Processing, Please wait...

  • Publisher Home
  • Home
  • 🔙 Back
  • 📚 Journals
    • ⚙️ IJIEC - Industrial Engineering Computations
    • 🌐 IJDNS - Data and Network Science
    • 🧪 CCL - Current Chemistry Letters
    • 💹 AC - Accounting
    • 🎯 DSL - Decision Science Letters
    • 🚛 USCM - Uncertain Supply Chain Management
    • 🏗️ JPM - Journal of Project Management
    • 🏥 HE - Healthcare Engineering
    • 📈 SCI - Scientometrica
    • 🔩 ESM - Engineering Solid Mechanics
    • 🌿 JFS - Journal of Future Sustainability
    • 💼 MSL - Management Science Letters
  • 📝 Submit Article
  • 📊 Statistics
  • 📋 About
    • 📄 About Us
    • 📰 Blog
    • 📢 News
    • 📧 Contact
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Decision Science Letters » Integrated ISM-Fuzzy MICMAC approach based factor analysis on the implementation of safety program in construction industry

⭐ Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • ChatGPT and Blended Learning

Journals

  • IJIEC (840)
  • IJDS (1032)
  • DSL (759)
  • ESM (434)
  • CCL (563)
  • JPM (350)
  • AC (572)
  • JFS (106)
  • MSL (2658)
  • USCM (1104)
  • HE (56)
  • SCI (53)

DSL Volumes

    • ▼ Volume 15 (110)
      • Issue 1 (19)
      • Issue 2 (22)
      • Issue 3 (32)
      • Issue 4 (37)
    • ▼ Volume 14 (87)
      • Issue 1 (21)
      • Issue 2 (23)
      • Issue 3 (25)
      • Issue 4 (18)
    • ▼ Volume 13 (78)
      • Issue 1 (21)
      • Issue 2 (18)
      • Issue 3 (19)
      • Issue 4 (20)
    • ▼ Volume 12 (64)
      • Issue 1 (12)
      • Issue 2 (24)
      • Issue 3 (13)
      • Issue 4 (15)
    • ▼ Volume 11 (49)
      • Issue 1 (9)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (17)
    • ▼ Volume 10 (43)
      • Issue 1 (7)
      • Issue 2 (8)
      • Issue 3 (20)
      • Issue 4 (8)
    • ▼ Volume 9 (39)
      • Issue 1 (8)
      • Issue 2 (9)
      • Issue 3 (14)
      • Issue 4 (8)
    • ▼ Volume 8 (38)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (14)
      • Issue 4 (10)
    • ▼ Volume 7 (41)
      • Issue 1 (8)
      • Issue 2 (8)
      • Issue 3 (8)
      • Issue 4 (17)
    • ▼ Volume 6 (30)
      • Issue 1 (8)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (7)
    • ▼ Volume 5 (39)
      • Issue 1 (12)
      • Issue 2 (10)
      • Issue 3 (8)
      • Issue 4 (9)
    • ▼ Volume 4 (48)
      • Issue 1 (10)
      • Issue 2 (12)
      • Issue 3 (14)
      • Issue 4 (12)
    • ▼ Volume 3 (53)
      • Issue 1 (15)
      • Issue 2 (10)
      • Issue 3 (19)
      • Issue 4 (9)
    • ▼ Volume 2 (30)
      • Issue 1 (5)
      • Issue 2 (6)
      • Issue 3 (9)
      • Issue 4 (10)
    • ▼ Volume 1 (10)
      • Issue 1 (5)
      • Issue 2 (5)

🔑 Keywords

Jordan(175)
Supply chain management(172)
Vietnam(154)
Customer satisfaction(124)
Performance(117)
Supply chain(115)
Artificial intelligence(108)
Service quality(101)
Competitive advantage(100)
SMEs(95)
Tehran Stock Exchange(94)
Sustainability(94)
optimization(88)
Financial performance(86)
TOPSIS(85)
Trust(85)
Organizational performance(81)
Job satisfaction(81)
Genetic Algorithm(81)
Social media(80)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(70)
Mohammad Reza Iravani(65)
Endri Endri(45)
Hotlan Siagian(43)
Muhammad Alshurideh(42)
Dmaithan Almajali(39)
Jumadil Saputra(37)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Sautma Ronni Basana(33)
Barween Al Kurdi(32)
Basrowi Basrowi(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(30)
Ni Nyoman Kerti Yasa(30)
Hassan Ghodrati(30)
Shankar Chakraborty(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Mahmoud Allahham(28)


