How to cite this paper
Sumrit, D. (2020). Supplier selection for vendor-managed inventory in healthcare using fuzzy multi-criteria decision-making approach.Decision Science Letters , 9(2), 233-256.
Refrences
Abbady, M.A.S., Akkaya, M., & Sari, A. (2019). Big data governance, dynamic capability and decision-making effectivenes: Fuzzy sets approach. Decision Science Letters, 8(4), 429-440.
Abdallah, A. B., Abdullah, M. I., & Saleh, F. M. (2017). The effect of trust with suppliers on hospital supply chain performance. The mediating role of supplier integration. 24(3), 694-715.
Bhakoo, V., Singh, P. and Sohal, A. (2012). Collaborative management of inventory in Australian hospital supply chains: practices and issues. Supply Chain Management: An International Journal, 17(2), 217-230.
Chang, D.Y. (1996). Application of the extent analysis method on fuzzy AHP. European Journal of Operational Research, 95(3), 649-655.
Chatterjee, N.C., & Bose, G.K. (2013). Selection of vendors for wind farm under fuzzy MCDM environment. International Journal of Industrial Engineering Computations, 4(4), 535-546.
Chen, D. Q., Preston, D. S. & Xia, W. (2013). Enhancing hospital supply chain performance: a relational view and empirical test. Journal of Operations Management, 31(6), 391–408.
Classen, M. J. T., Weele, A. J. V. & Raaij, E. M. V. (2008). Performance outcomes and success factors of vendor managed inventory (VMI). Supply Chain Management: An International Journal, 13(6), 406–414.
Danese, P. (2007). Designing CPFR collaborations: insights from seven case studies. International Journal of Operations & Production Management, 27(2), 181-204.
De Vries, J. (2011). The shaping of inventory systems in health services: A stakeholder analysis. International Journal of Production Economics, 118(1), 136–145.
Dong, Y., & Xu, K. (2002). A supply chain model of vendor managed inventory. Transportation research part E: logistics and transportation review, 38(2), 75-95.
Dong, Y., Xu, K. & Dresner, M. (2007). Environmental determinants of VMI adoption: an exploratory analysis. Transportation Research Part E: Logistics and Transportation Review, 43(4), 355-369.
Eghbali-Zarch, M., Tavakkoli-Moghaddaam, R., Esfahanian, F., & Sepehri, M.M.(2018). Pharmacological therapy selection of type 2 diabetes based on the SWARA and method MULTIMOORA methods under a fuzzy environment. Artificial Intelligence in Medicine, 87, 20-33. https://doi.org/10.1016./j.artmed.2018.03.003.
Falasca, M., John, F. Kros, & Nadler, S. S. (2016). Performance outcomes and success factors of industrial vending solutions. International Journal of Operations & Production Management, 36(10), 1359-1381.
Flynn, B.B., Koufteros, X., & Lu, G. (2016). On theory in supply chain uncertainty and its implications for supply chain integration. Journal of Supply Chain Management, 52(3), 3–27.
Fouladgar, M. M., Chamzini, A. Y., Zavadskas, E.K., & Moini, S. H. H. (2012). A new hybrid model for evaluating the working strategies: case study of construction company, Technological and Economic Development of Economy, 18(1), 164-188.
García-Villarreal, E., Bhamra, R., & Schoenheit, M. (2019). Critical success factors of medical technology supply chains. Production Planning & Control, 30(9), 716-735.
Guimarães, C. M., Carvalho, J. C. & Maia, A. (2013). Vendor managed inventory (VMI): Evidences from lean deployment in healthcare. Strategic Outsourcing: An International Journal, 6(1), 8–24.
Hui, S. (2010). Research on supply management in hospital based on VMI. 17th International Conference on Industrial Engineering and Engineering Management, IEEE. On 29-31 Oct, 2010. Xiamen, China. https://doi.org/10.1109/ICIEEM.2010.5646000.
Jayaram, J., Nicolae, M. & Xu, Kefeng. (2011). The direct and contingency effects of supplier coordination and customer coordination on quality and flexibility performance. International Journal of Production Research, 49(1), 59-85.
