How to cite this paper
Parsaei, S., Keramati, M., Zorriassatine, F & Feylizadeh, M. (2012). An order acceptance using FAHP and TOPSIS methods: A case study of Iranian vehicle belt production industry.International Journal of Industrial Engineering Computations , 3(2), 2112-224.
Refrences
Abo-Sinna, M. A., Amer, A. H., & Ibrahim, A. S. (2008). Extensions of TOPSIS for large scale multi-objective non-linear programming problems with block angular structure. Applied Mathematical Modelling, 32(3), 292-302.
Albayrak, E., & Erensal, Y. C. (2004). Using analytic hierarchy process (AHP) to improve human performance. An application of multiple criteria decision making problem. Journal of Intelligent Manufacturing, 15, 491-503.
Alidaee, B., Kochenberger, G. A., & Amini, M. M. (2001). Greedy solutions of selection and ordering problems. European Journal of Operational Research, 134, 203-215.
Amiri, P. M. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 37, 6218-6224.
Arredondo, F., & Martinez, E. (2010). Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing. Computers & Industrial Engineering, 58, 70-83.
Badri, M. A. (2001). A combined AHP–GP model for quality control systems. International Journal of Production Economics, 72, 27-40.
Balakrishnan, N., Patterson, J. W., & Sridharan, V. (1999). Robustness of capacity rationing policies. European Journal of Operational Research, 115, 328-38.
Balakrishnan, N., Sridharan, V., & Patterson, J. W. (1996). Rationing capacity between two product classes. Decision Science, 27(2), 185-214.
Balli, S., & Koruko?lu, S. (2009). Operating system selection using fuzzy AHP and TOPSIS methods. Mathematical and Computational Applications, 14(2), 119-130.
Bellman, R. E., & Zadeh, L. A. (1970). Decision making in a Fuzzy environment, Management Science. 17(4), 141-164.
Boender, C. G. E., de Graan, J. G., & Lootsma, F. A. (1989). Multicriteria decision analysis with fuzzy pairwise comparisons. Fuzzy Sets and Systems, 29, 133-143.
Benyoucef, M., & Canbolat, M. S. (2007). Fuzzy AHP based supplier selection in e-procurement. International Journal of Services and Operations Management, 3(2), 172-192.
Bottani, E., & Rizzi, A. (2005). A fuzzy multi-attribute framework for supplier selection in an e-procurement environment. International Journal of Logistics: Research and Applications, 8(3), 249-266.
Bozbura, F. T., Beskese, A., & Kahraman C. (2007). Prioritization of human capital measurement indicators using fuzzy AHP. Expert Systems with Applications, 32(2), 1100-1112.
Buckley, J. J. (1985). Fuzzy hierarchical analysis. Fuzzy Sets and Systems, 17, 233-247.
Cakir, O., & Canbolat, M. S. (2008). A web-based decision support system for multi-criteria inventory classification using fuzzy AHP methodology. Expert Systems with Applications, 35, 1367-1378.
Chamodrakas, I., Batis, D., & Martakos, D. (2010). Supplier selection in electronic marketplaces using satisficing and fuzzy AHP. Expert Systems with Applications, 37, 490-498.
Chan, F. T. S., & Kumar N. (2007). Global supplier development considering risk factors using fuzzy extended AHP-based approach. Omega, 35,417-431.
Chang, D. Y. (1996). Application of the Extent Analysis Method on fuzzy AHP. European Journal of Operational Research, 95, 649-655.
Chen, P. C. (2009). A Fuzzy Multiple Criteria Decision Making Model in Employee Recruitment. International Journal of Computer Science and Network Security, 9(7), 113-117.
Chen,S. J., & Hwang, C. L. (1992). Fuzzy Multiple Attribute Decision Making: Methods and Applications, Springer-Verlag, Berlin.
Cheng, C. H., Yang, & K. L., & Hwang, C. L. (1999). Evaluating attack helicopters by AHP based on linguistic variable weight. European Journal of Operational Research, 116, 423-435.
