. Schramm, S., Pieper, M., & Vogl, S. (2023). Orthogonal Procrustes and Machine Learning: Predicting Bill of Materials errors on time. Computers & Industrial Engineering, 185, 109606. Shiau, J. Y. (2020). A semi-automatic planning BOM generator based on VMI forecasting. International Journal of Systems Science: Operations & Logistics, 7(2), 121-132. Thajudeen, S., Elgh, F., & Lennartsson, M. (2022). Supporting the reuse of design assets in ETO-based components—A case study from an industrialised post and beam building system. Buildings, 12(1), 70. Vaagen, H., Kaut, M., & Wallace, S. W. (2017). The impact of design uncertainty in engineer-to-order project planning. European Journal of Operational Research, 261(3), 1098-1109. Wang, S., Liu, X., Bai, Z., & Xiao, J. (2023). A BOM model transformation method for hierarchical production planning management process of complex products. Advanced Engineering Informatics, 58, 102138. Wang, Y., Ren, W., Zhang, C., & Zhao, X. (2022). Bill of material consistency reconstruction method for complex products driven by digital twin. The International Journal of Advanced Manufacturing Technology, 120(1), 185-202. Wang, Y., Wang, Y., Ren, W., & Jiang, Z. (2024). Knowledge driven multiview bill of material reconfiguration for complex products in the digital twin workshop. The International Journal of Advanced Manufacturing Technology, 130(7), 3469-3480. Willner, O., Gosling, J., & Schönsleben, P. (2016). Establishing a maturity model for design automation in sales-delivery processes of ETO products. Computers in Industry, 82, 57-68. Zhao, X., Wei, S., Ren, S., Cai, W., & Zhang, Y. (2024). Integrating MBD with BOM for consistent data transformation during lifecycle synergetic decision-making of complex products. Advanced Engineering Informatics, 61, 102491. Zhou, C., Liu, X., Xue, F., Bo, H., & Li, K. (2018). Research on static service BOM transformation for complex products. Advanced engineering informatics, 36, 146-162.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2025 | Volume: 16 | Issue: 3 | Views: 488 | Reviews: 0

Related Articles:
  • Two-stage optimization of instant distribution of fresh products based on i ...
  • Coordination and optimization decision of assembly building supply chain un ...
  • A structural equation model for analyzing the relationship between enterpri ...
  • Aggregate simulation modeling with application to setting the CONWIP limit ...
  • A model for network design of supply chain management in research projects

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com