Kaklauskas, A., Zavadskas, E.K., Raslanas, S., Ginevicius, R., Komka, A., & Malinauskas, P. (2006). Selection of low-e windows in retrofit of public buildings by applying multiple criteria method CORPAS: a Lithuanian case, Energy and Buildings, 38(5), 454-462.
Kannan, D., Jabbour, A. B. L. D. S., & Jabbour, C. J. C. (2014). Selecting green suppliers based on GSCM practices: Using Fuzzy TOPSIS applied to a Brazilian electronics company. European Journal of Operational Research, 233(2), 432-447.
Kers ̌ullene, V., Zavadskas, E.K., & Turskis, Z. (2010). Selection of rational dispute resolution method by applying new step-wise weight assessment ratio analysis (Swara). Journal of Business Econonmics and Management, 11(2), 243-258.
Kim, D. (2005). An integrated supply chain management system: A case study in healthcare sector, International Conference on Electronic Commerce and Web Technologies, EC-Web, August, 2005: E-Commerce and Web Technologies, 3590, pp. 218-227.
Krichanchai, S. & MacCarthy, B. L. (2017). The adoption of vendor managed inventory for hospital pharmaceutical supply. International Journal of Logistics Management, 28(3), 755-780.
Kros, J. F., Kirchoff, J. F., & Falasca, M. (2019). The impact of buyer-supplier relationship quality and information management on industrial vending machine benefits in the healthcare industry. Journal of Purchasing and Supply Management, 25(3), https://doi.org/10.1016/j.pursup.2018.06.005.
Kwon, I.W.G., Kim, S.H., & Martin, D.G. (2016). Healthcare supply chain management; strategic areas for quality and financial improvement. Technological Forecasting & Social Change, 113, 422-428. https://doi.org/10.1016/j.techfore.2016.07.014.
Lee, A.H.I., Wang, W., & Lin, T. (2010). An evaluation framework for technology transfer of new equipment in high technology industry. Technological Forecasting and Social Change, 77(1), 135–150.
Liu, M., Zhang, Z. & Zhang, D. (2017). Logistics planning for hospital pharmacy trusteeship under a hybrid of uncertainties. Transportation Research Part E: Logistics and Transportation Review, 101, 201-215. https://doi.org/10.1016/j.tre.2017.02.006.
Mardani, A., Nilashi, M., Zakuan, N., Loganathan, N., Soheilirad, S., & Saman, M.Z.M. (2017). A systematic review and meta-Analysis of SWARA and WASPAS methods: theory and applications with recent fuzzy developments. Applied Soft Computing, 57, 265–292. https://doi.org/10.1016/j.asoc.2017.03.045.
Matopoulos, A. & Michailidou, L. (2013). Implementing collaborative practices in the healthcare supply chain: insights into hospital-vendor operations. International Journal of Logistics Systems and Management, 15(2/3), 288-303.
Moons, K., Waeyenbergh, G., & Pintelon, L. (2019). Measuring the logistics performance of internal hospital supply chains – A literature study. Omega, 82, 205-217. https://doi.org/10.1016/j.omega.2018.01.007.
Naeij, J., & Shavandi, H. (2010). An optimal lot sizing and pricing in two echelon supply chain. International Journal of Industrial Engineering Computations, 1(1), 11-32.
Ngampunvetchakul, S. (2014). Hospital warehouse and inventory management: a case study of VMI implementation. A thesis submitted in partial fulfillment of the requirements for the degree of master of engineering (Industrial engineering), Faculty of graduate studies, Mahidol University.
Niemsakul, J., Islam, S.M.N., Singkarin, D., Somboonwiwat, T. (2018). Cost-benefit sharing in healthcare supply chain collaboration. International Journal of Logistics Systems and Management, 30(3), 406-420.
Niknamfar, A. H. (2015). Multi-objective production-distribution planning based on vendor-managed inventory strategy in a supply chain. Industrial Management & Data Systems, 115(6), 1086-1112.
