How to cite this paper
Kundu, S & Chakrabarti, T. (2015). An integrated multi-stage supply chain inventory model with imperfect production process.International Journal of Industrial Engineering Computations , 6(4), 568-580.
Refrences
Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17(3), 292-312.
Giri, B. C. & Chakraborty, A. (2011). Supply chain coordination for a deteriorating product under stock-dependent consumption rate and unreliable production process. International Journal of Industrial Engineering Computations, 2, 263–272.
Giri, B.C. & Sharma, S. (2014). Lot sizing and unequal-sized shipment policy for an integrated production-inventory system. International Journal of System Science, 45(5), 888-901.
Golhar, D. Y., & Sarker, B. R. (1992). Economic manufacturing quantity in a just-in time delivery system. International Journal of Production Research, 30(5), 961-972.
Goyal, S.K. (1977). Determination of optimal production quantity for a two-stage production system. Operational Research Quarterly, 28, 865-870.
Goyal, S.K., & Gupta, Y.P. (1989). Integrated inventory models: the buyer-vendor coordination. European Journal of Operational Research, 41, 261-269.
Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82(1), 209-210.
Goyal, S. K., & Nebebe, F. (2000). Determination or economic production-shipment policy for a single-vendor single buyer system. European Journal of Operational Research, 121(1), 175-178.
Haji R., Haji A., Sajadifar M., & Zolfaghari S. (2008). Lot sizing with non-zero setup times for rework. Journal of Systems Science and Systems Engineering, 17(2), 230-240.
Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality item produced. Production Planning & Control: The Management of Operations, 12(6), 584-590.
Hill, R. M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research, 97(3),493-499.
Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463-2475.
Hoque, M. (2008). Synchronizaton in the single-vendor multi-buyer integrated inventory supply chain. European Journal of Operational Research, 188(3), 811-825.
Hsu, J.T. & Hsu, L.F. (2012). An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations, 3,703–720.
Jamal, A. M. M., & Sarker, B. R. (1993). An optimal batch size for a production system operating under a just-in-time delivery system. International Journal of Production Economics, 32(2), 255-260.
Jamal, A. M. M, Sarker B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering, 47, 77-89.
Joglekar, P.N., & Tharthare, S. (1990). Individually responsible and rational decision approach to economic lot sizes for one vendor and many purchasers. Decision Sciences, 21, 450-492.
Lee, H.H., Chandra, M. J., & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8(6), 586-596.
Lee,W. (2005). A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivery. Omega-International Journal of Management Science, 33(2), 163-174.
Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323.
Sarker, B. R., & Parija, G. R. (1994). An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 45(8), 891-900.
Viswanathan, S., & Piplani, R. (2001).Coordinating supply chain inventories through common replenishment epochs. European Journal of Operational Research, 129, 277-286.
Giri, B. C. & Chakraborty, A. (2011). Supply chain coordination for a deteriorating product under stock-dependent consumption rate and unreliable production process. International Journal of Industrial Engineering Computations, 2, 263–272.
Giri, B.C. & Sharma, S. (2014). Lot sizing and unequal-sized shipment policy for an integrated production-inventory system. International Journal of System Science, 45(5), 888-901.
Golhar, D. Y., & Sarker, B. R. (1992). Economic manufacturing quantity in a just-in time delivery system. International Journal of Production Research, 30(5), 961-972.
Goyal, S.K. (1977). Determination of optimal production quantity for a two-stage production system. Operational Research Quarterly, 28, 865-870.
Goyal, S.K., & Gupta, Y.P. (1989). Integrated inventory models: the buyer-vendor coordination. European Journal of Operational Research, 41, 261-269.
Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82(1), 209-210.
Goyal, S. K., & Nebebe, F. (2000). Determination or economic production-shipment policy for a single-vendor single buyer system. European Journal of Operational Research, 121(1), 175-178.
Haji R., Haji A., Sajadifar M., & Zolfaghari S. (2008). Lot sizing with non-zero setup times for rework. Journal of Systems Science and Systems Engineering, 17(2), 230-240.
Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality item produced. Production Planning & Control: The Management of Operations, 12(6), 584-590.
Hill, R. M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research, 97(3),493-499.
Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463-2475.
Hoque, M. (2008). Synchronizaton in the single-vendor multi-buyer integrated inventory supply chain. European Journal of Operational Research, 188(3), 811-825.
Hsu, J.T. & Hsu, L.F. (2012). An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations, 3,703–720.
Jamal, A. M. M., & Sarker, B. R. (1993). An optimal batch size for a production system operating under a just-in-time delivery system. International Journal of Production Economics, 32(2), 255-260.
Jamal, A. M. M, Sarker B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering, 47, 77-89.
Joglekar, P.N., & Tharthare, S. (1990). Individually responsible and rational decision approach to economic lot sizes for one vendor and many purchasers. Decision Sciences, 21, 450-492.
Lee, H.H., Chandra, M. J., & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8(6), 586-596.
Lee,W. (2005). A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivery. Omega-International Journal of Management Science, 33(2), 163-174.
Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323.
Sarker, B. R., & Parija, G. R. (1994). An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society, 45(8), 891-900.
Viswanathan, S., & Piplani, R. (2001).Coordinating supply chain inventories through common replenishment epochs. European Journal of Operational Research, 129, 277-286.