Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » International Journal of Industrial Engineering Computations » A two-agent scheduling problem in a two-machine flowshop

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (57)
  • SCI (53)

IJIEC Volumes

    • ▼ Volume 17 (113)
      • Issue 1 (21)
      • Issue 2 (30)
      • Issue 3 (26)
      • Issue 4 (36)
    • ▼ Volume 16 (75)
      • Issue 1 (12)
      • Issue 2 (15)
      • Issue 3 (19)
      • Issue 4 (29)
    • ▼ Volume 15 (55)
      • Issue 1 (19)
      • Issue 2 (15)
      • Issue 3 (12)
      • Issue 4 (9)
    • ▼ Volume 14 (50)
      • Issue 1 (11)
      • Issue 2 (15)
      • Issue 3 (9)
      • Issue 4 (15)
    • ▼ Volume 13 (41)
      • Issue 1 (10)
      • Issue 2 (8)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 12 (29)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 11 (36)
      • Issue 1 (9)
      • Issue 2 (8)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 10 (34)
      • Issue 1 (8)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (8)
    • ▼ Volume 9 (32)
      • Issue 1 (9)
      • Issue 2 (6)
      • Issue 3 (7)
      • Issue 4 (10)
    • ▼ Volume 8 (30)
      • Issue 1 (9)
      • Issue 2 (7)
      • Issue 3 (8)
      • Issue 4 (6)
    • ▼ Volume 7 (47)
      • Issue 1 (10)
      • Issue 2 (14)
      • Issue 3 (10)
      • Issue 4 (13)
    • ▼ Volume 6 (39)
      • Issue 1 (7)
      • Issue 2 (12)
      • Issue 3 (10)
      • Issue 4 (10)
    • ▼ Volume 5 (47)
      • Issue 1 (13)
      • Issue 2 (12)
      • Issue 3 (12)
      • Issue 4 (10)
    • ▼ Volume 4 (50)
      • Issue 1 (14)
      • Issue 2 (10)
      • Issue 3 (12)
      • Issue 4 (14)
    • ▼ Volume 3 (77)
      • Issue 1 (10)
      • Issue 2 (15)
      • Issue 3 (20)
      • Issue 4 (12)
      • Issue 5 (20)
    • ▼ Volume 2 (68)
      • Issue 1 (12)
      • Issue 2 (20)
      • Issue 3 (20)
      • Issue 4 (16)
    • ▼ Volume 1 (17)
      • Issue 1 (9)
      • Issue 2 (8)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Sustainability(94)
Tehran Stock Exchange(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
International Journal of Industrial Engineering Computations
ISSN 1923-2934 (Online) - ISSN 1923-2926 (Print)
Quarterly Publication
Volume 9 Issue 3 pp. 289-306, 2018

A two-agent scheduling problem in a two-machine flowshop Pages 289-306 PDF Download PDF

Authors: Mohammad-Hasan Ahmadi-Darani, Ghasem Moslehi, Mohammad Reisi-Nafchi

📋 Author Affiliations:
Mohammad-Hasan Ahmadi-Darani, Ghasem Moslehi ORCID , Mohammad Reisi-Nafchi ORCID
¹ Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan, 84156-83111, Iran
doi 10.5267/j.ijiec.2017.8.005
15 Source: Scopus
Crossref 10 Source: CrossRef

🔑 Keywords: Scheduling, Flowshop, Two-agent, Mathematical programming, Tabu search

Abstract: In recent years, many studies on the multi-agent scheduling problems in which agents compete for using the shared resources, have been performed. However, relatively few studies have been undertaken in the field of the multi-agent scheduling in a flowshop environment. To bridge the gap, this paper aims at addressing the two-agent scheduling problem in a two-machine flowshop. Because of the importance of delay penalties and efficient resource utilization in many manufacturing environments, the objective is to find an optimal schedule which has the minimum total tardiness for the first agent’s jobs, under the makespan limitation for the second agent. Since this problem is strongly NP-hard, several theorems and properties of the problem are proposed to apply in exact and meta-heuristic methods. Also, for some instances of the problem for which exact methods cannot achieve optimal solutions in a reasonable amount of time, a tabu search algorithm is developed to achieve near-optimal solutions. Computational results of the tabu search algorithm show that the average absolute error value is lower than 0.18 percent for instances with 20 to 60 jobs in size.