Perςin, S.(2018). An integrated fuzzy SWARA and fuzzy AD approach for outsourcing provider selection. Journal of Manufacturing Technology Management, 30(2), 531-552.
Raad, N.G., Shirazi, M.A. & Ghodsypour, S.H. (2020). Selecting a portfolio of projects considering both optimization and balance of sub-portfolios. Journal of Project Management, 5(1), 1-16.
Ramanathan, U. (2012). Supply chain collaboration for improved forecast accuracy of promotional sales. International Journal of Operations & Production Management, 32(6), 676-695.
Raweewan, M., & Ferrell, W. G. Jr. (2018). Information sharing in supply chain collaboration. Computers & Industrial Engineering, 126, 269-281. https://doi.org/10.1016/j.cie.2018.09.042.
Savasaneril, S., & Erkip, N. (2010). An analysis of manufacturer benefits under vendor managed systems. IIE Transactions. 42(7), 455–477.
Schitea, D., Deveci, M., Iordache, M., Bigili, Ku ̈rsad, B., Akyurt, I.Z. & Iordache, I. (2019). Hydrogen mobility roll-up site selection using intuitionistic fuzzy sets based WASPAS, COPRAS and EDAS. International Journal of Hydrogen Energy, 44, 8585-8600. https://doi.org/10.1016/j.ijhydene.2019.02.011.
Shih, S. C., Rivers, P. A., & Hsu, S.H.Y. (2009). Strategic information technology alliances for effective health-care supply chain management. Health Services Management Research, 22(3), 140-150.
Shou, Y., Li, Y., Park, Y., & Kang, M. (2018). Supply chain integration and operational performance: The contingency effects of production systems. Journal of Purchasing and Supply Management, 24, 352-360. https://doi.org/10.1016/j.pursup.2017.11.004.
Singh, A. & Teng, J.T.C. (2016). Enhancing supply chain outcomes through Information Technology and Trust. Computers in Human Behavior, 54, 290-300. https://doi.org/10.1016/j.chb.2015.07.051.
Singh, R.K. (2013). Analyzing the factors for VMI implementaion: A framework. Global Business Review, 14(1), 169-186. SAGE.
Somsuk, N., & Laosirihongthong, T. (2017). Prioritization of applicable drivers for green supply chain management implementation toward sustainability in Thailand. International Journal of Sustainable Development & World Ecology, 24(2), 175-191.
Sui, A. (2010). A reinforcement learning approach for inventory replenishment in vendor-managed inventory systems with consignment inventory. Engineering Management Journal, 22(4), 44-53.
Sumrit, D. (2019). A multi-criteria decision making model for readiness assessment of vendor managed inventory in healthcare. International Journal of Management and Decision Making, 18(1), https://doi.org/10.1504/IJMDM.2019.10021559.
Tony, A., & Zamalo, E., (2005). From a traditional replenishment system of vendor managed inventory: a case study from the household electrical appliances sector. International Journal of Production Economics, 96(1), 63-79.
Vigtil, A. (2007). Information exchange in vendor managed inventory. International Journal of Physical Distribution and Logistics Management, 37(2), 131-147.
Volland, J., Fuegener, A., Schoenfelder, J., & Brunner, J.O. (2017). Material logistics in hospitals: a literature review. Omega, 69, 82–101. https://doi.org/10.1016/j.omega.2016.08.004.
Wang, X. (2015). A comprehensive decision making model for the evaluation of green operations initiatives. Technological Forecasting and Social Change, 95, 191–207. https://doi.org/0000-0002-5788-9387.
Watt, D. J., Kayis, B. & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Project Management, 28(1), 51-60.
Wei, W.L., & Chang, W.C. (2008). Analytic network process-based model for selecting an optimal product design solution with zero-one goal programming. Journal of Engineering Design, 19(1), 15–44.
Weraikat, D., Zanjani, M.K., & Lehoux, N. (2019). Improving sustainability in a two-level pharmaceutical supply chain through Vendor-Managed Inventory System. Operations Research for Health Care, 21, 44-55. https://doi.org/10.1016/j.orhc.2019.04.004.