Chin, K. S., Pun, K. F., Xu, Y., & Chan, J. S. F. (2002). An AHP based study of critical factors for TQM implementation in Shanghai manufacturing industries. International Journal of Technical Innovation and Entrepreneurship, 22(2), 707-715.
Condon, E., Golden, B., & Wasil, E. (2003). Visualizing group decisions in the AHP. Computers & Operations Research, 30, 1435-1445.
Dagdeviren, M., Yavuz, S., & K?l?nc, N. (2009). Weapon selection using the AHP and TOPSIS methods under fuzzy environment. Expert Systems with Applications, 36, 8143-815.
Dagdeviren, M., & Yüksel, I. (2008). Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management. Information Science, 178,1717-1733.
Defregger, F., & Kuhn, H. (2004). Revenue management in manufacturing. In Operations Research Proceedings ,17-22.
Duran, O., & Aguilo, J. (2008). Computer-aided machine-tool selection based on a Fuzzy-AHP approach. Expert Systems with Applications, 34 ,1787-1794.
Ebben, M. J. R., Hans, E. W., & Weghuis, O. F. M. (2005).Workload based order acceptance in job shop environments. OR Spectrum, 27, 107-122.
Flores, B. E., Olson, D. L., & Dorai, V. K. (1992). Management of multicriteria inventory classification. Mathematical and Computer Modeling, 16(12), 71-82.
Forman, E. H., & Selly, M. A. (2001). Decision by Objectives, Mailand Press.
Ghodsypour S. H., & O’Brien, C. (1998). A decision support system for supplier selection using an integrated analytical hierarchy process and linear programming. International Journal of Production Economics, 56, 199-212.
Ghosh, J. B. (1997). Job selection in a heavily loaded shop. Computers & Operations Research, 24(2), 141-145.
Guerrero, H. H., & Kern G. (1990). A conceptual model for demand management in the assemble-to-order environment. Journal of Operations Management, 9(1), 65-83.
Herbots, J., Herroelen, W. S., Leus, R., & Demeulemeester, E. L. (2007). Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment. MISTA.
Hosseinzadeh Lotfi, F., Allahviranloo, T., Alimardani Jondabeh, M., & Kiani, N. A. (2007). A new method for complex decision making based on TOPSIS for complex decision making problems with fuzzy data, Applied Mathematical Sciences, 1(60) , 2981-2987.
Hing, M. M., Van Harten, A., & Schuur, P. (2007). Reinforcement learning versus heuristics for order acceptance on a single resource. Journal of Heuristics, 13,167–187.
Hing, M. M., van Harten, A., & Schuur, P. (2002). Order acceptance with reinforcement learning, Working paper WP-66, University of Twente, the Netherlands.
Hwang, C. L., & Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications, Springer, Berlin Heidelberg.
Ivanescu, V. C. (2004). Order acceptance under uncertainty in batch process industries. Eindhoven :Technische Universiteit Eindhoven.
Jablonsky, J. (2007). Measuring the efficiency of production units by AHP models. Mathematical and Computer Modelling, 46, 1091-1098.
Jadidi, O., Hong, T. S., Firouzi, F., Yusuff, R. M., & Zulkifli, N. (2008). TOPSIS and fuzzy multi-objective model integration for supplier selection problem. Journal of Achievements in Materials and Manufacturing Engineering, 31(2), 762–769.
Jahanshahloo, G. R., Lotfi, F. H., & Izadikhah, M. (2006). Extension of the TOPSIS method for decision-making problems with fuzzy data. Applied Mathematics and Computation, 181(2), 1544-1551.
Jalora , A. (2006). Order acceptance and scheduling at a make-to-order system using revenue management, Ph.D. thesis, University of Texas A & M University.
Jee, D. H., & Kang, J. K. (2000). A method for optimal material selection aided with decision making theory. Materials and Design, 21(3), 199-206.
Kahraman, C., Cebeci, U., & Ruan, D. (2004). Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey. International journal Production Economics, 87, 171-184.
Kahraman, C., Cebeci, U., & Ulukan, Z. (2003). Multicriteria supplier selection using Fuzzy AHP. Logistics Information Management, 16(6), 382-394.
