Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (96)
  • HE (32)
  • SCI (26)

IJIEC Volumes

    • Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)
    • Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • Volume 3 (76)
      • Issue 1 (9)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • Volume 17 (21)
      • Issue 1 (21)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(111)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Trust(83)
TOPSIS(83)
Financial performance(83)
Sustainability(82)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Artificial intelligence(77)
Knowledge Management(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2184)
Indonesia(1290)
India(788)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries

International Journal of Industrial Engineering Computations

ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 14 Issue 2 pp. 323-340 , 2023

Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem Pages 323-340 Right click to download the paper Download PDF

Authors: Yuan-Shyi Peter Chiu, Ting-Fang Yan, Singa Wang Chiu, Hui-Chi Wang, Tiffany Chiu

DOI: 10.5267/j.ijiec.2023.1.001

Keywords: Multiproduct production-shipping problem, Delayed differentiation, Rework, Multi-delivery, Overtime, Outsourcing

Abstract: This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.

How to cite this paper
Chiu, Y., Yan, T., Chiu, S., Wang, H & Chiu, T. (2023). Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem.International Journal of Industrial Engineering Computations , 14(2), 323-340.

Refrences
Bailey, J.P., & Rabinovich, E. (2006). The adoption of inventory postponement and speculation: An empirical assessment of oligopolistic Internet retailers. Transportation Research Part E: Logistics and Transportation Review, 42(4), 258-271.
Bruneel, H., Maertens, T., & Walraevens, J. (2014). Class clustering destroys delay differentiation in priority queues. European Journal of Operational Research, 235(1), 149-158.
Budiman, S.D., & Rau, H. (2021). A stochastic model for developing speculation-postponement strategies and modularization concepts in the global supply chain with demand uncertainty. Computers and Industrial Engineering, 158, Art. No. 107392.
Chiu, Y.-S.P., Wang, Y., Chou, C.-L., & Chiu, T. (2020a). A two-stage multiproduct EMQ-based model with delayed differentiation and overtime option for common part’s fabrication. Journal of Applied Research and Technology, 18(5), 259-268.
Chiu, Y. S. P., Jhan, J. H., Chiu, V., & Chiu, S. W. (2020b). Fabrication cycle time and shipment decision for a multiproduct intra-supply chain system with external source and scrap. International Journal of Mathematical, Engineering and Management Sciences, 5(4), 614-630.
Chiu, S.W., Wu, H.-Y., Yeh, T.-M., & Wang, Y. (2021a). Solving a hybrid batch production problem with unreliable equipment and quality reassurance. International Journal of Industrial Engineering Computations, 12(3), 235-248.
Chiu, S.W., Chiu, V., Hwang, M.-H., & Chiu, Y.-S.P. (2021b). A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance. International Journal of Industrial Engineering Computations, 12(2), 143-158.
Chiu, Y.-S.P., Wang, Y., Yeh, T.-M., & Chiu, S.W. (2022a). Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime. International Journal of Industrial Engineering Computations, 13(3), 293-308.
Chiu, Y.-S.P., Chiu, S.W., Chiu, T., & Wang, H.-C. (2022b). The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning. Decision Science Letters, 11 4), 529-544.
Çimen, T., Baykasoğlu, A., & Akyol, S.D. (2022). Assembly line rebalancing and worker assignment considering ergonomic risks in an automotive parts manufacturing plant. International Journal of Industrial Engineering Computations, 13(3), 363-384.
Dabhilkar, M., & Bengtsson, L. (2008). Invest or divest? on the relative improvement potential in outsourcing manufacturing. Production Planning and Control, 19(3), 212-228.
Davila, T., & Wouters, M. (2007). An empirical test of inventory, service and cost benefits from a postponement strategy. International Journal of Production Research, 45(10), 2245-2267.
Freeman, N.K., Mittenthal, J., & Melouk, S.H. (2014). Parallel-machine scheduling to minimize overtime and waste costs. IIE Transactions (Institute of Industrial Engineers), 46(6), 601-618.
Friesen, J. (2001). Overtime pay regulation and weekly hours of work in Canada. Labour Economics, 8(6), 691-720.
Graman, G. A., & Magazine, M. J. (2006). Implementation issues influencing the decision to adopt postponement. International Journal of Operations & Production Management, 26(10), 1068-1083.
Granot, D., & Yin, S. (2008). Price and order postponement in a decentralized newsvendor model with multiplicative and price-dependent demand. Operations Research, 56(1), 121-139.
Guide Jr., V.D.R., & Srivastava, R. (1997) Repairable inventory theory: Models and applications. European Journal of Operational Research, 102(1), 1-20.
Handley, S., Skowronski, K., & Thakar, D. (2022). The single-sourcing versus multisourcing decision in information technology outsourcing. Journal of Operations Management, 68(6-7), 702-727.
Herrera, O., Jerez, V., Arrieta, N., & Camacho, G. (2022). Transshipment and routing model for multi-product planning and distribution at a refreshment company in Bogota, Colombia. Journal of Applied Research and Technology, 20(4), 408-417.