Yang, Z., Jiang, Y., & Xie, E. (2019). Buyer-supplier relational strength and buying firm’s marketing capability: An outside-in perspective. Industrial Marketing Management. https://doi.org/10.1016./j.indmarman.2019.03.009.
Yao, Y., Evers, P. T., & Dresner, M. E. (2007). Supply chain integration in vendor managed inventory. Decision support systems, 43(2), 663-674.
Yazdani, M., Gonzalez, E.D.R.S., & Chatterjee, P. (2019). A multi-criteria decision-making framework for agriculture supply chain risk management under a circular economy context. Agriculture supply chain risk management. https://doi.org/10.1108/MD-10-2018-1088.
Yu, H., Tang, L., Xu, Y., & Wang, Y. (2015). How much does VMI better than RMI in a global environment? International Journal of Production Economics, 170, 268-274. https://doi.org/10.1016/j.ijpe.2015.10.004.
Zadeh, L. A. (1965). Fuzzy Sets. Information and control, 8(3), 338-353.
Zarbakhshnia, N., Soleimani, H., & Ghaderi, H. (2018). Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria. Applied Soft Computing, 65, 307-319. https://doi.org/10.1016/j.asoc.2018.01.023.
Zavadskas, E. K., Kaklauskas, A., & Sarka, V. (1994). The new method of multi criteria complex proportional assessment of projects. Technological and Economic Development of Economy, 1(3), 131-139.
Zheng, Y., Xu, Z., He, Y. & Liao, H. (2018). Severity assessment of chronic obstructive pulmonary disease based on hesitant fuzzy linguistic COPRAS method. Applied Soft Computing, 69, 60-71. https://doi.org/10.1016/j.asoc.2018.04.035.
Ziaee, M., & Bouquard, J. L. (2010). Optimal pricing and lot sizing vendor managed inventory. International Journal of Industrial Engineering Computations, 1(1), 33-44.
Ziat, A., Sefiani, N., Reklaoui, K., & Azzouzi, H. (2019). A generic framework for hospital supply chain. International Journal of Healthcare Management, 1-8. https://doi.org/10.1080/20479700.2019.1603415.
Abdallah, A. B., Abdullah, M. I., & Saleh, F. M. (2017). The effect of trust with suppliers on hospital supply chain performance. The mediating role of supplier integration. 24(3), 694-715.
Bhakoo, V., Singh, P. and Sohal, A. (2012). Collaborative management of inventory in Australian hospital supply chains: practices and issues. Supply Chain Management: An International Journal, 17(2), 217-230.
Chang, D.Y. (1996). Application of the extent analysis method on fuzzy AHP. European Journal of Operational Research, 95(3), 649-655.
Chatterjee, N.C., & Bose, G.K. (2013). Selection of vendors for wind farm under fuzzy MCDM environment. International Journal of Industrial Engineering Computations, 4(4), 535-546.
Chen, D. Q., Preston, D. S. & Xia, W. (2013). Enhancing hospital supply chain performance: a relational view and empirical test. Journal of Operations Management, 31(6), 391–408.
Classen, M. J. T., Weele, A. J. V. & Raaij, E. M. V. (2008). Performance outcomes and success factors of vendor managed inventory (VMI). Supply Chain Management: An International Journal, 13(6), 406–414.
Danese, P. (2007). Designing CPFR collaborations: insights from seven case studies. International Journal of Operations & Production Management, 27(2), 181-204.
De Vries, J. (2011). The shaping of inventory systems in health services: A stakeholder analysis. International Journal of Production Economics, 118(1), 136–145.
Dong, Y., & Xu, K. (2002). A supply chain model of vendor managed inventory. Transportation research part E: logistics and transportation review, 38(2), 75-95.
Dong, Y., Xu, K. & Dresner, M. (2007). Environmental determinants of VMI adoption: an exploratory analysis. Transportation Research Part E: Logistics and Transportation Review, 43(4), 355-369.