Kahraman, C., Ruan, D., & Dogan, I. (2003). Fuzzy group decision-making for facility location selection. Information Sciences, 157, 135-153.
Kahraman, C., Ruan D. & Tolga, E. (2002). Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows. Information Sciences, 142, 57-76.
Karimi, M. S., Zulkornain, Y., & Law, S. H. (2010). Location Decision for Foreign Direct Investment in ASEAN Countries: A TOPSIS Approach. International Research Journal of Finance and Economics, ISSN 1450-2887 Issue 36.
Kaufmann, A., & Gupta, M. M. (1991). Introduction to Fuzzy Arithmetic: Theory and Applications. Van Nostrand-Reinhold, New York.
Kniker, T. S., & Burman, M. H. (2001). Applications of revenue management to manufacturing, In Third AEGEAN International Conference on Design and Analysis of Manufacturing Systems, Tinos Island, Greece, 299-308.
Korpela, J., Kylaheiko, K., Lehmusvaara, A., & Tuominen, M. (2002). An analytic approach to production capacity allocation and supply chain design. International Journal of Production Economics, 78(2),187-195.
Kulak, O., & Kahraman, C. (2005). Fuzzy multi-attribute selection among transportation companies using axiomatic design and analytic hierarchy process. Information Sciences, 170, 191-210.
kumar, S., & Mahapatra , S. S. (2009). A fuzzy multi-criteria decision making approach for supplier selection in supply chain management. African Journal of Business Management, 3 (4), 168-177.
Laarhoven, V., & Pedrycz, P. J. (1983). A fuzzy extension of Saaty & apos; s priority theory. Fuzzy Sets and Systems 11, 229-241.
Lee, A. H. I., Chen, W. C., & Chang, C. J. (2008). A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan. Expert Systems with Applications, 34(1), 96-107.
Lee, J. W., & Kim, S. H. (2001). An integrated approach for interdependent information system project selection. International Journal of Project Management, 19, 111-118.
Lewis, H. F., & Slotnick, S. A. (2002). Multi-period job selection: Planning workloads to maximize profit. Computers and Operations Research, 29, 1081-1098.
Li, T. S., & Huang, H. H. (2009). Applying TRIZ and Fuzzy AHP to develop innovative design for automated manufacturing systems. Expert Systems with Applications, 36, 8302-8312.
Liang, G. S., & Wang, M. J. (1994). Personnel selection using fuzzy MCDM algorithm. European Journal of Operational Research, 78, 22-33.
Lin, M. C., Wang, C. C., Chen, M. S., & Chang, C. A. (2008). Using AHP and TOPSIS approaches in customer-driven product design process. Computers in Industry, 59, 17-31.
Mula, J., Poler, R., Garc?´a-Sabater, J. P., & Lario, F. C. (2006). Models for production planning under uncertainty: A review. International journal Production Economics, 103, 271-285.
Nandi, A., & Rogers, P. (2003). Behavior of an order release mechanism in a make-to order Manufacturing system with selected order acceptance. In Proceedings of the 2003 winter simulation conference,1251–1259.
Murtaza, M. B. (2003). Fuzzy-AHP application to country risk assessment. American Business Review, 21(2), 109-116.
Nandi, A., & Rogers, P. (2004). Using simulation to make-to-order acceptance/rejection decision. Simulation, 80, 131-142.
Ngai, E. W. T., & Chan, E. W. C. (2005). Evaluation of knowledge management tools using AHP. Expert Systems with Applications, 29, 889-899.
Ono, K., & Jones, C. (1973). An heuristic approach to acceptance rules in integrated scheduling systems. Journal of Operations Research Society of Japan, 16, 37-58.
Onüt, S., & Soner, S. (2007). Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment. Waste Management, 28(9),1552-1559.
Partovi, F. Y. (2007). An analytical model of process choice in the chemical industry. International Journal of Production Economics, 105, 213-227.
Ramanathan, R., & Ganesh, L. S. (1995). Using AHP for resource allocation problems. European Journal of Operational Research, 80(2), 410-417.
