How to cite this paper
Fekri, M., Heydari, M & Mazdeh, M. (2023). Two-objective optimization of preventive maintenance orders scheduling as a multi-skilled resource-constrained flow shop problem.Decision Science Letters , 12(1), 41-54.
Refrences
Awad, M., & Ertem, M. (2017). Stochastic scheduling of workforce-constrained preventive maintenance activities in petroleum plants. In 2017 Annual Reliability and Maintainability Symposium (RAMS) (pp.1-5). IEEE.
Azadeh, A., Fekri, M., Asadzadeh, S. M., Barazandeh, B., & Barrios, B. (2016). A unique mathematical model for maintenance strategies to improve energy flows of the electrical power sector. Energy Exploration & Exploitation, 34(1), 19-41.
Blazewicz, J., Ecker, K. H., Pesch, E., Schmidt, G., Sterna, M., & Weglarz, J. (2019). Handbook on Scheduling: From Theory to Practice. Springer.
Cheng, T. E., Lin, B. M., & Huang, H. L. (2012). Resource-constrained flow shop scheduling with separate resource recycling operations. Computers & Operations Research, 39(6), 1206-1212.
Coit, D. W., & Zio, E. (2019). The evolution of system reliability optimization. Reliability Engineering & System Safety, 192, 106259.
Cormen, T. H., Leiserson, C. E., Rivest, R. L., Stein, C. (2009). Introduction to algorithms. MIT press.
Costa, A., Fernandez-Viagas, V., & Framinan, J. M. (2020). Solving the hybrid flow shop scheduling problem with limited human resource constraint. Computers & Industrial Engineering, 146, 106545.
De Jonge, B., & Scarf, P. A. (2020). A review on maintenance optimization. European journal of operational research, 285(3), 805-824.
Golab, A., Gooya, E., Falou, A., & Cabon, M. (2022). A multilayer feed-forward neural network (MLFNN) for the resource-constrained project scheduling problem (RCPSP). Decision Science Letters, 11(4), 407-418.
Ertem, M., As' ad, R., Awad, M., & Al-Bar, A. (2022). Workers-constrained shutdown maintenance scheduling with skills flexibility: Models and solution algorithms. Computers & Industrial Engineering, 172, 108575.
Habibi, F., Barzinpour, F., & Sadjadi, S. (2018). Resource-constrained project scheduling problem: review of past and recent developments. Journal of project management, 3(2), 55-88.
Hans, E. W., Herroelen, W., Leus, R., & Wullink, G. (2007). A hierarchical approach to multi-project planning under uncertainty. Omega, 35, 563–577. doi:10.1016/j.omega.2005.10.004.
Kazemipoor, H., Tavakkoli-Moghaddam, R., & Shahnazari-Shahrezaei, P. (2002). Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing. Management Science Letters, 2(2), 681-688.
Keizer, M. C. O., Flapper, S. D. P., & Teunter, R. H. (2017). Condition-based maintenance policies for systems with multiple dependent components: A review. European Journal of Operational Research, 261(2), 405-420.
Mild, P., & Salo, A. (2009). Combining a multi attribute value function with an optimization model: An application to dynamic resource allocation for infrastructure maintenance. Decision Analysis, 6(3), 139-152.
Nguyen, K. A., Do, P., & Grall, A. (2017). Joint predictive maintenance and inventory strategy for multi-component systems using Birnbaum’s structural importance. Reliability Engineering & System Safety, 168, 249-261.
Snauwaert, J., & Vanhoucke, M. (2022). A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem. European Journal of Operational Research. https://doi.org/10.1016/j.ejor.2022.05.049
Tao, S., & Dong, Z. S. (2017). Scheduling resource-constrained project problem with alternative activity chains. Computers & Industrial Engineering, 114, 970 288–296. doi:10.1016/j.cie.2017.10.027.
Urbani, M., Brunelli, M., & Punkka, A. (2022). An approach for bi-objective maintenance scheduling on a networked system with limited resources. European Journal of Operational Research, 305(1), 101-113.
Witteman, M., Deng, Q., & Santos, B. F. (2021). A bin packing approach to solve the aircraft maintenance task allocation problem. European Journal of Operational Research, 294(1), 365-376.