Eghbali-Zarch, M., Tavakkoli-Moghaddaam, R., Esfahanian, F., & Sepehri, M.M.(2018). Pharmacological therapy selection of type 2 diabetes based on the SWARA and method MULTIMOORA methods under a fuzzy environment. Artificial Intelligence in Medicine, 87, 20-33. https://doi.org/10.1016./j.artmed.2018.03.003.
Falasca, M., John, F. Kros, & Nadler, S. S. (2016). Performance outcomes and success factors of industrial vending solutions. International Journal of Operations & Production Management, 36(10), 1359-1381.
Flynn, B.B., Koufteros, X., & Lu, G. (2016). On theory in supply chain uncertainty and its implications for supply chain integration. Journal of Supply Chain Management, 52(3), 3–27.
Fouladgar, M. M., Chamzini, A. Y., Zavadskas, E.K., & Moini, S. H. H. (2012). A new hybrid model for evaluating the working strategies: case study of construction company, Technological and Economic Development of Economy, 18(1), 164-188.
García-Villarreal, E., Bhamra, R., & Schoenheit, M. (2019). Critical success factors of medical technology supply chains. Production Planning & Control, 30(9), 716-735.
Guimarães, C. M., Carvalho, J. C. & Maia, A. (2013). Vendor managed inventory (VMI): Evidences from lean deployment in healthcare. Strategic Outsourcing: An International Journal, 6(1), 8–24.
Hui, S. (2010). Research on supply management in hospital based on VMI. 17th International Conference on Industrial Engineering and Engineering Management, IEEE. On 29-31 Oct, 2010. Xiamen, China. https://doi.org/10.1109/ICIEEM.2010.5646000.
Jayaram, J., Nicolae, M. & Xu, Kefeng. (2011). The direct and contingency effects of supplier coordination and customer coordination on quality and flexibility performance. International Journal of Production Research, 49(1), 59-85.
Kaklauskas, A., Zavadskas, E.K., Raslanas, S., Ginevicius, R., Komka, A., & Malinauskas, P. (2006). Selection of low-e windows in retrofit of public buildings by applying multiple criteria method CORPAS: a Lithuanian case, Energy and Buildings, 38(5), 454-462.
Kannan, D., Jabbour, A. B. L. D. S., & Jabbour, C. J. C. (2014). Selecting green suppliers based on GSCM practices: Using Fuzzy TOPSIS applied to a Brazilian electronics company. European Journal of Operational Research, 233(2), 432-447.
Kers ̌ullene, V., Zavadskas, E.K., & Turskis, Z. (2010). Selection of rational dispute resolution method by applying new step-wise weight assessment ratio analysis (Swara). Journal of Business Econonmics and Management, 11(2), 243-258.
Kim, D. (2005). An integrated supply chain management system: A case study in healthcare sector, International Conference on Electronic Commerce and Web Technologies, EC-Web, August, 2005: E-Commerce and Web Technologies, 3590, pp. 218-227.
Krichanchai, S. & MacCarthy, B. L. (2017). The adoption of vendor managed inventory for hospital pharmaceutical supply. International Journal of Logistics Management, 28(3), 755-780.
Kros, J. F., Kirchoff, J. F., & Falasca, M. (2019). The impact of buyer-supplier relationship quality and information management on industrial vending machine benefits in the healthcare industry. Journal of Purchasing and Supply Management, 25(3), https://doi.org/10.1016/j.pursup.2018.06.005.
Kwon, I.W.G., Kim, S.H., & Martin, D.G. (2016). Healthcare supply chain management; strategic areas for quality and financial improvement. Technological Forecasting & Social Change, 113, 422-428. https://doi.org/10.1016/j.techfore.2016.07.014.
Lee, A.H.I., Wang, W., & Lin, T. (2010). An evaluation framework for technology transfer of new equipment in high technology industry. Technological Forecasting and Social Change, 77(1), 135–150.