Rogers, P., & Nandi, A. (2007). Judicious order acceptance and order release in make- to-order manufacturing systems. Production Planning and Control, 18(7), 610-625.
Rom, W. O., & Slotnick, S. A. (2009). Order acceptance using genetic algorithms. Computers & Operations Research, 36, 1758 – 1767.
Roundy, R., Chen, D., Chen, P., Cakanyildirim, M., Freimer M. B., & Melkonian, V. (2005). Acceptance of customer orders for a multi-stage batch manufacturing system: models and algorithms, IIEransactions, 37(12), 1093-105.
Shyur, H. J. (2006). COTS evaluation using modified TOPSIS and ANP. Applied Mathematics and Computation, 177, 251-259.
Slotnick, S. A., & Morton, T. E. (1996). Selecting jobs for a heavily loaded shop with lateness penalties. Computers & Operations Research, 23(2), 131-140.
Slotnick, S. A., & Morton T. E. (2007). Order acceptance with weighted tardiness. Computers & Operations Research, 34, 3029-3042.
Snoek, M. (2000). Neuro-genetic order acceptance in a job shop setting. Proceedings of the 7th international conference on Neural Information Processing, Taejon, Korea, 815-819.
Soman, C. A., Donk, V. D. P., & Gaalman G. (2004). Combined make-to-order and make-to-stock in a food production system, International Journal of Production Economics, 90, 223-235
Srdjevic, B. (2007). Linking analytic hierarchy process and social choice methods to support group decision-making in water management. Decision Support Systems, 42, 2261-2273.
Sun, C. C. (2010). A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert Systems with Applications,37(12), 7745-7754.
Taskin, G. A. (2008). Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology. Expert Systems with Applications, 36, 4067-4074.
Taylor, F. A., Ketcham, A. F., & Hoffman, D. (1998). Personnel evaluation with AHP. Management Decision, 36, 679-685.
Ten Kate, H. A. (1994). Towards a better understanding of order acceptance. International Journal of Production Economics, 37, 139-152.
Ten Kate, H. A. (1995). Order acceptance and production control, Ph.D. thesis, University of Groningen.
Teodorovic, D. (1985). Multi-criteria ranking of air shuttle alternatives. Transportation Research Part B: Methodological, 19(1), 63-72.
Tolga, E., Demircan, M. L., & Kahraman, C. (2005). Operating system selection using fuzzy replacement analysis and analytic hierarchy process. International Journal of Production Economics, 97(1), 89-117.
Wang, J., Yang, J., Q., & Lee, H. (1994). Multicriteria order acceptance decision support in over-demanded job shops: a neural network approach. Mathematical Computer Modelling, 19(5), 1-19.
Wang, T. C., & Chen, Y. H. (2008). Applying fuzzy linguistic preference relations to the improvement of consistency of fuzzy AHP. Information Sciences, 178, 3755-3765.
Wang, T. C., & Lee, H. D. (2009). Developing a fuzzy TOPSIS approach based on subjective weights and objective weights. Expert Systems with Applications, 36, 8980-8985.
Wu, M. (2007). Topsis-AHP simulation model and its application to supply chain management. World Journal of Modelling and Simulation, 3, 196-201.
Wu, M. C., & Chen, S. Y. (1997). A multiple criteria decision-making model for justifying the acceptance of rush orders. Prouduction planning & control, 8(8), 753- 761.
Yong, D. (2006). Plant location selection based on fuzzy TOPSIS. International Journal of Advanced Manufacturing Technology, 28, 839-844.
Yu, C. S. (2002). A GP-AHP method for solving group decision-making fuzzy AHP problems. Computers and Operations Research, 29, 1969-2001.
Zanakis, S. H., Solomon, Wishart, A. N., & Dublish, S. (1998). Multi-attribute decision making: A simulation comparison of selection methods. European Journal of Operational Research, 107, 507-529.
Zhang, B., & Shaofu, D. (2010). Multi-product newsboy problem with limited capacity and outsourcing. European Journal Operational Research, 202, 107-113.