» Show all authors

🌍 Countries

1. Algeria (52)
2. Angola (2)
3. Argentina (22)
4. Armenia (2)
5. Australia (52)
6. Austria (2)
7. Bahrain (26)
8. Bangladesh (58)
9. Belarus (4)
10. Belgium (3)
11. Benin (2)
12. Benin Republic (1)
13. Bhutan (1)
14. Bosnia and Herzegovina (1)
15. Botswana (9)
16. Brazil (40)
17. Brunei (1)
18. Bulgaria (1)
19. Burkina Faso (1)
20. Cameroon (1)
Total: 121 countries

Show all countries
Decision Science Letters
ISSN 1929-5812 (Online) - ISSN 1929-5804 (Print)
Quarterly Publication
Volume 10 Issue 2 pp. 139-150, 2021

Integrated ISM-Fuzzy MICMAC approach based factor analysis on the implementation of safety program in construction industry Pages 139-150 PDF Download PDF

Authors: Saber Ibrahim, Nejah Ben Mabrouk

📋 Author Affiliations:
S. Ibrahim ORCID 1, N.B. Mabrouk2
1 Department of Management Information Systems and Producion Management, College of Business and Economics, Qassim University, P.O. Box: 6640, Buraidah, 51452, Qassim, Saudi Arabia
2 Department of Management Information Systems and Producion Management, College of Business and Economics, Qassim University, P.O. Box: 6640, Buraidah, 51452, Qassim, Saudi Arabia, OLID Laboratory, Higher Institute of Industrial Management, University of Sfax, Road of Tunis km 10.5, Technopolis of Sfax – BP 1164, Sfax, 3021, Tunisia, Saudi Arabia
doi 10.5267/j.dsl.2020.11.005
2 Source: Scopus
Crossref 4 Source: CrossRef

🔑 Keywords: Safety program, Fuzzy logic, Interpretive Structural Modeling (ISM), Fuzzy MICMAC

Abstract: The challenge of improving construction safety performance is observed in many countries. Safety is considered by practitioners and researchers as an important topic in construction industry sites. Despite the findings of implementing safety programs, it is revealed that accidents and injuries are not perfectly reduced in construction projects. In the literature, authors tried to establish several frameworks and proposed methods to reach this objective by identifying the key factors affecting safety performance. The aim of this study is to present critical factors used in the implementation of safety programs and to explore their relationships using Interpretive Structural Modeling (ISM). Then, via ISM technique, the overall structure among factors was revealed. By using the Fuzzy MICMAC analysis, the factors were classified into four groups based on their driving power and dependence power. The results showed that “Safety Training” and “Management Commitment” have the most important impact on safety programs, but also it is very important to study the interactions among factors at different stages. This analysis offers key resources for practitioners and decision makers by analyzing the relationships between factors and its driving or dependence strength. These results shed lights on the effective development of measures to facilitate the implementation of safety programs in the construction sector.

How to cite this paper
APA: Ibrahim, S & Mabrouk, N. (2021). Integrated ISM-Fuzzy MICMAC approach based factor analysis on the implementation of safety program in construction industry. Decision Science Letters, 10(2), 139-150.
Chicago/Turabian: Ibrahim, S & Mabrouk, N. 2021. "Integrated ISM-Fuzzy MICMAC approach based factor analysis on the implementation of safety program in construction industry." Decision Science Letters 10, no. 2 (2021): 139-150.
AMA: Ibrahim, S & Mabrouk, N. Integrated ISM-Fuzzy MICMAC approach based factor analysis on the implementation of safety program in construction industry. Decision Science Letters. 2021;10(2):139-150.