Liu, M., Zhang, Z. & Zhang, D. (2017). Logistics planning for hospital pharmacy trusteeship under a hybrid of uncertainties. Transportation Research Part E: Logistics and Transportation Review, 101, 201-215. https://doi.org/10.1016/j.tre.2017.02.006.
Mardani, A., Nilashi, M., Zakuan, N., Loganathan, N., Soheilirad, S., & Saman, M.Z.M. (2017). A systematic review and meta-Analysis of SWARA and WASPAS methods: theory and applications with recent fuzzy developments. Applied Soft Computing, 57, 265–292. https://doi.org/10.1016/j.asoc.2017.03.045.
Matopoulos, A. & Michailidou, L. (2013). Implementing collaborative practices in the healthcare supply chain: insights into hospital-vendor operations. International Journal of Logistics Systems and Management, 15(2/3), 288-303.
Moons, K., Waeyenbergh, G., & Pintelon, L. (2019). Measuring the logistics performance of internal hospital supply chains – A literature study. Omega, 82, 205-217. https://doi.org/10.1016/j.omega.2018.01.007.
Naeij, J., & Shavandi, H. (2010). An optimal lot sizing and pricing in two echelon supply chain. International Journal of Industrial Engineering Computations, 1(1), 11-32.
Ngampunvetchakul, S. (2014). Hospital warehouse and inventory management: a case study of VMI implementation. A thesis submitted in partial fulfillment of the requirements for the degree of master of engineering (Industrial engineering), Faculty of graduate studies, Mahidol University.
Niemsakul, J., Islam, S.M.N., Singkarin, D., Somboonwiwat, T. (2018). Cost-benefit sharing in healthcare supply chain collaboration. International Journal of Logistics Systems and Management, 30(3), 406-420.
Niknamfar, A. H. (2015). Multi-objective production-distribution planning based on vendor-managed inventory strategy in a supply chain. Industrial Management & Data Systems, 115(6), 1086-1112.
Perςin, S.(2018). An integrated fuzzy SWARA and fuzzy AD approach for outsourcing provider selection. Journal of Manufacturing Technology Management, 30(2), 531-552.
Raad, N.G., Shirazi, M.A. & Ghodsypour, S.H. (2020). Selecting a portfolio of projects considering both optimization and balance of sub-portfolios. Journal of Project Management, 5(1), 1-16.
Ramanathan, U. (2012). Supply chain collaboration for improved forecast accuracy of promotional sales. International Journal of Operations & Production Management, 32(6), 676-695.
Raweewan, M., & Ferrell, W. G. Jr. (2018). Information sharing in supply chain collaboration. Computers & Industrial Engineering, 126, 269-281. https://doi.org/10.1016/j.cie.2018.09.042.
Savasaneril, S., & Erkip, N. (2010). An analysis of manufacturer benefits under vendor managed systems. IIE Transactions. 42(7), 455–477.
Schitea, D., Deveci, M., Iordache, M., Bigili, Ku ̈rsad, B., Akyurt, I.Z. & Iordache, I. (2019). Hydrogen mobility roll-up site selection using intuitionistic fuzzy sets based WASPAS, COPRAS and EDAS. International Journal of Hydrogen Energy, 44, 8585-8600. https://doi.org/10.1016/j.ijhydene.2019.02.011.
Shih, S. C., Rivers, P. A., & Hsu, S.H.Y. (2009). Strategic information technology alliances for effective health-care supply chain management. Health Services Management Research, 22(3), 140-150.
Shou, Y., Li, Y., Park, Y., & Kang, M. (2018). Supply chain integration and operational performance: The contingency effects of production systems. Journal of Purchasing and Supply Management, 24, 352-360. https://doi.org/10.1016/j.pursup.2017.11.004.
Singh, A. & Teng, J.T.C. (2016). Enhancing supply chain outcomes through Information Technology and Trust. Computers in Human Behavior, 54, 290-300. https://doi.org/10.1016/j.chb.2015.07.051.
Singh, R.K. (2013). Analyzing the factors for VMI implementaion: A framework. Global Business Review, 14(1), 169-186. SAGE.