Zimmermann, H. J. (1994). Fuzzy set theory and its applications. Boston: Kluwer Academic Publishers.
Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to order companies: Results from an empirical analysis. International journal Production Economics, 112, 919-933.
Albayrak, E., & Erensal, Y. C. (2004). Using analytic hierarchy process (AHP) to improve human performance. An application of multiple criteria decision making problem. Journal of Intelligent Manufacturing, 15, 491-503.
Alidaee, B., Kochenberger, G. A., & Amini, M. M. (2001). Greedy solutions of selection and ordering problems. European Journal of Operational Research, 134, 203-215.
Amiri, P. M. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 37, 6218-6224.
Arredondo, F., & Martinez, E. (2010). Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing. Computers & Industrial Engineering, 58, 70-83.
Badri, M. A. (2001). A combined AHP–GP model for quality control systems. International Journal of Production Economics, 72, 27-40.
Balakrishnan, N., Patterson, J. W., & Sridharan, V. (1999). Robustness of capacity rationing policies. European Journal of Operational Research, 115, 328-38.
Balakrishnan, N., Sridharan, V., & Patterson, J. W. (1996). Rationing capacity between two product classes. Decision Science, 27(2), 185-214.
Balli, S., & Koruko?lu, S. (2009). Operating system selection using fuzzy AHP and TOPSIS methods. Mathematical and Computational Applications, 14(2), 119-130.
Bellman, R. E., & Zadeh, L. A. (1970). Decision making in a Fuzzy environment, Management Science. 17(4), 141-164.
Boender, C. G. E., de Graan, J. G., & Lootsma, F. A. (1989). Multicriteria decision analysis with fuzzy pairwise comparisons. Fuzzy Sets and Systems, 29, 133-143.
Benyoucef, M., & Canbolat, M. S. (2007). Fuzzy AHP based supplier selection in e-procurement. International Journal of Services and Operations Management, 3(2), 172-192.
Bottani, E., & Rizzi, A. (2005). A fuzzy multi-attribute framework for supplier selection in an e-procurement environment. International Journal of Logistics: Research and Applications, 8(3), 249-266.
Bozbura, F. T., Beskese, A., & Kahraman C. (2007). Prioritization of human capital measurement indicators using fuzzy AHP. Expert Systems with Applications, 32(2), 1100-1112.
Buckley, J. J. (1985). Fuzzy hierarchical analysis. Fuzzy Sets and Systems, 17, 233-247.
Cakir, O., & Canbolat, M. S. (2008). A web-based decision support system for multi-criteria inventory classification using fuzzy AHP methodology. Expert Systems with Applications, 35, 1367-1378.
Chamodrakas, I., Batis, D., & Martakos, D. (2010). Supplier selection in electronic marketplaces using satisficing and fuzzy AHP. Expert Systems with Applications, 37, 490-498.
Chan, F. T. S., & Kumar N. (2007). Global supplier development considering risk factors using fuzzy extended AHP-based approach. Omega, 35,417-431.
Chang, D. Y. (1996). Application of the Extent Analysis Method on fuzzy AHP. European Journal of Operational Research, 95, 649-655.
Chen, P. C. (2009). A Fuzzy Multiple Criteria Decision Making Model in Employee Recruitment. International Journal of Computer Science and Network Security, 9(7), 113-117.
Chen,S. J., & Hwang, C. L. (1992). Fuzzy Multiple Attribute Decision Making: Methods and Applications, Springer-Verlag, Berlin.
Cheng, C. H., Yang, & K. L., & Hwang, C. L. (1999). Evaluating attack helicopters by AHP based on linguistic variable weight. European Journal of Operational Research, 116, 423-435.
Chin, K. S., Pun, K. F., Xu, Y., & Chan, J. S. F. (2002). An AHP based study of critical factors for TQM implementation in Shanghai manufacturing industries. International Journal of Technical Innovation and Entrepreneurship, 22(2), 707-715.
Condon, E., Golden, B., & Wasil, E. (2003). Visualizing group decisions in the AHP. Computers & Operations Research, 30, 1435-1445.
