Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » Zhiyong Li

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Joint revenue loss of "BOOT+BTO" mode for the comprehensive utilization of water conservancy project Pages 51-66 Right click to download the paper Download PDF

Authors: Zhiyong Li, Zhengyan Chen, Siyu Jiang, Xianfei Chen, Xiangtian Nie

DOI: 10.5267/j.ijiec.2025.12.003

Keywords:

Abstract:
The comprehensive utilization of water conservancy projects adopts the PPP development model, which not only introduces social capital to alleviate government debt pressure, but also utilizes the management technology of social capital to improve the level of engineering construction and operation management and the quality of social services. This article explores the profit losses during the implementation of public welfare emergency dispatch, reduced irrigation water demand in flood years, and adjustments to operation dispatch rules caused by major public activities under the "BOOT+BTO" operation mode of water conservancy PPP projects. Based on the modified total cost method, the function model and constraints of franchise profit losses are analyzed. The Copula function theory is used to analyze the joint profit losses of electricity generation and water supply profits, and a joint profit loss calculation model for the "BOOT+BTO" mode of water conservancy projects is constructed, providing a theoretical basis for governments and PPP project companies to scientifically implement emergency dispatch and reduce joint revenue losses.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2026 | Volume: 17 | Issue: 1 | Views: 80 | Reviews: 0

 
2.

The calculation method of critical chain buffer based on GERT network and information entropy Pages 583-602 Right click to download the paper Download PDF

Authors: Xiangtian Nie, Jianuo Gu, Pengyuan Li, Qikai Li, Zhiyong Li

DOI: 10.5267/j.ijiec.2025.4.010

Keywords: Critical chain buffer, Information entropy, GERT network

Abstract:
In order to address project delays caused by uncertain factors in the construction project schedule management process, a new method for calculating the size of critical chain buffers is proposed. Taking into account process uncertainty and based on the GERT network, the correction process and duration of different logical processes are provided to transform the uncertain network into a deterministic one. By combining the critical chain management method and information entropy theory to assess the impact of increasing uncertainty in the merging process on the critical chain buffer, a calculation model for the critical chain buffer size based on the GERT network is established and analyzed using a numerical example. The feasibility and effectiveness of the model are verified through an example, demonstrating its ability to reduce project risks and shorten the construction period while ensuring a high probability of project completion.
Details
  • 17
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2025 | Volume: 16 | Issue: 3 | Views: 376 | Reviews: 0

 

® 2010-2026 GrowingScience.Com