Somsuk, N., & Laosirihongthong, T. (2017). Prioritization of applicable drivers for green supply chain management implementation toward sustainability in Thailand. International Journal of Sustainable Development & World Ecology, 24(2), 175-191.
Sui, A. (2010). A reinforcement learning approach for inventory replenishment in vendor-managed inventory systems with consignment inventory. Engineering Management Journal, 22(4), 44-53.
Sumrit, D. (2019). A multi-criteria decision making model for readiness assessment of vendor managed inventory in healthcare. International Journal of Management and Decision Making, 18(1), https://doi.org/10.1504/IJMDM.2019.10021559.
Tony, A., & Zamalo, E., (2005). From a traditional replenishment system of vendor managed inventory: a case study from the household electrical appliances sector. International Journal of Production Economics, 96(1), 63-79.
Vigtil, A. (2007). Information exchange in vendor managed inventory. International Journal of Physical Distribution and Logistics Management, 37(2), 131-147.
Volland, J., Fuegener, A., Schoenfelder, J., & Brunner, J.O. (2017). Material logistics in hospitals: a literature review. Omega, 69, 82–101. https://doi.org/10.1016/j.omega.2016.08.004.
Wang, X. (2015). A comprehensive decision making model for the evaluation of green operations initiatives. Technological Forecasting and Social Change, 95, 191–207. https://doi.org/0000-0002-5788-9387.
Watt, D. J., Kayis, B. & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Project Management, 28(1), 51-60.
Wei, W.L., & Chang, W.C. (2008). Analytic network process-based model for selecting an optimal product design solution with zero-one goal programming. Journal of Engineering Design, 19(1), 15–44.
Weraikat, D., Zanjani, M.K., & Lehoux, N. (2019). Improving sustainability in a two-level pharmaceutical supply chain through Vendor-Managed Inventory System. Operations Research for Health Care, 21, 44-55. https://doi.org/10.1016/j.orhc.2019.04.004.
Yang, Z., Jiang, Y., & Xie, E. (2019). Buyer-supplier relational strength and buying firm’s marketing capability: An outside-in perspective. Industrial Marketing Management. https://doi.org/10.1016./j.indmarman.2019.03.009.
Yao, Y., Evers, P. T., & Dresner, M. E. (2007). Supply chain integration in vendor managed inventory. Decision support systems, 43(2), 663-674.
Yazdani, M., Gonzalez, E.D.R.S., & Chatterjee, P. (2019). A multi-criteria decision-making framework for agriculture supply chain risk management under a circular economy context. Agriculture supply chain risk management. https://doi.org/10.1108/MD-10-2018-1088.
Yu, H., Tang, L., Xu, Y., & Wang, Y. (2015). How much does VMI better than RMI in a global environment? International Journal of Production Economics, 170, 268-274. https://doi.org/10.1016/j.ijpe.2015.10.004.
Zadeh, L. A. (1965). Fuzzy Sets. Information and control, 8(3), 338-353.
Zarbakhshnia, N., Soleimani, H., & Ghaderi, H. (2018). Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria. Applied Soft Computing, 65, 307-319. https://doi.org/10.1016/j.asoc.2018.01.023.
Zavadskas, E. K., Kaklauskas, A., & Sarka, V. (1994). The new method of multi criteria complex proportional assessment of projects. Technological and Economic Development of Economy, 1(3), 131-139.
Zheng, Y., Xu, Z., He, Y. & Liao, H. (2018). Severity assessment of chronic obstructive pulmonary disease based on hesitant fuzzy linguistic COPRAS method. Applied Soft Computing, 69, 60-71. https://doi.org/10.1016/j.asoc.2018.04.035.
Ziaee, M., & Bouquard, J. L. (2010). Optimal pricing and lot sizing vendor managed inventory. International Journal of Industrial Engineering Computations, 1(1), 33-44.
Ziat, A., Sefiani, N., Reklaoui, K., & Azzouzi, H. (2019). A generic framework for hospital supply chain. International Journal of Healthcare Management, 1-8. https://doi.org/10.1080/20479700.2019.1603415.