Dagdeviren, M., Yavuz, S., & K?l?nc, N. (2009). Weapon selection using the AHP and TOPSIS methods under fuzzy environment. Expert Systems with Applications, 36, 8143-815.
Dagdeviren, M., & Yüksel, I. (2008). Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management. Information Science, 178,1717-1733.
Defregger, F., & Kuhn, H. (2004). Revenue management in manufacturing. In Operations Research Proceedings ,17-22.
Duran, O., & Aguilo, J. (2008). Computer-aided machine-tool selection based on a Fuzzy-AHP approach. Expert Systems with Applications, 34 ,1787-1794.
Ebben, M. J. R., Hans, E. W., & Weghuis, O. F. M. (2005).Workload based order acceptance in job shop environments. OR Spectrum, 27, 107-122.
Flores, B. E., Olson, D. L., & Dorai, V. K. (1992). Management of multicriteria inventory classification. Mathematical and Computer Modeling, 16(12), 71-82.
Forman, E. H., & Selly, M. A. (2001). Decision by Objectives, Mailand Press.
Ghodsypour S. H., & O’Brien, C. (1998). A decision support system for supplier selection using an integrated analytical hierarchy process and linear programming. International Journal of Production Economics, 56, 199-212.
Ghosh, J. B. (1997). Job selection in a heavily loaded shop. Computers & Operations Research, 24(2), 141-145.
Guerrero, H. H., & Kern G. (1990). A conceptual model for demand management in the assemble-to-order environment. Journal of Operations Management, 9(1), 65-83.
Herbots, J., Herroelen, W. S., Leus, R., & Demeulemeester, E. L. (2007). Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment. MISTA.
Hosseinzadeh Lotfi, F., Allahviranloo, T., Alimardani Jondabeh, M., & Kiani, N. A. (2007). A new method for complex decision making based on TOPSIS for complex decision making problems with fuzzy data, Applied Mathematical Sciences, 1(60) , 2981-2987.
Hing, M. M., Van Harten, A., & Schuur, P. (2007). Reinforcement learning versus heuristics for order acceptance on a single resource. Journal of Heuristics, 13,167–187.
Hing, M. M., van Harten, A., & Schuur, P. (2002). Order acceptance with reinforcement learning, Working paper WP-66, University of Twente, the Netherlands.
Hwang, C. L., & Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications, Springer, Berlin Heidelberg.
Ivanescu, V. C. (2004). Order acceptance under uncertainty in batch process industries. Eindhoven :Technische Universiteit Eindhoven.
Jablonsky, J. (2007). Measuring the efficiency of production units by AHP models. Mathematical and Computer Modelling, 46, 1091-1098.
Jadidi, O., Hong, T. S., Firouzi, F., Yusuff, R. M., & Zulkifli, N. (2008). TOPSIS and fuzzy multi-objective model integration for supplier selection problem. Journal of Achievements in Materials and Manufacturing Engineering, 31(2), 762–769.
Jahanshahloo, G. R., Lotfi, F. H., & Izadikhah, M. (2006). Extension of the TOPSIS method for decision-making problems with fuzzy data. Applied Mathematics and Computation, 181(2), 1544-1551.
Jalora , A. (2006). Order acceptance and scheduling at a make-to-order system using revenue management, Ph.D. thesis, University of Texas A & M University.
Jee, D. H., & Kang, J. K. (2000). A method for optimal material selection aided with decision making theory. Materials and Design, 21(3), 199-206.
Kahraman, C., Cebeci, U., & Ruan, D. (2004). Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey. International journal Production Economics, 87, 171-184.
Kahraman, C., Cebeci, U., & Ulukan, Z. (2003). Multicriteria supplier selection using Fuzzy AHP. Logistics Information Management, 16(6), 382-394.
Kahraman, C., Ruan, D., & Dogan, I. (2003). Fuzzy group decision-making for facility location selection. Information Sciences, 157, 135-153.
