Processing, Please wait...

  • Home
  • About Us
  • 📺 Tutorial
  • Search:
  • Advanced Search

Growing Science » Authors » Thomas McDonald

📚 Highly Cited Articles

  • Jaya Algorithm
  • Rao Algorithm
  • TLBO Algorithm
  • Discrete Firefly
  • ChatGPT and Blended Learning

Journals

  • IJIEC (777)
  • MSL (2648)
  • DSL (690)
  • CCL (544)
  • USCM (1099)
  • ESM (428)
  • AC (562)
  • JPM (323)
  • IJDS (992)
  • JFS (101)
  • HE (37)
  • SCI (41)

🔑 Keywords

Supply chain management(168)
Jordan(167)
Vietnam(153)
Customer satisfaction(122)
Performance(116)
Supply chain(113)
Competitive advantage(98)
Service quality(98)
Artificial intelligence(95)
Tehran Stock Exchange(94)
Sustainability(91)
SMEs(91)
optimization(88)
Trust(84)
Financial performance(84)
TOPSIS(83)
Job satisfaction(81)
Knowledge Management(80)
Social media(79)
Genetic Algorithm(78)


» Show all keywords

✍️ Authors

Naser Azad(82)
Zeplin Jiwa Husada Tarigan(67)
Mohammad Reza Iravani(64)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(40)
Dmaithan Almajali(38)
Jumadil Saputra(36)
Muhammad Turki Alshurideh(35)
Ahmad Makui(33)
Barween Al Kurdi(32)
Hassan Ghodrati(31)
Basrowi Basrowi(31)
Sautma Ronni Basana(31)
Mohammad Khodaei Valahzaghard(30)
Haitham M. Alzoubi(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)


» Show all authors

🌍 Countries

Iran(2199)
Indonesia(1319)
Jordan(847)
India(808)
Vietnam(512)
Saudi Arabia(503)
Malaysia(458)
China(232)
United Arab Emirates(231)
Thailand(163)
United States(116)
Egypt(116)
Turkey(115)
Ukraine(114)
Peru(96)
Canada(95)
Morocco(94)
Pakistan(87)
United Kingdom(80)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Utilizing simulation to evaluate production line performance under varying demand conditions Pages 3-14 Right click to download the paper Download PDF

Authors: Thomas McDonald, Eileen Van Akenb, Kimberly Ellib

doi 10.5267/j.ijiec.2011.08.011 Crossmark

Keywords: Bottlenecks, Manufacturing, Simulation

Abstract:
Determining how a new production cell will function is problematic and can lead to disastrous results if done incorrectly. Discrete-event simulation can provide information on how a line will function before, during, and after the line is in operation. A simulation model can also provide a visual animation of the line to see how product will flow through the line. This paper discusses the development and analysis of a simulation model of a new manufacturing line. The manufacturing cell is a new motor assembly cell. An analysis of the capability of the line for varying demand levels was conducted for the two main motor types produced on the line. An ARENA® simulation model was developed, verified, and validated to determine the daily production and potential problem areas for the various demand levels. The results show that at all but one demand level, the line is capable of producing to within one unit of customer demand if the required number of workers is present. At the highest demand level, the simulation results suggest that the line is not capable of meeting demand. Additional analysis indicates that multiple workstations could prove problematic with minor fluctuations in demand. Problematic workstations were identified for each assembly area and for the line as a whole.
Details
  • 51
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: IJIEC | Year: 2012 | Volume: 3 | Issue: 1 | Views: 2712 | Reviews: 0

 

® 2010-2026 GrowingScience.Com