How to cite this paper
APA: Ahmadi-Darani, M., Moslehi, G & Reisi-Nafchi, M. (2018). A two-agent scheduling problem in a two-machine flowshop. International Journal of Industrial Engineering Computations, 9(3), 289-306.
Chicago/Turabian: Ahmadi-Darani, M., Moslehi, G & Reisi-Nafchi, M. 2018. "A two-agent scheduling problem in a two-machine flowshop." International Journal of Industrial Engineering Computations 9, no. 3 (2018): 289-306.
AMA: Ahmadi-Darani, M., Moslehi, G & Reisi-Nafchi, M. A two-agent scheduling problem in a two-machine flowshop. International Journal of Industrial Engineering Computations. 2018;9(3):289-306.

References
Agnetis, A., Billaut, J.-C., Gawiejnowicz, S., Pacciarelli, D., & Souhal, A. (2014). Multi-agent scheduling. Berlin: Springer Berlin Heidelberg.
Agnetis, A., Mirchandani, P. B., Pacciarelli, D., & Pacifici, A. (2004). Scheduling Problems with Two Competing Agents. Operations Research, 52(2), 229-242. doi:10.2307/30036575
Agnetis, A., Pacciarelli, D., & Pacifici, A. (2007). Multi-agent single machine scheduling. Annals of Operations Research, 150(1), 3-15. doi:10.1007/s10479-006-0164-y
Akkan, C., & Karabatı, S. (2004). The two-machine flowshop total completion time problem: Improved lower bounds and a branch-and-bound algorithm. European Journal of Operational Research, 159(2), 420-429.
Baker, K. R., & Smith, J. C. (2003). A multiple-criterion model for machine scheduling. Journal of Scheduling, 6(1), 7-16.
Chandra, P., Mehta, P., & Tirupati, D. (2009). Permutation flow shop scheduling with earliness and tardiness penalties. International Journal of Production Research, 47(20), 5591-5610.
Cheng, T. E., Wu, W.-H., Cheng, S.-R., & Wu, C.-C. (2011). Two-agent scheduling with position-based deteriorating jobs and learning effects. Applied Mathematics and Computation, 217(21), 8804-8824.
Della Croce, F., Ghirardi, M., & Tadei, R. (2002). An improved branch-and-bound algorithm for the two machine total completion time flow shop problem. European Journal of Operational Research, 139(2), 293-301.
Della Croce, F., Narayan, V., & Tadei, R. (1996). The two-machine total completion time flow shop problem. European Journal of Operational Research, 90(2), 227-237.
Fan, B. Q., & Cheng, T. C. E. (2016). Two-agent scheduling in a flowshop. European Journal of Operational Research, 252(2), 376-384. doi:10.1016/j.ejor.2016.01.009
Gajpal, Y., Dua, A., & Sahu, S. N. (2014). Heuristics for single machine scheduling under competition to minimize total weighted completion time and makespan objectives. Lecture Notes in Management Science, 6, 99-105.
Glover, F. (1989). Tabu search-part I. ORSA Journal on computing, 1(3), 190-206.
Glover, F. (1990). Tabu search—part II. ORSA Journal on computing, 2(1), 4-32.
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. R. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287-326.
Haouari, M., & Kharbeche, M. (2013). An assignment-based lower bound for a class of two-machine flow shop problems. Computers & Operations Research, 40(7), 1693-1699.
Hoogeveen, J., & Velde, S. v. d. (1995). Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time. Operations Research Letters, 205-208.
Johnson, S. M. (1954). Optimal two‐and three‐stage production schedules with setup times included. Naval research Logistics Quarterly, 1(1), 61-68.
Józefowska, J., Jurisch, B., & Kubiak, W. (1994). Scheduling shops to minimize the weighted number of late jobs. Operations Research Letters, 16(5), 277-283.
Kellerer, H., & Strusevich, V. A. (2010). Fully polynomial approximation schemes for a symmetric quadratic knapsack problem and its scheduling applications. Algorithmica, 57(4), 769-795.
Kharbeche, M., & Haouari, M. (2012). MIP models for minimizing total tardiness in a two-machine flow shop. Journal of the Operational Research Society, 64(5), 690-707.
Kim, Y.-D. (1993). A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops. Computers & Operations Research, 20(4), 391-401.