Kahraman, C., Ruan D. & Tolga, E. (2002). Capital budgeting techniques using discounted fuzzy versus probabilistic cash flows. Information Sciences, 142, 57-76.
Karimi, M. S., Zulkornain, Y., & Law, S. H. (2010). Location Decision for Foreign Direct Investment in ASEAN Countries: A TOPSIS Approach. International Research Journal of Finance and Economics, ISSN 1450-2887 Issue 36.
Kaufmann, A., & Gupta, M. M. (1991). Introduction to Fuzzy Arithmetic: Theory and Applications. Van Nostrand-Reinhold, New York.
Kniker, T. S., & Burman, M. H. (2001). Applications of revenue management to manufacturing, In Third AEGEAN International Conference on Design and Analysis of Manufacturing Systems, Tinos Island, Greece, 299-308.
Korpela, J., Kylaheiko, K., Lehmusvaara, A., & Tuominen, M. (2002). An analytic approach to production capacity allocation and supply chain design. International Journal of Production Economics, 78(2),187-195.
Kulak, O., & Kahraman, C. (2005). Fuzzy multi-attribute selection among transportation companies using axiomatic design and analytic hierarchy process. Information Sciences, 170, 191-210.
kumar, S., & Mahapatra , S. S. (2009). A fuzzy multi-criteria decision making approach for supplier selection in supply chain management. African Journal of Business Management, 3 (4), 168-177.
Laarhoven, V., & Pedrycz, P. J. (1983). A fuzzy extension of Saaty & apos; s priority theory. Fuzzy Sets and Systems 11, 229-241.
Lee, A. H. I., Chen, W. C., & Chang, C. J. (2008). A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan. Expert Systems with Applications, 34(1), 96-107.
Lee, J. W., & Kim, S. H. (2001). An integrated approach for interdependent information system project selection. International Journal of Project Management, 19, 111-118.
Lewis, H. F., & Slotnick, S. A. (2002). Multi-period job selection: Planning workloads to maximize profit. Computers and Operations Research, 29, 1081-1098.
Li, T. S., & Huang, H. H. (2009). Applying TRIZ and Fuzzy AHP to develop innovative design for automated manufacturing systems. Expert Systems with Applications, 36, 8302-8312.
Liang, G. S., & Wang, M. J. (1994). Personnel selection using fuzzy MCDM algorithm. European Journal of Operational Research, 78, 22-33.
Lin, M. C., Wang, C. C., Chen, M. S., & Chang, C. A. (2008). Using AHP and TOPSIS approaches in customer-driven product design process. Computers in Industry, 59, 17-31.
Mula, J., Poler, R., Garc?´a-Sabater, J. P., & Lario, F. C. (2006). Models for production planning under uncertainty: A review. International journal Production Economics, 103, 271-285.
Nandi, A., & Rogers, P. (2003). Behavior of an order release mechanism in a make-to order Manufacturing system with selected order acceptance. In Proceedings of the 2003 winter simulation conference,1251–1259.
Murtaza, M. B. (2003). Fuzzy-AHP application to country risk assessment. American Business Review, 21(2), 109-116.
Nandi, A., & Rogers, P. (2004). Using simulation to make-to-order acceptance/rejection decision. Simulation, 80, 131-142.
Ngai, E. W. T., & Chan, E. W. C. (2005). Evaluation of knowledge management tools using AHP. Expert Systems with Applications, 29, 889-899.
Ono, K., & Jones, C. (1973). An heuristic approach to acceptance rules in integrated scheduling systems. Journal of Operations Research Society of Japan, 16, 37-58.
Onüt, S., & Soner, S. (2007). Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment. Waste Management, 28(9),1552-1559.
Partovi, F. Y. (2007). An analytical model of process choice in the chemical industry. International Journal of Production Economics, 105, 213-227.
Ramanathan, R., & Ganesh, L. S. (1995). Using AHP for resource allocation problems. European Journal of Operational Research, 80(2), 410-417.
Rogers, P., & Nandi, A. (2007). Judicious order acceptance and order release in make- to-order manufacturing systems. Production Planning and Control, 18(7), 610-625.
