Processing, Please wait...

  • Home
  • About Us
  • Search:
  • Advanced Search

Growing Science » Authors » H Kazemipoor

Journals

  • IJIEC (747)
  • MSL (2643)
  • DSL (668)
  • CCL (508)
  • USCM (1092)
  • ESM (413)
  • AC (562)
  • JPM (271)
  • IJDS (912)
  • JFS (91)
  • HE (32)
  • SCI (26)

Keywords

Supply chain management(166)
Jordan(161)
Vietnam(149)
Customer satisfaction(120)
Performance(113)
Supply chain(110)
Service quality(98)
Competitive advantage(95)
Tehran Stock Exchange(94)
SMEs(87)
optimization(86)
Financial performance(83)
Trust(83)
TOPSIS(83)
Sustainability(81)
Job satisfaction(80)
Factor analysis(78)
Social media(78)
Knowledge Management(77)
Artificial intelligence(77)


» Show all keywords

Authors

Naser Azad(82)
Mohammad Reza Iravani(64)
Zeplin Jiwa Husada Tarigan(63)
Endri Endri(45)
Muhammad Alshurideh(42)
Hotlan Siagian(39)
Jumadil Saputra(36)
Dmaithan Almajali(36)
Muhammad Turki Alshurideh(35)
Barween Al Kurdi(32)
Ahmad Makui(32)
Basrowi Basrowi(31)
Hassan Ghodrati(31)
Mohammad Khodaei Valahzaghard(30)
Sautma Ronni Basana(29)
Shankar Chakraborty(29)
Ni Nyoman Kerti Yasa(29)
Sulieman Ibraheem Shelash Al-Hawary(28)
Prasadja Ricardianto(28)
Haitham M. Alzoubi(27)


» Show all authors

Countries

Iran(2183)
Indonesia(1290)
India(787)
Jordan(786)
Vietnam(504)
Saudi Arabia(453)
Malaysia(441)
United Arab Emirates(220)
China(206)
Thailand(153)
United States(111)
Turkey(106)
Ukraine(104)
Egypt(98)
Canada(92)
Peru(88)
Pakistan(85)
United Kingdom(80)
Morocco(79)
Nigeria(78)


» Show all countries
Sort articles by: Volume | Date | Most Rates | Most Views | Reviews | Alphabet
1.

Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing Pages 681-688 Right click to download the paper Download PDF

Authors: H Kazemipoor, R Tavakkoli-Moghaddam, P Shahnazari-Shahrezaei

DOI: 10.5267/j.msl.2011.10.010

Keywords: Mixed integer linear programming, Project scheduling, Simulated annealing

Abstract:
multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes the MSPSP becomes a special type of a multi-mode resource-constrained project scheduling problem (MM-RCPSP) with a huge number of modes. Given the importance of this issue, in this paper, a mixed integer linear programming for the MSPSP is presented. Due to the complexity of the problem, a meta-heuristic algorithm is proposed in order to find near optimal solutions. To validate performance of the algorithm, results are compared against exact solutions solved by the LINGO solver. The results are promising and show that optimal or near-optimal solutions are derived for small instances and good solutions for larger instances in reasonable time.
Details
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5

Journal: MSL | Year: 2002 | Volume: 2 | Issue: 2 | Views: 3452 | Reviews: 0

 

® 2010-2026 GrowingScience.Com