Yunusoglu, P., & Topaloglu Yildiz, S. (2022). Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times. International Journal of Production Research, 60(7), 2212-2229.
Zio, E. (2009). Reliability engineering: Old problems and new challenges. Reliability engineering & system safety, 94(2), 125-141.
Azadeh, A., Fekri, M., Asadzadeh, S. M., Barazandeh, B., & Barrios, B. (2016). A unique mathematical model for maintenance strategies to improve energy flows of the electrical power sector. Energy Exploration & Exploitation, 34(1), 19-41.
Blazewicz, J., Ecker, K. H., Pesch, E., Schmidt, G., Sterna, M., & Weglarz, J. (2019). Handbook on Scheduling: From Theory to Practice. Springer.
Cheng, T. E., Lin, B. M., & Huang, H. L. (2012). Resource-constrained flow shop scheduling with separate resource recycling operations. Computers & Operations Research, 39(6), 1206-1212.
Coit, D. W., & Zio, E. (2019). The evolution of system reliability optimization. Reliability Engineering & System Safety, 192, 106259.
Cormen, T. H., Leiserson, C. E., Rivest, R. L., Stein, C. (2009). Introduction to algorithms. MIT press.
Costa, A., Fernandez-Viagas, V., & Framinan, J. M. (2020). Solving the hybrid flow shop scheduling problem with limited human resource constraint. Computers & Industrial Engineering, 146, 106545.
De Jonge, B., & Scarf, P. A. (2020). A review on maintenance optimization. European journal of operational research, 285(3), 805-824.
Golab, A., Gooya, E., Falou, A., & Cabon, M. (2022). A multilayer feed-forward neural network (MLFNN) for the resource-constrained project scheduling problem (RCPSP). Decision Science Letters, 11(4), 407-418.
Ertem, M., As' ad, R., Awad, M., & Al-Bar, A. (2022). Workers-constrained shutdown maintenance scheduling with skills flexibility: Models and solution algorithms. Computers & Industrial Engineering, 172, 108575.
Habibi, F., Barzinpour, F., & Sadjadi, S. (2018). Resource-constrained project scheduling problem: review of past and recent developments. Journal of project management, 3(2), 55-88.
Hans, E. W., Herroelen, W., Leus, R., & Wullink, G. (2007). A hierarchical approach to multi-project planning under uncertainty. Omega, 35, 563–577. doi:10.1016/j.omega.2005.10.004.
Kazemipoor, H., Tavakkoli-Moghaddam, R., & Shahnazari-Shahrezaei, P. (2002). Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing. Management Science Letters, 2(2), 681-688.
Keizer, M. C. O., Flapper, S. D. P., & Teunter, R. H. (2017). Condition-based maintenance policies for systems with multiple dependent components: A review. European Journal of Operational Research, 261(2), 405-420.
Mild, P., & Salo, A. (2009). Combining a multi attribute value function with an optimization model: An application to dynamic resource allocation for infrastructure maintenance. Decision Analysis, 6(3), 139-152.
Nguyen, K. A., Do, P., & Grall, A. (2017). Joint predictive maintenance and inventory strategy for multi-component systems using Birnbaum’s structural importance. Reliability Engineering & System Safety, 168, 249-261.
Snauwaert, J., & Vanhoucke, M. (2022). A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem. European Journal of Operational Research. https://doi.org/10.1016/j.ejor.2022.05.049
Tao, S., & Dong, Z. S. (2017). Scheduling resource-constrained project problem with alternative activity chains. Computers & Industrial Engineering, 114, 970 288–296. doi:10.1016/j.cie.2017.10.027.
Urbani, M., Brunelli, M., & Punkka, A. (2022). An approach for bi-objective maintenance scheduling on a networked system with limited resources. European Journal of Operational Research, 305(1), 101-113.
Witteman, M., Deng, Q., & Santos, B. F. (2021). A bin packing approach to solve the aircraft maintenance task allocation problem. European Journal of Operational Research, 294(1), 365-376.
Yunusoglu, P., & Topaloglu Yildiz, S. (2022). Constraint programming approach for multi-resource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times. International Journal of Production Research, 60(7), 2212-2229.
Zio, E. (2009). Reliability engineering: Old problems and new challenges. Reliability engineering & system safety, 94(2), 125-141.