References
Abudayyeh, O., Fredericks, T. K., Butt, S. E., & Shaar, A. (2006). An investigation of management’s commitment to construction safety. International Journal of Project Management, 24(2), 167–174.
Aksorn, T., & Hadikusumo, B. H. W. (2008). Critical success factors influencing safety program performance in Thai construction projects. Safety Science, 46(4), 709–727.
Al-Bsheish, M.A., bin Mustafa, M., & Ismail, M.A. (2017). Enhancing safety performance by recognizing the role of perceived management commitment to safety in the Jordanian healthcare industry: Conceptual framework. International Journal of Business and Social Research, 7(1), 1-10.
Al-Humaidi, H. M., & Tan, F. H. (2010). Construction Safety in Kuwait. Journal of Performance of Constructed Facilities, 24(1), 70–77.
Barbaranelli, C., Petitta, L., & Probst, T. M. (2015). Does safety climate predict safety performance in Italy and the USA? Cross-cultural validation of a theoretical model of safety climate. Accident Analysis & Prevention, 77, 35–44.
Bavafa, A., Mahdiyar, A., & Marsono, A. K. (2018). Identifying and assessing the critical factors for effective implementation of safety programs in construction projects. Safety Science, 106, 47–56.
Ben Mabrouk N. (2020). Analysis of Critical Factors Influencing the Supply Chain Performance of Small and Medium Enterprises. Journal of Advanced Manufacturing Systems, 19(4), 1–17.
Ben Mabrouk N. (2020a). Interpretive structural modeling of critical factors for buyer-supplier partnerships in supply chain management. Uncertain Supply Chain Management, 8(3), 613-626.
Ben Mabrouk, N., Ibrahim, S., & Eddaly, M. (2021). Success factors of lean six sigma implementation in manufacturing. Uncertain Supply Chain Management, 9(1).
Ben Mabrouk, N. (2020). Green supplier selection using fuzzy Delphi method for developing sustainable supply chain. Decision Science Letters, 10(1), 63-70.
Brahm, F., & Singer, M. (2013). Is more engaging safety training always better in reducing accidents? Evidence of self-selection from Chilean panel data. Journal of Safety Research, 47, 85-92.
Charehzehi, A. & Ahankoob, A. (2012). Enhancement of safety performance at construction site. International Journal of Advances in Engineering & Technology, 5(1), 303-312.
Cooper, M.D (2000). Towards a model of safety culture. Safety Science, 36, 111-136.
Faisal, M.N., Banwet, D.K., & Shankar, R. (2006). Supply chain risk mitigation: Modeling the enablers. Business Process Management Journal, 12(4), 535–552.
Fang, D., & Wu, H. (2013). Development of a Safety Culture Interaction (SCI) model for construction projects. Safety Science, 57, 138–149.
Fang, D.P., Huang, X.Y. & Hinze, J. (2004). Benchmarking studies on construction safety management in China. Journal of Construction Engineering and Management, 130(3), 424-432.
Feng, Y. (2013). Effect of safety investments on safety performance of building projects. Safety Science, 59, 28–45.
Flin, R., Mearns, K., O’Connor, P., & Bryden, R. (2000). Measuring safety climate: identifying the common features. Safety Science, 34(1-3), 177–192.
Gan, X., Chang, R., Zuo, J., Wen, T., & Zillante, G. (2018). Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach. Journal of Cleaner Production, 197, 8–18.
Gangwar, M. and Goodrum, P.M. (2005). The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(8), 851-859.
Haadir, S. A., & Panuwatwanich, K. (2011). Critical Success Factors for Safety Program Implementation among Construction Companies in Saudi Arabia. Procedia Engineering, 14, 148–155.
Hasan, A., & Jha, K. N. (2013). Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance. International Journal of Injury Control and Safety Promotion, 20(1), 3–12.
He, C., Jia, G., McCabe, B., Chen, Y., & Sun, J. (2019). Impact of psychological capital on construction worker safety behavior: Communication competence as a mediator. Journal of Safety Research, 71, 231-241.
Hinze, J. & Rabound, P. (1988). Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), 286–293.