Rom, W. O., & Slotnick, S. A. (2009). Order acceptance using genetic algorithms. Computers & Operations Research, 36, 1758 – 1767.
Roundy, R., Chen, D., Chen, P., Cakanyildirim, M., Freimer M. B., & Melkonian, V. (2005). Acceptance of customer orders for a multi-stage batch manufacturing system: models and algorithms, IIEransactions, 37(12), 1093-105.
Shyur, H. J. (2006). COTS evaluation using modified TOPSIS and ANP. Applied Mathematics and Computation, 177, 251-259.
Slotnick, S. A., & Morton, T. E. (1996). Selecting jobs for a heavily loaded shop with lateness penalties. Computers & Operations Research, 23(2), 131-140.
Slotnick, S. A., & Morton T. E. (2007). Order acceptance with weighted tardiness. Computers & Operations Research, 34, 3029-3042.
Snoek, M. (2000). Neuro-genetic order acceptance in a job shop setting. Proceedings of the 7th international conference on Neural Information Processing, Taejon, Korea, 815-819.
Soman, C. A., Donk, V. D. P., & Gaalman G. (2004). Combined make-to-order and make-to-stock in a food production system, International Journal of Production Economics, 90, 223-235
Srdjevic, B. (2007). Linking analytic hierarchy process and social choice methods to support group decision-making in water management. Decision Support Systems, 42, 2261-2273.
Sun, C. C. (2010). A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert Systems with Applications,37(12), 7745-7754.
Taskin, G. A. (2008). Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology. Expert Systems with Applications, 36, 4067-4074.
Taylor, F. A., Ketcham, A. F., & Hoffman, D. (1998). Personnel evaluation with AHP. Management Decision, 36, 679-685.
Ten Kate, H. A. (1994). Towards a better understanding of order acceptance. International Journal of Production Economics, 37, 139-152.
Ten Kate, H. A. (1995). Order acceptance and production control, Ph.D. thesis, University of Groningen.
Teodorovic, D. (1985). Multi-criteria ranking of air shuttle alternatives. Transportation Research Part B: Methodological, 19(1), 63-72.
Tolga, E., Demircan, M. L., & Kahraman, C. (2005). Operating system selection using fuzzy replacement analysis and analytic hierarchy process. International Journal of Production Economics, 97(1), 89-117.
Wang, J., Yang, J., Q., & Lee, H. (1994). Multicriteria order acceptance decision support in over-demanded job shops: a neural network approach. Mathematical Computer Modelling, 19(5), 1-19.
Wang, T. C., & Chen, Y. H. (2008). Applying fuzzy linguistic preference relations to the improvement of consistency of fuzzy AHP. Information Sciences, 178, 3755-3765.
Wang, T. C., & Lee, H. D. (2009). Developing a fuzzy TOPSIS approach based on subjective weights and objective weights. Expert Systems with Applications, 36, 8980-8985.
Wu, M. (2007). Topsis-AHP simulation model and its application to supply chain management. World Journal of Modelling and Simulation, 3, 196-201.
Wu, M. C., & Chen, S. Y. (1997). A multiple criteria decision-making model for justifying the acceptance of rush orders. Prouduction planning & control, 8(8), 753- 761.
Yong, D. (2006). Plant location selection based on fuzzy TOPSIS. International Journal of Advanced Manufacturing Technology, 28, 839-844.
Yu, C. S. (2002). A GP-AHP method for solving group decision-making fuzzy AHP problems. Computers and Operations Research, 29, 1969-2001.
Zanakis, S. H., Solomon, Wishart, A. N., & Dublish, S. (1998). Multi-attribute decision making: A simulation comparison of selection methods. European Journal of Operational Research, 107, 507-529.
Zhang, B., & Shaofu, D. (2010). Multi-product newsboy problem with limited capacity and outsourcing. European Journal Operational Research, 202, 107-113.
Zimmermann, H. J. (1994). Fuzzy set theory and its applications. Boston: Kluwer Academic Publishers.
Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to order companies: Results from an empirical analysis. International journal Production Economics, 112, 919-933.