Lee, W.-C., Chen, S.-K., Chen, C.-W., & Wu, C.-C. (2011). A two-machine flowshop problem with two agents. Computers & Operations Research, 38(1), 98-104. doi:10.1016/j.cor.2010.04.002
Lee, W.-C., Chen, S.-k., & Wu, C.-C. (2010). Branch-and-bound and simulated annealing algorithms for a two-agent scheduling problem. Expert Systems with Applications, 37(9), 6594-6601.
Lei, D. (2015). Variable neighborhood search for two-agent flow shop scheduling problem. Computers & Industrial Engineering, 80, 125-131. doi:http://dx.doi.org/10.1016/j.cie.2014.11.024
Lenstra, J. K., Kan, A. R., & Brucker, P. (1977). Complexity of machine scheduling problems. Annals of Discrete Mathematics, 1, 343-362.
Leung, J. Y. T., Pinedo, M., & Wan, G. (2010). Competitive Two-Agent Scheduling and Its Applications. Operations Research, 58(2), 458-469. doi:10.2307/40605929
Liu, P., Yi, N., Zhou, X., & Gong, H. (2013). Scheduling two agents with sum-of-processing-times-based deterioration on a single machine. Applied Mathematics and Computation, 219(17), 8848-8855.
Luo, W., Chen, L., & Zhang, G. (2012). Approximation schemes for two-machine flow shop scheduling with two agents. Journal of Combinatorial Optimization, 24(3), 229-239.
M’Hallah, R. (2014). Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP. Computers & Industrial Engineering, 75, 142-156.
Pan, J. C.-H., Chen, J.-S., & Chao, C.-M. (2002). Minimizing tardiness in a two-machine flow-shop. Computers & Operations Research, 29(7), 869-885.
Pan, J. C.-H., & Fan, E.-T. (1997). Two-machine flowshop scheduling to minimize total tardiness. International Journal of Systems Science, 28(4), 405-414.
Perez-Gonzalez, P., & Framinan, J. M. (2014). A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems. European Journal of Operational Research, 235(1), 1-16. Pinedo, M. (2002). Scheduling-Theory, Algorithms, and Analysis. New Jersey: Prentice-Hall.
Schaller, J. (2005). Note on minimizing total tardiness in a two-machine flowshop. Computers & Operations Research, 32(12), 3273-3281.
Sen, T., Dileepan, P., & Gupia, J. N. (1989). The two-machine flowshop scheduling problem with total tardiness. Computers & Operations Research, 16(4), 333-340.
Shiau, Y.-R., Tsai, M.-S., Lee, W.-C., & Cheng, T. C. E. (2015). Two-agent two-machine flowshop scheduling with learning effects to minimize the total completion time. Computers & Industrial Engineering, 87, 580-589.
Wu, C.-C., Huang, S.-K., & Lee, W.-C. (2011). Two-agent scheduling with learning consideration. Computers & Industrial Engineering, 61(4), 1324-1335.
Wu, W.-H. (2014). Solving a two-agent single-machine learning scheduling problem. International Journal of Computer Integrated Manufacturing, 27(1), 20-35.
Wu, W.-H., Xu, J., Wu, W.-H., Yin, Y., Cheng, I. F., & Wu, C.-C. (2013). A tabu method for a two-agent single-machine scheduling with deterioration jobs. Computers & Operations Research, 40(8), 2116-2127. doi:10.1016/j.cor.2013.02.025
Yin, Y., Cheng, S.-R., & Wu, C.-C. (2012a). Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties. Information Sciences, 189, 282-292. doi:10.1016/j.ins.2011.11.035
Yin, Y., Wu, W.-H., Cheng, S.-R., & Wu, C.-C. (2012b). An investigation on a two-agent single-machine scheduling problem with unequal release dates. Computers & Operations Research, 39(12), 3062-3073.
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: International Journal of Industrial Engineering Computations | 📅 Year: 2018 | 📖 Volume: 9 | 📄 Issue: 3 | 👁️ Views: 2673 | 📊 Crossref: 10

Related Articles:
  • A genetic algorithm for preemptive scheduling of a single machine
  • M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan
  • Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints
  • Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times
  • Just-in-time preemptive single machine problem with costs of earliness/tardiness, interruption and work-in-process

📝 Ready to share your research?

International Journal of Industrial Engineering Computations is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com