Hidayat, C.W., Sulistyo, Wilujeng, S., Chrismardani, Y., & Wahab (2022). Human resource competencies, supply chain management, and financial performance. Uncertain Supply Chain Management, 10(2), 471-476.
Hlioui, R., Gharbi, A., & Hajji, A. (2015). Replenishment, production and quality control strategies in three-stage supply chain. International Journal of Production Economics, 166, 90-102.
Hofer, A.R., Knemeyer, A.M., & Murphy, P.R. (2015). Achieving and exceeding logistics outsourcing expectations in Brazil: A replication study. Transportation Journal, 54(3), 339-367.
Khurosani, A., Nupus, H., & Ganika, G. (2021). The role of green human resource management in creating green supply chain culture in a service industry. Uncertain Supply Chain Management, 9(4), 973-982.
Loos, M.J., & Rodriguez, C.M.T. (2015). Practical application of postponement in a textile company. Producao, 25 (4), 894-910.
Malladi, S.S., Erera, A.L., & White, C.C., III (2021). Managing mobile production-inventory systems influenced by a modulation process. Annals of Operations Research, 304(1-2), 299-330.
Moon, I., Lee, J.-H., & Seong, J. (2012). Vehicle routing problem with time windows considering overtime and outsourcing vehicles. Expert Systems with Applications, 39(18), 13202-13213.
Olson, D.L. (2007). Evaluation of ERP outsourcing. Computers and Operations Research, 34(12), 3715-3724.
Prataviera, L.B., Moretti, E., & Tappia, E. (2022). Coping with the postponement boundary problem: an empirical investigation in global food supply chains. International Journal of Logistics Management, 33(2), 687-711.
Purusotham, S., Kumar, T.J., Vimala, T., & Ghanshyam, K.J. (2022). An efficient hybrid genetic algorithm for solving truncated travelling salesman problem. Decision Science Letters, 11(4), 473-484.
Quttineh, N.-H., & Lidestam, H. (2020). Applying heuristics in supply chain planning in the process industry. International Journal of Industrial Engineering Computations, 11(4), 585-606.
Ruiz-Torres, A.J., & Mahmoodi, F. (2006). A supplier allocation model considering delivery failure, maintenance and supplier cycle costs. International Journal of Production Economics, 103(2), 755-766.
Siregar, H., Suroso, A.I., Siregar, H., & Djohar, S. (2022). Development of efficient strategies to optimize production efficiency: Evidence from Pine chemical industry. Decision Science Letters, 11(4), 419-430.
Suharmono, M., Alexandri, M.B., Sumadinata, R.W.S., & Muhyi, H.A. (2022). Outsourcing in supply chain: A bibliometric analysis. Uncertain Supply Chain Management, 10(4), 1501-1508.
Sung, P.-C., Lai, C.-M., Wang, Y., & Chiu, Y.-S.P. (2022). Minimization of multiproduct fabrication cost featuring rework, commonality, external provider, and postponement. Uncertain Supply Chain Management, 10(2), 353-364.
Suryanto, T., & Mukhsin, M. (2020). Mediation of supply chain integration on the relationship between market orientation with company performance. Uncertain Supply Chain Management, 8(4), 739-744.
Taleizadeh, A. A., Jalali-Naini, S. G., Wee, H. M., & Kuo, T. C. (2013). An imperfect multi-product production system with rework. Scientia Iranica, 20(3), 811-823.
Taleizadeh, A. A., Cárdenas-Barrón, L. E., & Mohammadi, B. (2014). A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. International Journal of Production Economics, 150, 9-27.
Taş, D., Gendreau, M., Jabali, O., & Jans, R. (2019) A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273(1), pp. 146-159.
Tookanlou, P.B., & Wong, H. (2020). Determining the optimal customization levels, lead times, and inventory positioning in vertical product differentiation. International Journal of Production Economics, 221, Art. No. 107479.
Van Hoek, R.I (2001). Rediscovery of postponement a literature review and directions for research. Journal of Operations Management, 19(2), 161-184.
Yang, B., Burns, N. D., & Backhouse, C. J. (2004). Management of uncertainty through postponement. International Journal of Production Research, 42(6), 1049-1064.
Yu, P., Su, J., Gao, Q., Li, M., & Niou, C. (2007, June). Study of aluminum pad contamination sources during wafer fabrication, shipping, storage and assembly. In 2007 International Symposium on High Density packaging and Microsystem Integration, pp. 1-3. IEEE doi: 10.1109/HDP.2007.4283573.
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: International Journal of Industrial Engineering Computations | Year: 2023 | Volume: 14 | Issue: 2 | Views: 1155 | Reviews: 0

Related Articles:
  • A hybrid delayed differentiation multiproduct EPQ model with scrap and end- ...
  • Investigating the collective impact of postponement, scrap, and external su ...
  • Minimizing operating expenditures for a manufacturing system featuring qual ...
  • Multi-item fabrication-shipment decision model featuring multi-delivery, po ...
  • Minimization of multiproduct fabrication cost featuring rework, commonality ...

Add Reviews

Name:*
E-Mail:
Review:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
winkwinkedsmileam
belayfeelfellowlaughing
lollovenorecourse
requestsadtonguewassat
cryingwhatbullyangry
Security Code: *
Include security image CAPCHA.
Refresh Code

® 2010-2026 GrowingScience.Com