Hinze, J. Hallowell, L., & Baud, K. (2013). Construction safety best practices and relationships to safety performance. Journal of Construction Engineering and Management, 139(10), 04013006.
Huang, Y.-H., Verma, S. K., Chang, W.-R., Courtney, T. K., Lombardi, D. A., Brennan, M. J., & Perry, M. J. (2012). Management commitment to safety vs. employee perceived safety training and association with future injury. Accident Analysis & Prevention, 47, 94–101.
Ismail, Z., Doostdar, S & Harun, Z. (2012). Factors influencing the implementation of a safety management system for construction sites. Safety science. 50(3), 418-423.
Jafari, M. J., Gharari, M., Kalantari, S., Omidi, L., Ghaffari, M., & Fardi, G. R. A. (2015). The influence of safety training on improvement in safety climate in construction sites of a firm. Safety Promotion and Injury Prevention, 2(4), 257-264.
Jain, V., & Raj, T. (2015). Modeling and analysis of FMS flexibility factors by TISM and fuzzy MICMAC. International Journal of System Assurance Engineering and Management, 6(3), 350–371.
Jannadi, M. O. (1996). Factors affecting the safety of the construction industry. Building Research & Information, 24(2), 108–112.
Jayant, A., & Azhar, M. (2014). Analysis of the Barriers for Implementing Green Supply Chain Management (GSCM) Practices: An Interpretive Structural Modeling (ISM) Approach. Procedia Engineering, 97, 2157–2166.
Jitwasinkul, B., & Hadikusumo, B. H. W. (2011). Identification of Important Organisational Factors Influencing Safety Work Behaviours in Construction Projects. Journal of Civil Engineering and Management, 17(4), 520–528.
Kaswan, M. S., & Rathi, R. (2019). Analysis and modeling the enablers of Green Lean Six Sigma implementation using Interpretive Structural Modeling. Journal of Cleaner Production, 231(10), 1182-1191.
Khan, K. M. I, Suguna, K.& Raghunath, P.N. (2015). A study on safety management in construction projects. International Journal of Engineering Science and Innovative Technology, 4, 119–128.
Kumar, S., Gorane, S., & Kant, R. (2015). Modelling the supplier selection process enablers using ISM and fuzzy MICMAC approach. Journal of Business & Industrial Marketing, 30(5), 536–551.
Law, W. K., Chan, A. H. S., & Pun, K. F. (2006). Prioritising the safety management elements: A hierarchical analysis for manufacturing enterprises. Industrial Management and Data Systems, 106(6), 778-792.
Lee, S. & Halpin, D.W. (2003). Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), 431–436.
Leveson, N. (2015). A systems approach to risk management through leading safety indicators. Reliability Engineering & System Safety, 136, 17–34.
Li, C.-H., & Li, H.-M. (2009). Developing a Model to Evaluate the Safety Management Performance of Construction Projects. International Conference on Management and Service Science. doi:10.1109/icmss.2009.5304613.
Li, R. Y. M., Chau, K. W., Lu, W., Ho, D. C. W., Shoaib, M., & Meng, L. (2019). Construction hazard awareness and construction safety knowledge sharing epistemology. International Conference on Smart Infrastructure and Construction (ICSIC), Driving Data-Informed Decision-Making, Churchill College, Cambridge, UK, 283–290.
Liu, Y., Zhang, Z., & Mao, Z. (2020). Analysis of influencing factors in pre-evacuation time using Interpretive Structural Modeling. Safety Science, 128, 104785.
Loosemore, M., & Malouf, N. (2019). Safety training and positive safety attitude formation in the Australian construction industry. Safety Science, 113, 233–243.
Majumdar, A., & Sinha, S. K. (2018). Analyzing the barriers of green textile supply chain management in South-east Asia using interpretive structural modelling. Sustainable Production and Consumption, 17, 176-187.
Malek, J., & Desai, T. N. (2019). Interpretive structural modelling based analysis of sustainable manufacturing enablers. Journal of Cleaner Production, 238, 117996.
Manu, P., Mahamadu, A. M., Ath, C., Heng, A. Y. T., & Kit, S. C. (2017). Health and safety management practices of contractors in South East Asia: A multi country study of Cambodia, Vietnam, and Malaysia. Safety Science, 107, 188-201.
