Growing Science » Authors » Yuan-Shyi Peter Chiu
Authors: Yuan-Shyi Peter Chiu, Ting-Fang Yan, Singa Wang Chiu, Hui-Chi Wang, Tiffany Chiu
DOI: 10.5267/j.ijiec.2023.1.001
Keywords: Multiproduct production-shipping problem, Delayed differentiation, Rework, Multi-delivery, Overtime, Outsourcing
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 2 | Views: 701 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Fan-Yun Pai, Victoria Chiu
DOI: 10.5267/j.ijiec.2022.10.001
Keywords: Manufacturing planning, Operating expenditures, Quality reassurances, Probabilistic failures, Overtime, Outsourcing
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 1 | Views: 771 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Chih-Yun Ke, Tiffany Chiu, Tsu-Ming Yeh
DOI: 10.5267/j.ijiec.2022.5.004
Keywords: Final production rate, Supplier-retailer integration, Outsourcer, Rework, Expedited-rate, Breakdown, Multi-delivery
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 4 | Views: 837 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yunsen Wang, Tsu-Ming Yeh, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2022.4.001
Keywords: Fabricating runtime, Probabilistic breakdowns, Overtime, Scrap, Outsourcing
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 3 | Views: 1062 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Liang-Wei You, Tiffany Chiu, Fan-Yun Pai
DOI: 10.5267/j.ijiec.2022.2.003
Keywords: Multiproduct manufacturing, Rework, Overtime, Fabrication-shipment decision, Postponement
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 3 | Views: 1030 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Tiffany Chiu, Fan-Yun Pai, Hua Yao Wu
DOI: 10.5267/j.ijiec.2021.5.001
Keywords: Producer-retailer incorporated problem, Multi-item EPQ model, Expedited rate, Delayed differentiation, Random scrap, Multi-delivery
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 4 | Views: 1005 | Reviews: 0
Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2021.1.001
Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1317 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Huei-Hsin Chang, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2020.9.003
Keywords: Multi-item manufacturing, Outsourcing, Delayed differentiation, Rework, Scrap, Batch fabrication
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 1 | Views: 1107 | Reviews: 0
Authors: Hong-Dar Lin, Tung-Hsin Lee, Chou-Hsien Lin, Yuan-Shyi Peter Chiu
Keywords: Quality inspection, Grade judgment, Fabrication of spectacle lenses, Distortion defect, Exponentially weighted moving average method, Fuzzy inference model
Journal: DSL | Year: 2022 | Volume: 11 | Issue: 4 | Views: 823 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Yunsen Wang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2020.6.001
Keywords: Multiproduct replenishment decision, Postponement, Overtime, Product quality reassurance, Commonality, Common cycle time
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1521 | Reviews: 0
® 2010-2024 GrowingScience.Com