Namian, M., Albert, A., Zuluaga, C. M., & Behm, M. (2016). Role of safety training: Impact on hazard recognition and safety risk perception. Journal of Construction Engineering and Management, 142(12), 1-10.
Omran, A., Omran, A. &. Kakir A. H. P. (2010). Critical success factors that influencing safety program performance in Malaysian construction projects case studies. Journal of Academic Research in Economics, 2(1), 124–134.
Pheng, L. S. & Shiua, S. (2000). The maintenance of construction safety: riding on ISO 9000 quality management systems. Journal of Quality in Maintenance Engineering, 6(1), 28–44.
Qureshi, M. N., Kumar, D., & Kumar, P. (2008). An integrated model to identify and classify the key criteria and their role in the assessment of 3PL services providers. Asia Pacific Journal of Marketing and Logistics, 20(2), 227–249.
Sawacha, E., Naoum, S. & Fong, D. (1999). Factors affecting safety performance on construction sites. International Journal of Project Management, 17(5), 309-315.
Shakerian, M., Jahangiri, M., Alimohammadlou, M., Nami, M., & Choobineh, A. (2019). Individual cognitive factors affecting unsafe acts among Iranian industrial workers: An integrative meta-synthesis interpretive structural modeling (ISM) approach. Safety Science, 120, 89–98.
Suraji, A., Duff, A. R., & Peckitt, S. J. (2001). Development of Causal Model of Construction Accident Causation. Journal of Construction Engineering and Management, 127(4), 337–344.
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42(7), 569–586.
Teo, E. A. L., Ling, F. Y. Y., & Chong, A. F. W. (2005). Framework for project managers to manage construction safety. International Journal of Project Management, 23(4), 329–341.
Thakkar, J., Kanda, A., & Deshmukh, S. G. (2007). Evaluation of buyer‐supplier relationships using an integrated mathematical approach of interpretive structural modeling (ISM) and graph theoretic matrix. Journal of Manufacturing Technology Management, 19(1), 92–124.
Wanberg, J., Harper, C., Hallowell, M. R., & Rajendran, S. (2013). Relationship between Construction Safety and Quality Performance. Journal of Construction Engineering and Management, 139(10), 04013003.
Warfield, J. N. (1974). Developing Subsystem Matrices in Structural Modeling. IEEE Transactions on Systems, Man, and Cybernetics, SMC-4(1), 74–80.
Yiu, N. S. N, & Chan, D. W. M. (2018). Project characteristics indicating safety performance. International Journal of Engineering & Technology, 7(3.29), 110-114.
Zamani, V., Banihashemi, S. Y., & Abbasi, A. (2020). How can communication networks among excavator crew members in construction projects affect the relationship between safety climate and safety outcomes? Safety Science, 128, 104737.
Zhang, S., Boukamp, F., & Teizer, J. (2015). Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA). Automation in Construction, 52, 29–41.
Zwetsloot, G. I. J. M., Kines, P., Ruotsala, R., Drupsteen, L., Merivirta, M.-L., & Bezemer, R. A. (2017). The importance of commitment, communication, culture and learning for the implementation of the Zero Accident Vision in 27 companies in Europe. Safety Science, 96, 22–32.
  • 34
  • 1
  • 2
  • 3
  • 4
  • 5

📚 Journal: Decision Science Letters | 📅 Year: 2021 | 📖 Volume: 10 | 📄 Issue: 2 | 👁️ Views: 2034 | 📊 Crossref: 4

Related Articles:
  • Risk and its impacts on time and cost in construction projects
  • A fuzzy data envelopment analysis based on credibility theory for estimating road safety
  • Fuzzy inference system-Latin hypercube simulation: An integrated hybrid model for OHS risks management
  • Modelling the factors influencing the selection of the construction equipment for Indian construction organizations
  • An integrated framework for cost- benefit analysis in road safety projects using AHP method

📝 Ready to share your research?

Decision Science Letters is accepting new submissions for upcoming issues. Join our community of authors and publish your work with us.

✓ Open access
✓ Rigorous peer review
✓ Fast publication
📤 Submit Your Manuscript →

📖 Author Guidelines

® 2010-2026 GrowingScience.Com